‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

Slides:



Advertisements
Similar presentations
Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.
Thermal Power Station Perform Achieve Trade. Thermal Power Plants in PAT - I  Total No of DCs = 144  Threshold limit to be DC = 30,000 tons of oil equivalent.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Madhya Pradesh Electricity Regulatory Commission Terms and Conditions of Tariff MPERC Comments on CERC Discussion Paper.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
POWER GENERATION TECHNOLOGIES
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
CERC DISCUSSION PAPER ON TERMS AND CONDITIONS FOR TARIFF FROM WARM WELCOME TO THE PRESENTATION BY NEYVELI LIGNITE CORPORATION LTD., NEYVELI.
Presentation on CERC Discussion Paper on Tariff Norms By powergrid.
Energy Accounting and Need for Special Energy Meters under ABT Regime.
AVAILABILITY BASED TARIFF. HIGHLIGHTS OF CERC ORDER DATED ON ABT 1. ORDER APPLICABLE TO J&K ALSO. 4. ABT WAS TO BE IMPLEMENTED IN ALL THE REGIONS.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
Regulation and Commercial Issues in Bulk Power Generation Tariff By S.C.SHRIVASTAVA, Joint Chief (Engg) CERC, New Delhi 10/7/20151CERC.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
PRESENTATION On National Hydroelectric Power Corporation Ltd. ( A Govt. of India Enterprise) Sector – 33, Faridabad (Haryana), INDIA “Comments on Discussion.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
Perform Achieve And Trade (PAT) Mechanism
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Electricity pricing Tariffs.
Availability Based Tariff (ABT) in Northern Region.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Smart Grid Tariff Changes
TARIFF DETERMINATION: GENERATION AND TRANSMISSION
Fuel Cost Components in the Fuel Adder
Fuel Cost Components in the Fuel Adder
Experience of R & M from Regulatory Perspective
Electricity Generation: Coal v/s N-Gas - Basic Economics
Fuel Cost Components in the Fuel Adder
Financial Understanding
Electricity Generation: coal v/s n-gas - Basic Economics
Draft Proposed Regulations on Terms & Conditions of Tariff
Draft Proposed Regulations on Terms & Conditions of Tariff
City of Lebanon, Missouri Electric Department
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
Presentation transcript:

‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

NEED FOR ABT LOW FREQUENCY DURING PEAK HOURS ( HZ) HIGH FREQUENCY DURING OFF PEAK HOURS ( HZ) RAPID & WIDE FREQUENCY CHANGES OF 1 HZ WITHIN 5 TO 10 Mts. FOR MANY HOURS IN A DAY VERY FREQUENT GRID DISTURBANCES,CAUSING TRIPPING OF GENERATING STATIONS IN 2 PART TARIFF FC+VC IS BEING CHARGED TO BENEFICIARIES IN PROPORTION TO ACTUAL ENERGY DRAWN

TERMINOLOGY TWO PART ABT 1.FIXED COST*CAPACITY CHARGES 2.VARIABLE COST*ENERGY CHARGES 3.MONTHLY DATA*15 Mts TIME BLOCK 4.JMR READINGS*SEMS READINGS OTHER TERMS kDECLARED CAPABILITY kSCHEDULED ENERGY kUNSCHEDULED INTERCHANGE (UI)

FEATURES OF ABT RLDC WILL REVISE THE SCHEDULE IN CASE OF UNIT OUTAGE.IT WILL BE EFFECTIVE FROM THE 4TH TIME BLOCK COUNTING THE TIME BLOCK IN WHICH REVISION IS ADVICED BY THE GENERATOR TO BE 1ST ONE. IN CASE OF TRANSMISSION LINE BOTTLENECK RLDC WILL REVISE THE SCHEDULE. IT WILL BE EFFECTIVE FROM THE 4TH TIME BLOCK REVISION BY GENERATORS WILL BE EFFECTIVE FROM THE 6TH TIME BLOCK IN CASE OF GRID DISTURBANCE,SCHEDULES OF GENERATION AND DRAWAL SHALL BE DEEMED TO HAVE BEEN REVISED TO ACTUALS.GRID DISTURBANCE & IT’S DURATION WILL BE CERTIFIED BY RLDC IN ABT,TRANSMISSION LOSSES WILL BE APPORTIONED IN PROPORTION TO DRAWALS

