Department of Environmental Protection CLEAN FILL POLICY

Slides:



Advertisements
Similar presentations
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Advertisements

LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.
Construction & Demo Waste. Landfilling Waste is a Big Deal A study shows 28.7% of waste placed in landfills is construction & demolition waste (C & D.
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures OCC – Chapter 6.
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures HBA – Chapter 6.
Well Permitting & Approvals
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Citizens Guide to Pennsylvanias Land Recycling Program.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Section 1. Buffer Zones. Wastes shall not be placed: (1) Within 250 feet of an intermittent or perennial stream unless a 401 water quality certification.
Date #, 2009Presenter Name Response and Remediation Program Update May 1, 2014Derrick Williams, Program Manager.
Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
The Proposed Part 115 Rules and Waste Utilization East and West Michigan Chapters of the Air and Waste Management Association & The Environmental Law Section.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
7 TH ANNUAL GEORGIA ENVIRONMENTAL CONFERENCE AUGUST 22-24, 2012 GEORGIA’S VOLUNTARY REMEDIATION PROGRAM – THE THIRD YEAR presented by DOUG CLOUD M2C2LAW.
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
CCDD Rules and Regulations Salvaging Chad Broege – Thelen Sand & Gravel.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
DRIs After 360. Transportation Methodology § (7) PREAPPLICATION PROCEDURES.— The levels of service required in the transportation methodology shall.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
The Role of the Licensed Site Remediation Professional (LSRP) Paul Sakson, LSRP Paul D. Sakson Associates, Inc.
Copyright © 2004 McGraw-Hill Ryerson Limited 1 PART 8 – SPECIAL LEGAL RIGHTS AND RELATIONSHIPS  Chapter 35 – Environmental Law Prepared by Douglas H.
Connecticut Department of Public Works -- Rebecca Cutler – Environmental Analyst.
Chapter F.A.C. Updates Solid Waste Program.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
Board of County Commissioners PUBLIC HEARING January 5, 2010.
Waste Management Overview & Land Disposal Restrictions.
TRB: Waste Management and Resource Efficiency Workshop July 2011 Tom Roick, Senior Policy Analyst Oregon Department of Environmental Quality Oregon DEQ’s.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
Overview of the Land Recycling Program (Voluntary Cleanup Program)
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Board of County Commissioners PUBLIC HEARING January 11, 2011.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
1 Draft Final Safe Fill Regulations. 2 W hat’s new in Safe Fill Definition? Definition is short as a result of: – Due diligence procedures moved to existing.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
BIOSOLIDS USE AND REGULATION IN PENNSYLVANIA PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
1 Draft Final Safe Fill Regulations Major Changes/Revisions Presented to the CSSAB November 8, 2002.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
2017 Environmental Trade Fair Shannon Gibson
Sustainable Redevelopment
TPDES Construction Management at the City of Laredo
Georgia Inert Landfill Regulations
Westbrook Contractor Safety Training April 5, 2018
Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.
Georgia Update Jeff Cown Land Protection Branch
TPDES Construction General Permit Compliance
2018 Environmental Trade Fair Shannon Gibson
Institutional Controls At Voluntary Cleanup Sites
Presentation transcript:

Department of Environmental Protection CLEAN FILL POLICY Cleanup Standards Scientific Advisory Board May 6, 2004

CLEAN FILL POLICY

Definition of Clean Fill Uncontaminated inert solid material Includes soil, rock, stone, dredged material, used asphalt, and brick, block or concrete from C&D activities Uncontaminated – unaffected by spill or release, or if affected, levels are below residential SHS

Definition of Regulated Fill Soil, rock, stone, dredged material, used asphalt, historic fill, and brick, block or concrete from C&D activities affected by a spill or release Concentrations of regulated substances exceed residential SHS, but meet nonresidential SHS

POLICY Used to determine if material qualifies as clean or regulated fill Does not apply to mine land reclamation activities subject to a permit Excavation, movement or reuse within project area or ROW does not require a SWMA permit

