Aerial Services Inc. Brief Overview of NAIP 2005 Participation.

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

2008 NAIP Orthoimagery Update Chris Cialek MN Land Management Information Center May 7, 2008.
Transition to Digital Acquisition Presented to USDA Imagery Planning Meeting 12/04/08 By: Alistair Stuart.
FY14 Budget and Caseload Update Fiscal Committee February 3, 2014.
TECH A Look at Software Development Analyze Phase Date: 11/13/2013 Team members: Travis W. Gillison.
World Printing Production Team members: Sean Whitehead,Project Manager William Shamburg,Asst. Project Manager Regan Presley,GIS Analyst Erik Olden,GIS.
Using aerial photography & fertigation to fine-tune N management
Fresno County 4-H Livestock Achievement Program. Overview, Purpose, & Goals WHAT: Fresno County 4-H is starting a Livestock Achievement Program beginning.
NAIP Preview for FSA State Office GIS Specialists February 24, 2010 NAIP 2010.
2015 Summer Care Enhancement Grants Funding Workshop 4/27/15.
NAIP POST-SEASON MEETING December 6, 2005 ACQUISITION TEAM MEMBERS Contractor:# Planes Great Lakes Aerial – OH1 – PA31 Navajo Woolpert – OH2 – Cessna.
2005 NAIP Post Season Summary Surdex Team 2005 NAIP Post Season Summary 6 December, 2005 Ron Hoffmann, President Craig Molander, SVP Business Development.
Imagery for Supporting FSA Farm Programs Review FSA Requirements for Imagery Identify and Evaluate Possible Alternatives Recommend Plan of Action Objectives.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Overview of the National Housing Trust Fund June 3, 2015 U.S. Department of Housing and Urban Development.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Surveyors Conference Project Update for the as of March 2007 Right of Way Data Management System (RWDMS)
USDA Farm Service Agency National Agricultural Imagery Program Presented by Dan Janes, GIS Specialist North Dakota State Office.
Geospatial Concepts for Executives April 11, 2007 Shirley Hall GIS Program Manager USDA-FSA Geospatial Information Systems in the Farm Service Agency.
Wall to Wall Inventory: The Problem of Variability May 12, 2010.
REVIEW OF AIRLINE PERFORMANCE
A erial S ervices I nc. Team 2008 NAIP Post Season Summary 19 November 2008 Kirk Fisher, VP, CFO, Director of Flight Operations Coral Schneberger, CP,
Health Enterprise Zones Update September 19, 2014.
NIROPS Update: Phoenix System and IR Operations in 2012.
2005 USDA Imagery Contracts May 4, 2005 NDOP Steering Committee Meeting Asheville, North Carolina W. Geoffrey Gabbott, Contracting Officer USDA, FSA, Aerial.
Farm Service Agency National Agriculture Imagery Program (NAIP) Pecora Conference November 13, 2002 Denver, Colorado Kent Williams, USDA FSA Aerial Photography.
2005 NRI Photography Report Dorsey Plunk National Cartography and Geospatial Center Fort Worth, Texas.
Advanced Ortho Image Processing IGIC Advanced Ortho Image Processing Outline ■About Surdex ■Digital Acquisition Trends ■Image Processing ■Image.
Acquiring Aerial Photos Where and how to get aerial photography.
Welcome to the Interactive Survey System. 2 What Is the Interactive Survey System? Online, interactive version of the documents needed for NCQA accreditation,
National Agriculture Imagery Program Potential Program Changes USDA Planning Meeting Salt Lake City, Utah December 4-6, 2006 Kent Williams NAIP Program.
FSA State Office NAIP Training Kent Williams Cindy Sessions David Davis Brian Vanderbilt June 15, 2006.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
1 Coordinator’s Report VGIN Advisory Board Dan Widner Coordinator, Virginia Geographic Information Network January 7,
December 2, 2008 Salt Lake City, Utah W. Geoffrey Gabbott, Contracting Officer USDA, FSA, Aerial Photography Field Office USDA Imagery Planning & Coordination.