TWO PART TARIFF CONCEPTS FIXED PART RECOVERY PLFRECOVERY 0%50% OF FIXED COST 0%-62.78%50%-100% FIXED COST %DEAD BAND >68.48%INCENTIVE STARTS INCENTIVE AT 1 Ps/Kwh FOR EVERY 1% INCREASE IN PLF RISE ABOVE 68.48% (WHICH INCLUDES DEEMED GENERATION )

TWO PART TARIFF CONCEPTS FIXED PART TARIFF INCLUDES 1.RETURN ON EQUITY (ROE)16% 2.DEPRECIATION7.84% 3.INTEREST ON WORKING CAPITAL 4.MISC TAXES 5.O&M COST- WHICH INCLUDES a)EMPLOYEE COST b)REPAIR& MAINTENANCE COST c)OVERHEADS

TWO PART TARIFF CONCEPTS VARIABLE PART RECOVERY AS PER NORMS 1.AUX.POWER CONSPN8.43% 2.COAL HEAT RATE Kcal/kWh 3.OIL HEAT RATE34.28 Kcal/kWh PRICE ESCALATION OF FUEL IS PROTECTED WITH FUEL PRICE ADJUSTMENT. FUEL COST= BASE COST+FUEL PRICE ADJ (FPA) BASE COST AS DETERMINED IN 1992 IS Ps/kWh

APPLICABLE NTPC STATIONS APPLICABLE TO FOLLOWING STATIONS OF NTPC –NR NCTPP-DADRI (4*210 MW) FGUTPS UNCHAHAR (2*210 MW) DADRI GAS ( MW) ANTA GAS ( MW) AURAIYA GAS (663.36) SINGRAULI STPS (2000 MW) RIHAND STPS (1000 MW) –WR KORBA STPS (2100 MW) VINDHYACHAL STPS (1260 MW) KAWAS GAS ( MW) JHANOR GANDHAR GAS ( MW)

APPLICABLE NTPC STATIONS SR –RAMAGUNDAM STPS (2100 MW) ER –FARAKKA STPS (1600 MW) –KAHALGAON STPS (840 MW) –TALCHAR STPS (1000 MW)

COMPONENTS OF AVAILABILITY BASED TARIFF CAPACITY CHARGES: –ANNUAL FIXED CHARGES (AFC)REMAINS UNALTERED TILL NEW NOTIFICATION ON NORMS. (INCLUDING 16 % ROE) –CAPACITY CHARGES AS PER DECLARED EQUIVALENT AVAILABILITY –FROM TO – 0-80 % AV-ANNUAL CAPACITY CHARGES =AFC* AV(%)/ 80 % –EACH BENEFICIARY SHALL PAY AS PER GOI ALLOCATED SHARE.UNALLOCATED SHARE WILL ALSO BE ALLOCATED BY GOI TO THE BENEFICIARIES FROM TIME TO TIME. –ALLOCATION CAN BE SURRENDERED OR TRADED IF NEEDED. –WEIGHTED AVERAGE OF CUMULATIVE CAPACITY CHARGES AS PER DRAFT NOTIFICATION AND ADJUSTED AT END OF FINANCIAL YEAR.

COMPONENTS OF AVAILABILITY BASED TARIFF INCENTIVES: BASED ON SCHEDULED GENERATION ( NO DEEMED GENERATION) FROM TO ABOVE 77 %PLF- 50% OF FIXED CHARGES/Kwh AND ABOVE 90% PLF, RECOVERY WILL BE 50% OF ELIGIBLE INCENTIVE. –PAYABLE AS PER THE INDIVIDUAL ALLOTTED CAPACITY. PAYMENT ON MONTHLY BASIS,YEARLY ADJUSTED.