Fill Determination Environmental due diligence If no evidence of release, material may be managed as clean fill If evidence of a release, material must be tested to determine if it is clean or regulated fill Analytical testing or sampling only required if evidence of a release of a regulated substance

Management of Clean Fill Use of material as clean fill does not require a permit under the SWMA Clean fill may be used in an unrestricted manner Use of clean fill is still regulated under other environmental laws and regulations, e.g., Chapter 102 and Chapter 105

Management of Clean Fill Any person placing clean fill that has been affected by a release must certify the origin of the material and the results of analytical testing used to determine that it is clean fill BMP must be used during demolition activities to remove hazardous material from material to be used as clean fill

Management of Clean Fill Clean fill may not contain free liquids based on visual observation or create public nuisances (e.g., objectionable odors) to users of the receiving property or adjacent properties

Management of Regulated Fill Materials identified as regulated fill are waste and must be managed under a permit in accordance with the municipal or residual waste regulations Regulated fill may be beneficially used under General Permit WMGR096 if material meets requirements of that permit May apply for industry-wide beneficial use permit in lieu of the general permit

Exclusions Regulated fill may not be placed on a greenfield property not planned for development Regulated fill may not be placed on a property currently in residential use or planned for residential use unless otherwise authorized

Exclusions Fill containing regulated substances at concentrations exceeding the nonresidential SHS may not be placed as regulated fill but must be managed in accordance with the municipal or residual waste regulations

Exclusions A general permit is not required for remediation activities undertaken entirely on an Act 2 site A general permit is not required if regulated fill from an Act 2 site is used as construction material at a receiving site that is also being remediated to an Act 2 standard.

Appendix A Sampling and Analysis Guidance for Fill determination

Form FP-001 Certification of origin of fill and analytical results

GENERAL PERMIT

Permitted Activities Regulated fill may be beneficially used under General Permit WMGR096 May only be placed on a property approved for construction and zoned commercial/industrial, or if unzoned, used exclusively for those purposes May not blend or process to meet concentration limits

Management of Regulated Fill May not be placed on a greenfield property or residential property May not be placed under the general permit if concentrations exceed nonresidential SHS Fill from dredge material must also meet limit of 250 mg/L for chlorides based on SPLP

Fill Containing Metals Fill containing metals must meet either nonresidential SHS or receiving site background If fill subject to release exceeds SHS, must be placed to eliminate direct contact exposure pathways Background is concentration present before beneficial use activities Background determined by taking representative samples

Notice to Municipality A copy of the registration for fill placement under the general permit must be submitted to each municipality at least 30 days prior to placing fill

Deed Acknowledgments Permittee must provide proof of a recorded deed notice exact location of fill type(s) of fill

Siting limitations Fill shall not be placed within: 100 year floodplain, except for brownfields 100 feet of a sinkhole 50 feet of a dwelling 100 feet of a perennial stream 300 feet of a water source 300 feet of exceptional value wetland, EV water, or HQ water

Construction Activity Construction should begin within one year of date fill placed on property Fill areas shall be promptly revegetated or stabilized if construction not started within 30 days of fill placement

Application Requirements Applicant ID Identify source of fill Identify receiving property documentation that fill meets requirements of general permit proof that use is consistent with general permit

Application Requirements PNDI review for properties >1 acre Proof of municipality notification Proof of right to enter property Compliance history of Applicant

Commencement of Activities 15 days after submittal of registration for brownfields 60 days after submittal of registration for nonresidential greenfields properties > 10 acres properties with waiver of siting limitations

Waste Determination Regulated fill that meets all the requirements of the permit and meets nonresidential SHS shall cease to be waste once placed.

For More Information http://www.dep.state.pa.us/dep/deputate/airwaste/wm/MRW/cleanfill/MgtCleanFillPolicy041304.htm

For More Information James R. Shaw (717) 783-9469 jshaw@state.pa.us Municipal and Residual Waste Central Office staff (717) 787-7381 Regional office staff