Noncoal Program Fees. Applicable Regulations Chapter 77 (Noncoal Mining) Chapter 102 (Erosion and Sedimentation Control) Chapter 105 (Dam Safety and Waterways.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.

Regulating Selenium in Discharges Kenneth Politan Division of Mining & Reclamation.
/ /17 32/ / /
Reflection nurulquran.com.
1 Copyright © 2009, Oracle. All rights reserved. B Table Descriptions.
Worksheets.
RM WD-97 WD-101 WD-102 WD-124 a IIIh-H : RM110 (2.1) Hainan c agGY Ia-1 (2) Anhui agGY Ia-2 (3) agGY Ia WD-2 WD-8 WD-36 agGY Ia
Addition and Subtraction Equations
To Next Slide Unit 1 Chapter 1 Lesson 2 Rivers Change the Land 20 Questions!
To Next Slide Unit 5 Chapter 10 Lesson 4 Sharing A River 20 Questions!
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Surface Mine Safety Regulation 25 PA Code Chapter 209.
Summative Math Test Algebra (28%) Geometry (29%)
5 th - Number Sense. 1. Which is the same as 13? A B. 10 × 3 C D. 1 × 3.
ASCII stands for American Standard Code for Information Interchange
S. C. Stormwater Management and Sediment Reduction Regulations Dwayne E. Creel, P.E. Manager, SCDHEC Stormwater, Agricultural and Dams and Reservoir Safety.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Ideal Gas Law. For every problem we have done, we also could have used the ideal gas law. On the test you will have to do a couple of problems with the.
Phase II Municipal Separate Storm Sewer System (MS4) Permits Patricia Foran & Cindy Hooper Storm Water & Pretreatment Team.
CHAPTER 102 REGULATIONS REVISIONS TO AGRICULTURAL SECTION.
Slide P- 1. Chapter P Prerequisites P.1 Real Numbers.
Ocean Water Chemistry Earth’s Water Chapter 4.3 Pages
Earth’s Water Chapter 4.3 Pages
City Council Meeting Agenda Items October 28, 2013.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
Doc.: IEEE /0333r2 Submission July 2014 TGaj Editor Report for CC12 Jiamin Chen, HuaweiSlide 1 Date: Author:
Idaho Water Supply Committee Meeting Southwest Idaho Report April 11, 2014.
2 Graphs and Functions © 2008 Pearson Addison-Wesley. All rights reserved Sections 2.8.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Environmental Streamlining Task Force Water Quality Ordinance April 5, 2012.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Clean Water Act (CWA) (1977, 1981, 1987). Description and Affects This Act was put into place in order to regulate the amount of pollutants that were.
Landforms change by processes A process is the act of doing or making something by following a set of steps Example of a process.
Knowing your Legal Requirements Beth Graves EMS Project Coor. NC Division of Pollution Prevention and Environmental Assistance (DPPEA)
1 Best practice – Agriculture and water quality in Norway Inga Greipsland Bioforsk.
Mine Reclamation and Enforcement Director Billy A. Ratliff Office Cell
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Mining Enviro 2 Go Mining Objectives- You should be able to: Describe several methods of mining Describe important potential environmental consequences.
Anatomy of Iowa Floods: Preparing for the Future “How urban and rural Iowans work together to reduce flood impacts.” Wayne Peterson, Division of Soil Conservation.
Pretreatment 101 Training Course Sponsored by U.S. Environmental Protection Agency, States of Region 6 And the Region VI Pretreatment Association.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Trees protect the earth’s surface because… they act as a shield against the wind.
Ordinance No. 489 BMC Chapter SURFACE WATER MANAGEMENT.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
NPDES Permit Application and Annual Fees NPDES Permits NPDES Permits are issued for the discharge of municipal, industrial, or commercial (non- storm.
Chapter 8 – Earth Science Content Objective: Describing changes in the earth’s surface Vocabulary: -Erosion -Deposition -Slope -Vegetation Language Objectives:
TDEC Regulatory Update and Clarification for Rock Harvesting Mr. Michael Swanger – DWR Mining Section.
Chapter 16: Mining and Mineral Resources
We have talked about… Groundwater Surface water Watersheds.
Land and Water in Your Area. The surface features of a place. geography.
General Water Obstruction and Encroachment Permits Presented by NCRO Watershed Management Program.
105 Updates and Top Challenges For SEPA RC&D Engineer’s Workshop Montgomery County Community College May 24, 2016.
Pollution Control: For Field Office Construction Sites.
Noncoal Program Fees Environmental Quality Board April 17, 2012 John Stefanko Deputy Secretary for Active and Abandoned Mining Operations.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Human Impact on Soil and Erosion  Human Activity is the main force of speedy (accelerated) erosion.  Land-Use Practices that can harm soil 1. Farming.
Municipal Separate Storm Sewer System (MS4) Permit
Mining.
Rock Cycle & Mining.
Surface Mining Control and Reclamation Act of 1977 (Simon K)
Goal
Mining.
Presentation transcript:

