CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.

Slides:



Advertisements
Similar presentations
Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
The role of CDM in technical change in refrigeration - current CDM regulations - successful CDM projects and methodologies - failed projects and methodologies.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
CDM Baseline, additionality, leakage and monitoring plan Executive Training on the CDM, Jakarta
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
Carbon Finance and Opportunities in Africa Patrick Karani BEA International.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Carbon Revenue and MFIs: Making it Work Marco van der Linden Ramesh K. Gautam.
Where is the CDM’s future? Some critical observations and reform proposals Oxford, September 19 th 2005.
1 Formato de um PDD. 2 índice Formato de um PDD Descrição geral da atividade do projeto Aplicação de uma metodologia de linha de base e monitoramento.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
What JCF observed in its
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Presentation transcript:

CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues

Contents CDM as one incentive option –Additional revenue from CDM –How CDM increase the financial feasibility of the project Baseline –Definition and principles –Where in CDM process? –Baseline scenario –Baseline methodology Additionality –Definition –Demonstration of Additionality Leakage Monitoring Methodology

CDM as an incentive

CDM Scheme in a project Transaction cost in addition to the underlying project financing Additional stream of income during the operation stage

Traditional Project cycle Vs CDM Feasibility Study/Design/Environment al Impact Assesment Construction stage Financing CDM Documentation (Due dilligence, PDD) Operation stage Verification CER Payment Transaction, negotiation Registration Legend:: Expenses : Income

Carbon Funds for CDM Purchase of Emission Credits from Projects that generate GHG emission reductions Most of CER buyers conduct the forward purchase contract through an ERPA Few buyers are open for equity participation and/or provision of debt using ERPA as the collateral Buyers: –Multilateral funds –Bilateral Funds –Brokers –Private entity

8

How much does it cost? For a project with 33,000 t CER/year Assumption: 8 US$/CER

Expense and Fees related to Post-Registration Activities Verification expense by DOE: 10,000 US$ Share of proceeds –CERs issuance charges NIL for all project generating CERs < 15,000 every year 0.1 US$/ CER (for the first 15,000 CERs) 0.2 US$/CER (for CERs>15,000/year) –Adaptation 2 % of CERs issued

Baseline

Baseline Definition Marrakech accords, modalities and procedures for CDM, article 44: “……. the scenario that reasonably represents the anthropogenic emissions by sources of greenhouse gases that would occur in the absence of the proposed project activity ….”

Concept GHG emissions (Ton of CO2 eq) Time (Years) In the absence of the project (baseline) Project Real, long term and measurable emission reductions

Baseline Scenario Marrakech accords, modalities and procedures for CDM, article 48: a)Existing actual or historical emissions, as applicable; or b)Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment; or c)The average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20 per cent of their category Baseline scenario should take into account national and/or policies and circumstances

Where in CDM Process? Submission of Project Design Document (PDD) including application of Baseline and Monitoring methodology

Project Design Document CONTENTS A. General description of project activity B. Application of a baseline and monitoring methodology C. Duration of the project activity / crediting period D. Environmental impacts E. Stakeholders’ comments Annexes Annex 1: Contact information on participants in the project activity Annex 2: Information regarding public funding Annex 3: Baseline information Annex 4: Monitoring plan

Baseline methodologies Approved and consolidated baseline methodologies (EB) Proposed new methodology

Baseline methodologies 31 Approved methodologies 9 Consolidated methodologies Small scale methodologies

Baseline methodologies: Renewable energy

Baseline methodologies: Energy efficiency/fuel switching

Application of approved methodologies Small scale renewable energy connected to the Grid: Application of AMS I.D for installed capacity < 15 MW –Biomass: Rice husk, palm kernel shell, bagasse –Mini Hydro projects –Wind, Solar power generation connected to the grid

Application of approved methodologies Small scale renewable energy: Electrical energy generation by the user, mechanical energy for the user, and thermal energy for the user –Utilization of Combined Solar, Wind and Biomass for a Small Agro-Processing Unit Solar cooker

Application of Approved Methodology Renewable energy or natural gas power plant connected to the grid, Large scale –Geothermal projects –Hydropower projects –Natural gas combined cycle

Additionality Marrakech accords, modalities and procedures for CDM, article 43: “A CDM project activity is additional if anthropogenic emissions of greenhouse gases by sources are reduced below those that would have occurred in the absence of the registered CDM project activity”

Additionality –The definition is not sufficient to guarantee the environmental integrity of a CDM project –Tools to demonstrate additionality (EB) –COP/MOP Decision: call for input to simplify/improve current additionality tool –Provide evidences!

Tool to demonstrate additionality Identification of alternatives to the project activity; Investment analysis to determine that the proposed project activity is not the most economically or financially attractive; and/or Barriers analysis; Common practice analysis; and Impact of registration of the proposed project activity as a CDM project activity

Leakage Marrakech accords, modalities and procedures for CDM, article 51: “Leakage is defined as the net change of anthropogenic emissions by sources of greenhouse gases which occurs outside the project boundary, and which is measurable and attributable to the CDM project activity”

Monitoring Methodology Monitoring plan: –Monitor baseline emissions –Monitor project emissions –Monitor leakages –Estimation and calculation of emission reductions –Address the uncertainty (data) –Quality assurance/Quality control –Monitoring management –Designated system/human resources Be consistent with the algorithm/methodology used to estimate the Baseline and Project emissions

Monitoring Plan

Challenges: Lessons learned It takes time! Developing baseline scenarios Argumentation and evidences to demonstrate additionality Spend time in developing the methodology for leakage Use approved methodologies!

More information on the Carbon Finance, World Bank Jakarta Contact: Josef Leitmann Farida Zaituni