1 18-Month Outlook October 2003 - March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.

Slides:



Advertisements
Similar presentations
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Advertisements

Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Implementation of new Information Disclosure Reports Report to MOSC June 4, 2003 Report to MOSC June 4, 2003.
IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Chapter 3 Supply and Demand: In Introduction. Basic Economic Questions to Answer What: variety and quantity How: technology For whom: distribution.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
ERCOT PUBLIC 7/14/ Long-Term Load Forecasting Calvin Opheim ERCOT Manager, Forecasting & Analysis LTSA Scenario Development Workshop July 14, 2015.
Why Normal Matters AEIC Load Research Workshop Why Normal Matters By Tim Hennessy RLW Analytics, Inc. April 12, 2005.
Network Customer Meeting Access Metric Update November 16, 2006.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Financial Risk Management In a Volatile Economy R.Kannan 20 October 2011 Annual CFO Conference – Silicon India.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
Cork June Dynamic modelling of transmission systems: costs of seasonal-zonal transmission loss factor charging and the impact of large-scale offshore.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Generation Adequacy Task Force Update to WMS September 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
Energy Information Adminisration’s Outlook On Natural Gas Arkansas Public Service Commission “The Future Supply And Price of Natural Gas” June 3, 2003.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
2016 Long-Term Load Forecast
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Market Operations Standing Committee of the IMO Market Operations Standing Committee October 22, 2003.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
London, September 17 th 2015 Impact of IFI investments in power generation in the Philippines.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
ELECTRICITY AND TIME- SENSITIVE PRICING Shreyas Muralidharan and Raaghul Senthilkumar.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Hybrid Forecast for Resource Adequacy Analysis with recommendations Massoud Jourabchi April
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
LNBA Subgroup: Avoided Transmission Value
Fundamental Supply Factors Driving Current Market Prices
ENTSO-E Winter outlook 17-18
Independent Load Forecast
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Changes to Reserve Level Declaration Guidelines
Planning Reserve Margin
Progress on Resource Adequacy Assessment for 2017
Market Pricing Initiatives Update September 9th, 2003
Presentation transcript:

1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments

2 Presentation Outline Introduction Demand forecast Resource assessment Transmission assessment Inputs Comparisons Results

3 Separate Presentations This presentation focuses on specific Outlook inputs, comparisons with previous Outlooks and results Another presentation focuses on the market rules, market manuals and the methodology to complete demand forecast, resource assessment and transmission assessment

4 Introduction IMO’s latest 18-Month Outlook covers October March 2005 published September 24, four documents on IMO web-site: 18-Month Outlook (main document) 18-Month Demand Forecast Outlook Methodology Ontario Transmission System spreadsheet tables

5 Demand

6 Demand Forecast actual load, weather, economic data through to the end of June 2003 impact of new data captures the latest relative sensitivity and relationships between load and weather Forecast of economic variables as of July 2003

7 Variable Impact on Daily Peak Demand Temperature >16 C+1C+380 MW Temperature <10C-1C+110 MW Wind Summer-1km/h+10 MW Wind Winter+1km/h+10 MW Christmas Day-4700 MW Monday vs. Sunday+2000 MW

8 Data Impact on Model System increasingly sensitive to high temperatures but rate of increase is slowing System continues to be less sensitive to low temperatures but rate of decrease is slowing Level of economic activity is having a smaller impact on demand due to shifting demand to off-peak times growth non-energy intensive sector of the economy Applies to both peak and energy demand

9 Economic Outlook Outlook for the Ontario economy positive but lower than the forecast in the previous 18-Month Outlook World economic climate Sluggish U.S. recovery Economic data mixed Risk to the forecast is mostly on the “downside”

10 Changes to the Forecast 2003Q3 minus 2003Q2 (monthly)

11 Changes to the Peak Forecast 2003Q3 minus 2003Q2 (weekly)

12 Weekly Peak Demands Actual & Forecast

13 Weekly Peak Demands Actual & Forecast

14 Weather Scenarios November to March

15 Weather Scenarios & November to March

16 Weather Scenarios & November to March

17 Forecast Demands

18 Resources

19 Existing Resources: Total * Bruce “A” units not included

20 New Generation Projects No additional Pickering A units are scheduled to be returned to service during the Outlook period. (in Outlook period and currently under construction)

21 Resource Scenarios Existing Resource Scenario all existing resources one Pickering-A unit is included no new generation project additions 0 MW of price sensitive demand Planned Resource Scenario all existing resources one Pickering-A unit is included new generation project additions 300 MW of price sensitive demand

22 Polling Question On average what level of resources do you expect will materialize over the next 18 months? (a) less than assumed under ERS (b) about the same as assumed under ERS (c ) more than ERS, but less than PRS (d) about the same as assumed under PRS (e) more than assumed under PRS

23 Available and Required Resources Existing Resource Scenario Ontario Market Demand (Normal Weather)

24 Available and Required Resources Planned Resource Scenario Ontario Market Demand (Normal Weather)

25 Reserve Margins: Planned Resource Scenario Ontario Market Demand (Normal Weather)

26 Reserve Margins: Existing Resource Scenario and Planned Resource Scenario Ontario Market Demand (Normal Weather)

27 Reserve Margins: Extreme Weather Existing Resource Scenario and Planned Resource Scenario Ontario Market Demand (Normal Weather) Extreme weather is not expected every week

28 Sources of Risk Demand uncertainty (RR) Forced outage rate of resources (RR) New generation projects coming into service (ERS, PRS) Return of generators from planned outage (ERS, PRS, +) Hydroelectric resource utilization (RR,+) Extreme weather impact (separate scenarios,+)

29 Transmission

30 Transmission Some outages impact internal and inter-tie limits (appendix C of main document) Windsor, Toronto and Thunder Bay reactive supply

31 Overall Conclusions

32 End of presentation