Noncoal Program Fees

Applicable Regulations Chapter 77 (Noncoal Mining) Chapter 102 (Erosion and Sedimentation Control) Chapter 105 (Dam Safety and Waterways Management) Chapter 92 (NPDES) and 93 (Water Quality Standards) Chapter 96 (Water Quality Standards Implementation) Chapters 121, 123, 127 and 129 (Air) Chapter 209 (Surface Mine Safety) and 211 (Explosives)

Permittees-as of the end of 2009 There were 1547 entities that hold permits

Existing Permits-as of the end of 2009 Large –691 Active –31 Inactive 10,000 Ton –291 Active –6 inactive Small (<=2000 Ton) –1231 Active –32 Inactive

Permits About 600 applications a year are processed

Inspections Calendar Year 2008 –6069 Routine Inspections –425 Blasting Inspections Calendar Year 2009 –6308 Routine Inspections –397 Blasting Inspections

Noncoal Act Fee Language The department is authorized to charge and collect from persons a reasonable filing fee, which shall not exceed the cost of reviewing, administering and enforcing the permit.

What do other states do? Ohio New York Maryland West Virginia

Ohio Filing fee $500 on approval $500/yr with annual report, Small (10,000 tons) is $250 Renewal fee $1000 Reclamation fee $75/ac.

New York Permit fee per year: –$400 minor –$700 (up to 5 acres) –$900 (5-10 ac) –$1500 (10-20 ac) –$4000 (20-30 ac) –$8000 (30+ ac)

Maryland Right of entry recording fee $40 Permit fee per year $12/ac ($1000 max) Reclamation fee $30/ac

West Virginia Permit application $1000 $1000 at permit issuance Renewal/transfer/major rev. $500 Minor rev. $200 NPDES-new and renewal $1,000 Annual NPDES permit fee $1,000

Draft Fee Proposal Fees to pay for the cost of: –Permit review –Inspection (administering the permit) Calculations based on Workload Analysis –Hours for Review –Inspection Time –Personnel Costs (salary & benefits)

Rulemaking Process Amend Chapter 77 to incorporate new fees –Proposed Rulemaking (EQB) –Subject to comments Public Legislative Committees Independent Regulatory Review Commission –Public Hearings –Response to Comments (C & R document) –Published as Final Rulemaking

Timeline The Draft Regulation is now in the DEP internal review process Environmental Quality Board-June 15 Pa Bulletin in August (?) Hearings in September (?) Final to EQB in 2011

NSMCRA Fund Noncoal Surface Mining Conservation and Reclamation Fund … shall be used by the secretary for the purpose of the revegetation or reclaiming of land affected by surface mining of any minerals, for restoration or replacement of water supplies affected by surface mining operations or for any other conservation purposes provided by this act; and, for such purposes, are specifically appropriated to the department by this act.

Penalty Revenue Fiscal YearAmount 04-05$67, $137, $193, $144, $114,597.00

Environmental Education Fund 5% of penalties are required to go to the EEF.

Enforcement Some enforcement costs are captured through civil penalty assessments (Cost to the Commonwealth) However, only a fraction of the violations (~20%) result in payments

Other Revenue Sources Fiscal YearLicense FeeInterest 04-05$233,356.00$417, $231,373.38$740, $216,280.00$771, $221,100.00$626, $218,800.00$343,837.47

Program Data-Last FY 140 employees 40 Full Time Equivalents About $1.5 M per year for salary costs 40% for benefits puts the personnel costs at about $2.2 M per year Total program cost is about $ 3 M per year

Fee Calculation Basis Workload Analysis –Assigns hours to tasks –Used to manage staff levels Wage Rates Benefits –40% of salary Overhead –About 40% of personnel costs

Workload Analysis Permits –Small Permit-9 hours –Large Permit Groundwater-300 hours No groundwater-200 hours Blast Plan-8 hours Completion Report-10 hours

Inspection Workload Numbers Large –4 per year –7 hours per inspection Small –2 per year –2 hours per inspection

Fee Calculation Example Large permit that will encounter groundwater Workload Time-300 hours Wage Rate-$37.44 per hour 40% benefits 40% overhead 300 X $37.44 X 1.4 X 1.4=$22, Round to $22,025

Other Permit Fee Calculations Small Noncoal$525 Blast Plan$475 Completion Report$600 Large Major Amend-GW$3,850 Large Major Amend-Not GW$1,600 Large Transfer$900

Annual Administration Fee Paid each year Based on type of permit (small or large) Inspection Frequency

Administration Fee Calculation Example Large Noncoal with Blasting 4 inspections per year by the inspector 1 inspection per year by the Blasting Inspector 7 hours per inspection $28.75 per hour for inspector $32.83 for the Blasting Inspector 4 X 7 X $28.75 X 1.4 X 1.4=$ ($1,450) 1X 7 X $32.83 X 1.4 X 1.4=$ ($400) $1,850 per year

Administrative Fee Calculations Permit Category-Permit StatusAnnual Fee Large Surface Mining Permit-Active$1, Large Surface Mining Permit-Active with Blasting$1, Small Surface Mining Permit-Active$ Small Surface Mining Permit-Active with Blasting$ Underground Mining Permit-Active$1, General Permit-Short Term Construction$ All Permits-Not Started$ All Permits-Inactive$100.00

How does the proposal compare with the other states?

Questions, Comments or Suggestions