COMPONENTS OF AVAILABILITY BASED TARIFF ENERGY CHARGES: AS PER EX-BUS :SCHEDULED ENERGY. ENERGY CHARGES=Rate of Energy Charges X Scheduled Generation(Ex-Bus)

Proposed operational norms for energy charges Gross Heat rate –GROSS HEAT RATE OF TURBINE GENERATOR CYCLE:(GHR) –The comparison of norms with actual is given below for Ramagundam:in kcal/kWh at loading of UnitsSteam Pr100%80 %60 %50 % Stg I 150 kscNorms Actual Stg II 170kscNorms Actual

Proposed operational norms for energy charges STEAM GENERATOR EFFICIENCY:(SGE) –SG EFFICIENCY:(SGE) –SGE % = (50A+630(M+9H)) GCV A-ASH CONTENT%,M-MOISTURE%,H-HYDROGEN% GCV= GCV(AS RECEIVED)-100 kcal/kWh M is increased by 1% to take into account heat lost. DAILY NET HEAT RATE:(DNHR) DNHR= GHR*100 * AEC SGE AEC=NORMATIVE AUX.ENERGY CONSUMPTION

Proposed operational norms for energy charges –AUX.ENERGY CONSUMPTION: –For Ramagundam unit with run of mines coal and closed cycle cooling using wet cooling tower the norms given are: –Stage I9.0 % instead of 9.5 % earlier –Stage II 7.5 % instead of 8.0 % earlier –Station AEC7.93% instead of 8.43% earlier.

COMPONENTS OF AVAILABILITY BASED TARIFF UNSCHEDULED INTERCHANGES (UI): –UI GEN / DRWAL = (ACTUAL GEN / DRAWL - SCHEDULED GEN / DRAWL) –CALCULATED WITH 15 MIN TIME BLOCK. –RATES BASED ON AV.FREQUENCYOF THE TIME BLOCK AVG..FREQUENCY( HZ)UI RATE ( PS / kWh) 50.5 AND ABOVE0.00 BETWEEN AND BETWEEN AND BELOW BETWEEN AND 50.5 LINEAR IN 0.02 HZ STEP. 5.6 Ps/kWh TO BE CALCULATED

OTHER ISSUES IN AVAILABILITY BASED TARIFF SCHEDULING : AS PER IEGC CODE. DEMONSTRATION OF DECLARED CAPABILITY: RLDC MAY ON ITS OWN OR REQUESTED BY BENEFICIERIES ASK FOR DEMONSTRATION OF DECLARED CAPABILTY. PENALTY ON FAILING TO DEMONSTRATE / MIS DECLARATION: –TWO DAYS FIXED CHARGES FOR FIRST TIME. –FOUR DAYS FIXED CHARGES FOR SECOND TIME. –SAME WAY IN GEOMETRICAL PROGRESSION. –CONTINUED GAMING BEYOND FIVE TIMES IN A YEAR CAN BE DEALT AS PER SECTION 45 OF ERC ACT.

OTHER ISSUES IN AVAILABILITY BASED TARIFF METERING AND ACCOUNTING: –METERING -INSTALLATION,TESTING,OPERATION -MAINTENANCE OF METERS AND COLLECTION- TRASNSPORTATIONAND PROCESSING OF DATA REQUIRED FOR ACCOUNTING OF ENERGY CHARGES AND AVAILABILITY, FREQUENCY ON 15 MIN BLOCK SHALL BE PROVIDED BY PGCIL/RLDC. –DATA PROCESSED SHALL BE SUPPLIED BY RLDC TO REB FOR REGIONAL ENERGY ACCOUNTING AND UI CHARGES FOR BILLING ON MONTHLY BASIS.

