All forecast information reflects planning assumptions as of December 2005. Entergy System Strategic Supply Resource Plan Plan Description (For the planning.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
South Boston Energy Project South Boston, VA
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 3 Overview - EAI Generation Supply Plan Requirements for 2014 Operations.
NGEIR Technical Conference Presentation May 16, 2006.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
The Future of Electric Power In Utah January 12, 2010.
SYSTEM PLANNING 1 OVERVIEW OF FALL 2002 RFP Dave Harlan/ Sue Tierney ENTERGY SERVICES, INC. October 2002 This presentation summarizes certain matters related.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Entergy Arkansas, Inc. Transition Plan Technical Conference #2 July 15, 2010.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 2 Status Update Assessment of Strategic Options and “No Regrets” Implementation.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
1 Fall 2006 Limited-Term RFP ENTERGY SERVICES, INC. September 11, 2006 This presentation summarizes certain matters related to ESI’s Fall 2006 Limited-Term.
THE ECONOMIC FEASIBILITY OF POWER PLANT RETIREMENTS ON THE ENTERGY SYSTEM Presented to the LOUISIANA PUBLIC SERVICE COMMISSION November 9, 2005 Open Session.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 1 City of Port Angeles Above High Water Mark.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Puerto Rico Electric Power
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
SYSTEM PLANNING 1 SPRING 2003 RFP for Supply-Side Resources ENTERGY SERVICES, INC. March 2003 This presentation summarizes certain matters related to ESI’s.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
1 Portfolio Analysis Update Power Committee Discussion August 30, 2004.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Challenges for New Base Load Generation Dave Harlan
NWA Suitability Criteria
Progress on the Renewable Energy IPP Procurement Programme
Panel Session: Next Generation of Market Machines
Update on the Western Region Resource Plan
Manager, Supply Resource Planning
Presentation transcript:

All forecast information reflects planning assumptions as of December Entergy System Strategic Supply Resource Plan Plan Description (For the planning period 2006 – 2015) Appendix H

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Overview 1.Planning Framework 2.Strategic Overview 3.Current Portfolio 4.Load Forecast 5.Retirement Strategy 6.Overview of Plan for 2006 – 2015 Contents This document describes the Entergy System’s (utility) Strategic Supply Resource Plan (SSRP). As described in this document, the SSRP is based on principles and planning objectives adopted by the Operating Committee and provides a long-term resource strategy that will transform the Entergy System’s generation portfolio.

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Supply Objectives Part 1 – Planning Framework Risk Mitigation – Supply Diversity – Mitigate the exposure to major supply disruptions that could occur from concentrated or systematic risks, for example outages of a single generation facility. The supply needs that determine the resource requirements of the Operating Companies are driven by six basic resource supply objectives: Provide adequate resources to meet customer peak demands with adequate reliability. Provide low cost base load resources to serve base load requirements (the firm load level that is expected to be exceeded for at least 85% of all hours per year). Reliability Provide efficient, dispatchable load following resources to serve the time varying load shape levels that are above the base load requirement load levels. Provide a generation portfolio that is more efficient and avoids an over-reliance on aging resources. Mitigate the exposure to price volatility associated with uncertainties in fuel and purchased power costs. Production Cost – Base Load Supply Requirements Risk Mitigation – Supply Diversity Production Cost – Load Following Supply Requirements Generation Portfolio Enhancement Risk Mitigation – Price Stability

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Planning Horizon The SSRP addresses a long-term planning horizon. Other processes address tactical and annual planning supply needs. Part 1 – Planning Framework Identifies resources needed and expected operating roles for the upcoming (or current) operating year. Annual Planning Process Addresses long-term planning horizon. Provides indicative direction for needs over a ten year horizon. Specific resource timing and resource participation will be determined at the time of resource commitment. SSRP Identifies resources needed and expected operating roles for each resource for the forthcoming three year business planning period. Tactical Planning Process

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Steps in Determining Supply Resource Needs Part 1 – Planning Framework Determine the type of generation needed by the System to serve load shapes at the lowest reasonable cost given current expectations and supply options. MIX TYPE 2. – Total resource requirements for 2006 exceed long-term controlled resources by over 2000 MWs. Needs are increasing with load growth. – To solely address peak period reliability, resource needs could be met by annual or seasonal purchases of peaking/reserve capacity. Determine portfolio mix of generation resources that is consistent with planning objectives and practical constraints. Determine the amount of capacity needed by the System to meet peak period reliability. – CCGT or solid fuel resources needed to address base load supply requirements. – Additional CCGT and CT resources are needed to serve load-following requirements. – Power Purchase Strategy guides amount of power purchase and mix of power purchase products – Long-term LOU resource decisions (timing, fuel type, location, OPCO participation) AMOUNT 3. 1.