National Agriculture Imagery Program (NAIP) National States Geographic Information Council September 15, 2003 Nashville, Tennessee W. Geoffrey Gabbott,
2007 NAIP Request for Information USDA Planning & Coordination Meeting John Mootz USDA-FSA-APFO December 7, 2006.
> The Geospatial Experts 2005 NAIP Post Season Meeting Lessons Learned Jaymes Pardue, Senior Account Manager Paul Currie, Project Manager December 06,
by: Drs.Mangapul P.Tambunan,M.Sc. Laboratory of GIS/RSDepartment of Geography University of Indonesia.
USFS - Region 6 Imagery Program. Landsat TM 25+ scenes downloaded from MRLC Landsat Science collection.
Wisconsin Aerial Imagery Ted Koch, Wisconsin State Cartographer’s Office WLIA 2005 Annual Conference February 24 th, 2005 Wisconsin Aerial Imagery
2005 NAIP Survey Brian Vanderbilt X240
Small Area Aerial Photography Contract December 5 - 9, 2005 Salt Lake City, Utah Geoff Gabbott, Sherry Holyoak, Jacque LaCroix USDA, FSA, Aerial Photography.
Ortho Imagery Color and IR Coeur d’Alene Tribe Frank Roberts, GIS Manager.
Contra Costa County Orthophoto Project Coordinated Partnership of CCC, CC Clean Water Program, Iron House and Central CC Sanitation District Presented.
North West Group.  Team resources:  7 Cessna Conquest’s  9 ADS40-II SH52 sensors  Used 2008 season (Peak):  7 Conquests  7 ADS40’s  EarthData and.
USDA - FSA Aerial Photography Field Office NAIP 2005 Dec 6, 2005 Christopher Maika Triathlon Ltd. Sales Director, Mapping MDA GSI (Geospatial Services.
Capstone Project Phase Two! Design Phase – Functional Specification Document.
1 Orthophotography Update Wendy Stout Geospatial Program Manager Virginia Geographic Information Network October 9,
National Agriculture Imagery Program NAIP Contract Overview May , 2006 NDOP Steering Committee Meeting Syracuse, New York W. Geoffrey Gabbott, Contracting.
Woody Biomass Outreach Training, September 11-12, 2007 Transport, Storage and Drying of Woody Biomass Richard M. Schroeder & Matt Langholtz, BioResource.
AERIAL FREE-TO-GROW SURVEYS ForestCor Inc. Proposal for.
2005 Statewide Orthophotography Control February 20, 2008 Indiana GIS Conference By Ryan C. Swingley, LS USI Consultants Thomas A. Mahon, PE, LS Woolpert.
 An aerial overlay of the Clay County Jail property provided by engineers from Kruse, Cate and Nelson, of Spencer. Note the Proposed Sections…
2006 Index Scanning Project Photo, Line, and Spot Indexes Brian Vanderbilt GIS Specialist USDA Farm Service Agency Aerial Photography Field Office
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
National Agriculture Imagery Program 2006 NAIP Contract Plans December 5, 2005 USDA NAIP Planning Meeting Salt Lake City, Utah W. Geoffrey Gabbott, Contracting.
© 2006, The Sanborn Map Company, Inc. Privileged and confidential information. Distribution or copying prohibited unless approved in writing NAIP.
1 Project Update and Summary of Project Priority List (PPL) Activity February 11, 2016 ERCOT Public.
12/12/ NAIP Post-Mortem Review John Mootz.
U.S. Dept of Agriculture 1-m Orthophotography 2008 NAIP Post-Mortem Meeting 19 November 2008 Peter Briere Senior Program Manager, 3001 contact: ;
1 State of Georgia (GTA) Desktop Inventory Workshop March 16, 2009 © 2009 IBM Corporation IBM.
Satellite Image Pixel Size vs Mapping Scale
Right of Way Data Management System (RWDMS)
HIV/AIDS Community Information Outreach Program
Organizational Aspects of Multi-Agency Imagery and LiDAR Programs
2009 Market Rate Study Overview and Update.
SWORPS Basic Training 101 Welcome to the Sworps portion of The 2013 Summer Symposium. I am Don Kenworthy, your Technical Support.
San Diego Housing Commission Final Bond Authorization for West Park
SITE Minnesota Where business is done 1:1
Presentation transcript:

Aerial Services Inc. Brief Overview of NAIP 2005 Participation

Awarded Project Areas Minnesota 2m – 5,889 DOQQ 11,937 Exposures 87 Counties Iowa 2m – 4,181 DOQQ 8,389 Exposures 99 Counties

Time Line of Start March 28-April 1: Onsite Training of Sub-contractors Scan – AT – Ortho Production May 21: Official Notice of Award June 1: Start of Minnesota Fly Window June 15: 1 st Day of Minnesota Acquisition June 15: Start of Iowa Fly Window June 23: 1 st Day of Iowa Acquisition

Team ASI – Photo Acquisition Only used four of the eight aircraft available No extensions needed ABGPS collected for all exposures

Flight Summary Project Area First Day of Photography Last Day of Photography Number of Days Actually Used for Acquisition Number of Days in Season % of Allowed Days FlownExtension Reasons Minnesota 06/15 [06/01] 08/28 [08/31] % No Extensions Finished 3 days early Iowa 16/23 [06/15] 08/29 [09/15] % No Extensions Finished 18 days early Dates in brackets are actual contract dates for project areas

Number of Days Flown Year Total # of Days from start of flight to finish: IA and MN Avg. # of Days flown per aircraft

Photo Acquisition: Daily Maximums Year Maximum # of Miles Flown in one day by one aircraft Maximum # of Exposures Flown in one day by one aircraft Number of DOQQ’s Covered 20051, , ,

Photo Acquisition: Daily Averages Year Avg # of Exposures Flown per day/per aircraft Avg # of DOQQ Covered per day/per aircraft Avg # of Miles: per day/per aircraft

Team ASI Per Aircraft Averages Year Average Exposures per Aircraft per Season Average DOQQ’s per Aircraft per Season Average # of Miles per Aircraft per Season 20055,2652,63311, ,5602,78012, ,2972,64911,442

Photo Acquisition Problems Nothing to speak of – normal stuff

Team ASI Scanning Scanning: Multiple site locations – Subs given base scan to match Five of eight scanners available were used Capacity used 60-75% FTP site and USB Hard Drives used to share data between ASI and Sub-contractors ASI purchasing new scanner

Team ASI Analytics Used 25% of ASI analytic capacity ASI visited each site for pre-project training All production facilities using same software Avg. block size contained +/- 500 frames Turn Around Time Per Block: 24 hours Data pulled from sub-contractor and completed by ASI to facilitate faster delivery

Team ASI Ortho Production Database - On going improvements Sub-contractors were able to utilize real-time database ASI did all of Iowa and a portion of Minnesota Subs did the remainder of Minnesota Orthorectification ASI capacity was under utilized due to contracts with sub-consultants Mosaicking and tonal balancing of data from multiple sites - few problems due to pre-training

Team ASI: Delivery Summary Project Area 1 st Delivery of CCM Last Delivery of CCM CCM Early Delivery Last Delivery of Final Deliverables DOQQ’s DOQQ Early Delivery Final Delivery Film Film Early Delivery MN 87 counties 08/24 9/21/05 [9/30/05]9 days 09/29/05 [12/29/05]90 days 09/27/05 [12/29/05]92 days IA 99 counties 07/28 9/12/05 [10/15/05]34 days 09/19/05 [01/13/06]117 days 09/27/05 [01/13/06] 108 days Dates in brackets are actual contract dates for project areas

Fuel Price Increase by Year Year Avg. Fuel Prices Fuel Cost Increase from Previous Year 2002$ $ % 2004$ % 2005$ %

Questions–Discussion-Suggestions Aerial Services Inc ASI-4GIS Kirk Fisher Coral Schneberger Mapping Your World