FINAL ABT ORDER TARGET GENERATION IS SET AT 80% AVAILABILITY INCENTIVE STARTS AT 77% PLF (SCHEDULED GENERATION) NO DEEMED GENERATION CONCEPT INCENTIVE AS 50% OF FIXED CHARGES/Kwh FOR GENERATION BEYOND 77% PLF WITH A CEILING OF 21.5 Ps/Kwh. BEYOND 90% PLF, INCENTIVE WILL BE ONLY 50% OF THE INCENTIVE ELIGIBLE. ROE IS RETAINED AT 16% ALL OPERATIONAL NORMS ARE RETAINED AS OF NOW

FINAL ABT ORDER SETTLEMENT PERIOD PROPOSED - DAILY BASIS (INSTEAD OF 15 MINUTES) SEC.FUEL OIL CONSPN - 2ml/kwh (PROPOSED) (INSTEAD OF 3.5 ml/kwh) AUX.POWER CONSPN - REDUCED BY 0.5% (EARLIER 8.43%) - PROPOSED HEAT RATE CORRECTION - 4% INSTEAD OF 10% AS REQUESTED BY NTPC (PROPOSED) BOILER EFFICIENCY CORRECTION % INSTEAD OF 3.72% AS REQUESTED BY NTPC HEAT RATE,COAL CONSPN,SEC.F.O CONSPN,PLF,AVAILABILITY,AUX.POWER DATA TO BE SUBMITTED TO CERC QUARTERLY TO SET THE NORMS IN THE NEXT REVIEW OF TARIFF FIXATION IN THE YEAR 2004

FIXED COST CALCULATION 1st Month = (1xACC1)/12 2nd Month = (2xACC2-1xACC1)/12 3rd Month = (3xACC3-2xACC2)/12 4th Month = (4xACC4-3xACC3)/12 5th Month = (5xACC5-4xACC4)/12 6th Month = (6xACC6-5xACC5)/12 7thMonth = (7xACC7-6xACC6)/12 8thMonth = (8xACC8-7xACC7)/12 9th Month = (9xACC9-8xACC8)/12 10th Month = (10xACC10-9xACC9)/12 11th Month = (11xACC11-10xACC10)/12 12th Month = (12xACC12-11xACC11)/12 ACC:1-12 REPRESENTS THE AMOUNT OF ANNUAL CAPACITY CHARGES, CORRESPONDING TO THE AVAILABILITY FOR THE CUMULATIVE PERIOD UPTO THE END OF CALCULATED MONTH

CONCERNS FOR NTPC,RAMAGUNDAM: CAPABILITY DECLARATIONS ARE CONSIDERED FOR EQUI.AVAILABILITY.HENCE IT NEED TO BE FAIRLY ACCURATE. UNDER DECALRATION MAY NOT FETCH ANYTHING BUT OVER DECLARTION WILL BE PENALISED HEAVILY DUE TO LOWER FREQUENCY RANGE. INTENTIONAL OVER DECLARATION CAN BE PUNISHED HEAVILY IF WE ARE UNABLE TO DEMONSTRATE WHEN REQUESTED. UNIT TRIPPINGS / OUTAGES WILL ALWAYS ATTRACT UI. NO DEEMED GENERATION ON PLF FOR BACKING DOWN. AS PLF (WITHOUT DEEMED GEN ) IS USED FOR INCENTIVE, DURING HIGH FREQUENCY TIMES,GENERATING ABOVE THE SCHEDULE WILL NEITHER EARN FIXED CHARGES NOR VARIABLE CHARGES.

CONCERNS FOR NTPC,RAMAGUNDAM INCENTIVE PORTION IS REDUCED NORMS IN BOTH CAPACITY AND ENERGY CHARGES ARE YET TO BE REVISED,HENCE PRESENT NORMS REMAINS SAME. ENERGY CHARGES ARE BASED ON SCHEDULED, NOT ON ACTUAL GEN. HENCE STICKING TO SCHEDULE AS PER FREQUNCY IS THE RIGHT WAY. MAJOR EQUIPMENT OUTAGES IN STAGE- II WILL INVITE UI. ONLY IMPROVEMENT IN MARGINAL CONTRIBUTIONS CAN EARN PROFIT

Thank You