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Load shape determines functional requirements. ≥ 50 % of hours < 85% of hours ≥ 85% of hours Load Shape Generation Capacity Requirements Hours MW Reserve High Capacity Factor Load-Following BaseLoad Low Capacity Factor Load-Following Load-following represents 50% of capacity, but only approximately 20% of energy. Baseload energy is 80% of total system supply. > 0% of hours < 50% of hours Resource plans consider load shapes in determining the generation requirements needed for each generation supply role. Part 1 – Planning Framework

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Principles and Process for Participation Decisions – Resource acquisitions during the operating year are generally for system reliability or production cost benefits. – Because the Annual Plan provides for adequate resources to meet the expected system needs, additional resources acquired during the operational year generally will be shared based on responsibility ratio. Part 1 – Planning Framework Process Overall Guiding Principles Participation in Purchased Power in Annual Supply Plan Participation in Power for System Needs Acquired During Operating Year Long-term Resource Participation Decisions  Each operating company should support a sufficient amount of generation for each supply role used to serve its load shape.  Resource participation decisions for new resources should consider whether each operating company is supporting capability that can be expected to be available for coordinated economic dispatch sufficient to meet its peak load plus provide a reserve of at least 10% (capability does not include MSS-1 reserves). – Resource participation decisions are made at time of the commitment to the resource. – Preliminary (for planning purposes and subject to change) projected resource participation for future resources that are included in the SSRP are made at the time the resource plan is approved. – The Operating Committee determines participation in new resources considering each Operating Company’s need for the new resource’s expected supply role. – Resource participation decisions are made at the time of the commitment to the resource. – The Operating Committee can specifically assign resources to address the specific needs of the operating companies. – After specific resource participation decisions are made, additional resources are allocated based on factors established by the Operating Committee.

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Factors in Operating Company Participation Part 1 – Planning Framework Supply Risks Relative Total Production Cost Peak Load +10% Reserve Capacity Deficit Baseload Capacity Deficit Load-Following Resource Capacity Deficit Responsibility Ratio Resource participation also will consider supply resource diversity, seeking to reduce the reliability and price risks resulting from and Operating Company’s exposure to single contingency generation outages or from its exposure to generation supplied by one fuel type. Long-term total production cost trends for each Operating Company considering both the overall production costs and the component production costs for each major supply role. Each Operating Company’s resource capability position with regard to a standard seeking to assure that each Operating Company supports its proportionate share of the resources that are expected to be used in the coordinated dispatch in the System’s annual operating plan. The standard seeks to determine participation in new resources by considering those companies who have a “Peak Load +10% Reserve Capacity Deficit,” based upon the Operating Company’s aggregate existing resources (excluding MSS-1 purchases) that are less than its peak load plus a minimum reserve level of 10%. In determining the participation in new base load resources, each Operating Company’s resource position with regard to having a sufficient base load generation resources to serve its base load requirements. Participation in new base load resources would consider the “Baseload Capacity Deficit” defined as the shortfall in base load generation required to serve the firm load level that is expected for greater than 85% of annual hours. In determining the participation in new load-following resources, each Operating Company’s resource position with regard to having sufficient load-following resources to serve its load requirements. Participation in new load-following resources would consider the amount of each Operating Company’s CCGT equivalent load-following resources or other load-following resources that are expected to be regularly utilized in the system’s coordinated dispatch to serve the System’s load following requirements. After each Operating Company has attained its proportionate share of the System’s total resources and its appropriate share of each type of generation resource required for the various supply roles, participation in any additional resources acquired for System purposes will be allocated on responsibility ratio. Operating company participation decisions consider the following factors.

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Part 2 – Strategic Overview Long- Term Resource Strategy Strategic Initiatives Long-term Controlled Resource Strategy Purchased Power Strategy  Dependence on purchased power required to meet reliability requirements should not exceed amounts that could practically be built and financed within a three to five year periods.  Purchases for economic reasons are not limited.  Implement a “portfolio approach” limited-term purchase power procurement program. –“Laddering” of contract expiration dates. –Mix of supply roles.  CCGT resources are anticipated for all OPCOs and each planning region to address load following needs.  Several OPCOs will require additional CCGT or solid fuel LOU resources to address long-term base load supply needs.  Near term LOU resources are expected to be provided primarily from resources that are already operational or nearly complete  Develop self-supply “options” that could be implemented within normal construction periods, if necessary, to limit exposure to power purchases or address potential long-term reliability issues within particular locations such as Amite South or WOTAB. The SSRP calls for transforming the Entergy System’s generation portfolio over the upcoming ten-year planning period through two broad initiatives:

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Purchase Power Strategy Overview  Dependence on purchased power required to meet reliability requirements should not exceed amounts that could practically be built and financed within a three to five year period. ─ Excludes long-term controlled (LOU) capacity. ─ Purchases for economic reasons are not limited.  Implement a “portfolio approach” limited-term purchase power procurement program. ─ Mix of short-term products with varying contract durations resulting in a “laddering” of contract expiration dates (multi-year contracts expire at various times over three year period.) ─ Mix of products that support needs for base load and load following supply roles. Part 2 – Strategic Overview Strategic Objectives The System’s purchase power strategy seeks to accomplish the following strategic objectives:  Maintain a diversified portfolio of purchased power contracts.  Provide a “self controlled” alternative supply strategy for the provision of the life-of-unit resources that can be readily compared to other opportunities to acquire long-term resources.  Maintain an on-going RFP process to identify potential supply alternatives for each generation supply role.  Limit exposure to short and mid-term purchased power price uncertainty. Strategy

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Anticipated Reliance on Purchase Power A significant portion of the resources in the plan will be provided by short-term purchases. Depending on the particular year in the SSRP, the System expects to acquire approximately 800 to 1600 megawatts (MW) of resources from short-term power purchases consisting of a variety of products. Each year the System expects to purchase several hundred MW of dispatchable load-following generation unit capacity from combined cycle gas turbine (“CCGT”) or combustion turbine (“CT”) generators, pursuant to multi- year unit capacity purchase agreements (“MUCPAs” or “MUCCOs”) with terms of one to three years. In addition to multi-year unit capacity purchases, the System expects to make seasonal and annual power purchases utilizing products such as call options, firm block-energy or liquidated damages products, or other purchased power resources through the use of multiple procurement processes including formal Requests for Proposals (“RFPs”). Part 2 – Strategic Overview Purchase Power Products Include Long-term (life-of-unit) resources including PPAs and acquisitions Limited-term products (one to three years) Seasonal products Monthly RFP purchases Weekly RFP purchases Daily purchases

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Energy Mix reflects reliance on purchase power. Reliance on purchased power is reflected in the changing energy mix over recent years. Part 2 – Strategic Overview

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Changing Energy Sources Part 2 – Strategic Overview

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Self-supply Options In order to mitigate the exposure of the Operating Companies to purchase power supply risks and cost volatility, the System plans to identify and evaluate real executable resource proposals that would allow for the possibility to construct, if needed and economically justified, new capacity through self-build options –Such self-supply options would be executable within a three to five year window. –These self-build options include participation in new CCGT/cogeneration capacity, unit repowering and/or upgrades at existing generation sites. Self-supply options will be compared against market alternatives that provide comparable functionality. Part 2 – Strategic Overview

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Portfolio Mix for Long-term Resource Additions The life-of-unit (LOU) resources, whether PPA or acquisition, that will be added over the ten-year planning horizon are expected to consist primarily of CCGT and solid fuel resources. –CCGT resources are anticipated for all OPCOs and each planning region to address load-following needs. –Several OPCOs will require additional CCGT or solid fuel LOU resources to address long-term base load supply needs. –Near term LOU resources are expected to be provided primarily from resources that are already operational or nearly complete –The System will develop self-supply projects to provide “options” that could be implemented within normal construction periods, if necessary, to limit exposure to power purchases or address potential long-term reliability issues within particular locations such as Amite South or WOTAB. Part 2 – Strategic Overview

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Overview of Major Resource Additions Part 2 – Strategic Overview Purchased Power Continue reliance on a diversified purchase power portfolio consisting of 2000 – 5000 MW of short and longer term purchase power products. Load Following Acquire or build a minimum of 2- 4 additional CCGT/CT plants to provide “core” load following capability – System has daily load swings of MW; a minimum of MW CCGTs needed for operational flexibility and to limit exposure to purchase power prices – Need to replace current 35+ year old conventional gas units currently providing this role – Need to provide each OPCO with at least 1 long-term CCGT in long-term portfolio – New capacity to be located primarily in Southern portion of the System (Amite South, WOTAB) – Likely to include some self-supply projects in transmission critical regions (Western WOTAB, Amite South) to reduce production costs associated with minimum run levels for units whose commitment is required for RMR and load following Build or acquire a minimum of 2000 MW of new base load generation – presumably solid fuel given current gas price expectations – Needed in both Amite South and WOTAB regions – Multiple projects over 2010 – 2015 period – Need a portfolio of projects diversifying generation technology and fuel type – Diversify carbon based technology to consider eastern coal and coke as alternatives to western coal and rail transport exposure – Clean conventional pulverized coal expected to be part of the mix at new large (800 – 1600) MW sites but will take 5 – 7 years to develop – Coal and IGCC are longer-term options (2013 – 2015+) – 300 – 500 MW CFB projects provide earlier COD and opportunity to diversify fuel sources and get resources in multiple regions maximizing use of early capital Base Load Self-supply Create self-supply options that can be executed if needed

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Strategy for Stable Fuel Resources The SSRP seeks to provide each Entergy Operating Company with long-term controllable stable fuel price capacity resources that should move each Entergy Operating Company toward the objective of having resources that could provide its base load firm energy requirements from resources with highly predictable fuel prices. Stable fuel price capacity resources are expected to include solid fuel (i.e. coal or nuclear) capacity, renewable generation resources, or highly efficient gas-fired generation with fixed price gas price contracts with a term of at least ten years. Part 2 – Strategic Overview

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Entergy System 2006 Resource Requirements and Capability Part 3 – Current Portfolio Intermediate Peaking Base Reserves Purchases High CF LF The following chart compares 2006 functional requirements for the Entergy System with long-term controlled resources. Load Shape Requirements (MWs) Capacity (MWs) Requirements Existing Portfolio

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Entergy Arkansas, Inc Resource Requirements and Capability Part 3 – Current Portfolio Intermediate Peaking Base Reserves Purchases High CF LF The following chart compares 2006 functional requirements for EAI with long-term controlled resources. Load Shape Requirements (MWs) Capacity (MWs) Requirements Existing Portfolio

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Entergy Gulf States, Inc Resource Requirements and Capability Part 3 – Current Portfolio Intermediate Peaking Base Reserves Purchases High CF LF The following chart compares 2006 functional requirements for EGSI with long-term controlled resources. Load Shape Requirements (MWs) Capacity (MWs) Requirements Existing Portfolio

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Entergy Louisiana, LLC 2006 Resource Requirements and Capability Part 3 – Current Portfolio Intermediate Peaking Base Reserves Purchases High CF LF The following chart compares 2006 functional requirements for ELL with long-term controlled resources. Load Shape Requirements (MWs) Capacity (MWs) Requirements Existing Portfolio

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Entergy Mississippi, Inc Resource Requirements and Capability Part 3 – Current Portfolio Intermediate Peaking Base Reserves Purchases High CF LF The following chart compares 2006 functional requirements for EMI with long-term controlled resources. Load Shape Requirements (MWs) Capacity (MWs) Requirements Existing Portfolio

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Entergy New Orleans, Inc Resource Requirements and Capability Part 3 – Current Portfolio Intermediate Peaking Base Reserves Purchases High CF LF The following chart compares 2006 functional requirements for ENO with long-term controlled resources. Load Shape Requirements (MWs) Capacity (MWs) Requirements Existing Portfolio

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Gas Correlation Part 3 – Current Portfolio *Capacity based in 2005 Summer Ratings

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Age of Fleet Part 3 – Current Portfolio Age & Efficiency of ETR Gas / Oil Generation

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Annual Peak Load Forecast Part 4 – Load Forecast The peak load forecast establishes system reliability requirements. Post Katrina

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Retirement Strategy The operating companies have evaluated and continue to evaluate potential unit retirements on an on- going basis. The decision whether to retire an existing unit is an economic one that requires comparison of the forward cost of the existing unit with the forward cost of alternatives. Many of the System’s older gas and oil-fired units run at low capacity factors. At the same time these units require relatively low forward spending to keep available. Consequently, these units serve the peaking / reserve role in an economic manner. They provide economic sources of capacity. Part 5 – Retirement Strategy

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Overview of Plan  Plan identifies preliminary expectations regarding timing and location (planning region) for new long- term resources, and expected participation in each resource (to be finalized by the Operating Committee at the time commitment to resource is made).  Amounts and timing reflect the Entergy System needs.  Preliminary resource participation based upon consideration of Operating Company supply requirements to meet load shape and expected business risks and conditions. Part 6 – Overview of Plan

All forecast information reflects planning assumptions as of December The statements contained in this Appendix are made subject to the Reservation of Rights set forth in the RFP and subject to the terms and acknowledgements set forth in the Proposal Submission Agreement LONG-TERM RFP - April 17, Summary of Plan Resources Part 6 – Overview of Plan