November 5, 2010 ITSO Trans Talk Vern Swing, P.E. & Steve Manhart, P.E., PTOE, PTP November 5, 2010 -- University of Minnesota DIVERGING DIAMOND INTERCHANGE.

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

Interchange Ideas for Freeways & Arterials ODOT Roadway Conference April 13, 2010.
Fern Valley Interchange Public Hearing November 3, 2010.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
WA 2.ID 3.MT 4.OR 5.CA 6.NV 7.UT 8.WY 9.CO 10.AZ 11.NM 12.AK 13.HI 13 The West`
June 18, 2013 WINDSOR PARKWAY – ROSWELL ROAD INTERSECTION RELOCATION FEASIBILITY ANALYSIS.
Henry Clay’s plan to make economy self- sufficientHenry Clay’s plan to make economy self- sufficient Protective tariffProtective tariff –Protect American.
I-94 West Corridor Reference Map To Brainerd Lakes Region St. Cloud Urbanized Area 111, Census Twin Cities Urbanized Area 2.7 Million 2010 Census.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
SR A1A / SR 200 Reconstruction Project
Unconventional Arterial Intersection Design University of Maryland Advanced Transportation Day Aug. 28th 2014 Traffic Safety and Operations Lab University.
Module 5 Displaced Left Turn (DLT) Intersections
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
13 th Street and Dayton Avenue – Ames, IA Intersection Study ByungOck Kim Greg Karssen.
Characteristics of an Expressway Brandon Dye Wednesday October 24, 2007.
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Safety Elements of Modern Roundabout ProWalk/ProBike September 8, 2004 Michael M. Moule, PE, PTOE.
Interchange Design Wes Mayberry Transportation Engineering Intern
Driving Directions You may take 470 northbound, just after exiting the airport (see map), and follow it northwesterly 18.5 miles to I-25. User without.
Grade separation.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Ramp Count Estimation Procedures Daniel Jenkins, PE Office of Highway Policy Information October 24, 2012.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
 Capital: Washington, D.C.  Pop: 304 Million  US and Canada: 80% of North America.
1 INTERCHANGE SELECTION CE 550 SPRING OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Park & Kevin LANE USE FACTOR ESTIMATION FOR INTERSECTIONS WITH LANE DROP.
 Links the optimized settings to VISSIM, the operational analysis results is: Synchronization of Intersections This study employs the core logic of MAXBAND.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Robert Herling, Planner Duluth-Superior Metropolitan Interstate Council A Quantitative Assessment Method For System Safety.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
The MnDOT Metro District Microsimulation Experience Kevin Sommers, PE Minnesota Department of Transportation
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Urban FIA Goal -- Annually monitor the Nation’s urban forests with special emphasis in the largest (Iconic) cities of America!
Chapter 6: Intersections
Module 1 Introduction Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
Open Water Certification Count
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
MD 30 (Hanover Pike) at Mt. Gilead Road
The I-465 West Leg Reconstruction Project
Electronic Death Registration Systems, by Jurisdiction
Traffic Signs The general principle of traffic signs is to make a message known quickly, (70mph) accurately, with minimum reading skills required. This.
Interchanges Ch. 6.
ROUNDABOUTS Improving Safety and Efficiency
AASHTO OC LRFD Survey LRFD Scoreboard LRFD Scoreboard
LRFD Scoreboard LRFD Scoreboard LRFD Scoreboard
Double Crossover Diamond Interchange
Train-the-Trainer Sessions 386 sessions with 11,336 participants
Share of Women Ages 18 – 64 Who Are Uninsured, by State,
Executive Activity on the Medicaid Expansion Decision, May 9, 2013
IAH CONVERSION: ELIGIBLE BENEFICIARIES BY STATE
Train-the-Trainer Sessions 386 sessions with 11,336 participants
Nationalism & Good Feelings.
United States of America.
S Co-Sponsors by State – May 23, 2014
Sarah Tracy, P.E., PTOE Assistant Traffic Engineer
Seventeen States Had Higher Uninsured Rates Than the National Average in 2013; Of Those, 11 Have Yet to Expand Eligibility for Medicaid AK NH WA VT ME.
Estimated Total U.S. ESRD Costs, 1997
Name _____________________ Write the capital, state below. Augusta, Maine Montpelier, Vermont Concord, New Hampshire Abbreviations Below VT ME NH.
Executive Activity on the Medicaid Expansion Decision, May 9, 2013
United States & Puerto Rico
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Presentation transcript:

November 5, 2010 ITSO Trans Talk Vern Swing, P.E. & Steve Manhart, P.E., PTOE, PTP November 5, University of Minnesota DIVERGING DIAMOND INTERCHANGE (DDI) DESIGN (DDI) DESIGN

Presentation Outline Interchange Types Case Study - Elk Run Interchange Diverging Diamond Interchange Design Characteristics Advantages Use in North America Questions

Interchange Types Basic Diamond

Interchange Types Diamond System Interchange

Interchange Types Full Cloverleaf

Interchange Types Partial Cloverleaf (Parclo)

Interchange Types Partial Cloverleaf (Parclo)

Interchange Types Trumpet

Interchange Types Directional T

Interchange Types Single-Point Urban Interchange (SPUI)

Interchange Types Roundabout

Interchange Types Large Radius Roundabout

Interchange Types Diverging Diamond Interchange

Diverging Diamond Interchange (DDI) Springfield, MO

Diverging Diamond Interchange (DDI)

Interchange Conflict Points

Intersection Conflict Points

Diverging Diamond Interchange (DDI) AdvantagesAdvantages Improved Safety Operationally More Efficient Expandability Can be more cost-effective (especially when retrofitting an existing diamond interchange to DDI)

Case Study: TH 52 Elk Run Interchange Project Interchange Design Project Estimated Cost: $36 Million Total Project Cost

Elk Run Interchange Project Project Development Area

Elk Run Interchange Project Mn/DOT S.P (TH 52)

Elk Run Interchange Project Mn/DOT S.P (TH 52)

Elk Run Interchange Project Mn/DOT S.P (TH 52)

Elk Run Interchange Project Mn/DOT S.P (TH 52) Interchange Options Considered Large Radius Roundabouts Smaller Radius Roundabouts Single-Point Interchange Diverging Diamond Interchange - DDI (NOTE: FHWA refers to DDI as Double Crossover Diamond – DCD)

DDI Proposed Layout at Elk Run

Diverging Diamond Interchange (DDI) Q) Are there headlight concerns, since traffic is directly in front of each other before the crossovers? A) No. The direct headlight approach is a further distance than a common scenario where a left turn lane is directly opposite the opposing left turn. The headlights do not affect the crossover movements since vehicles are angled away from each other at the crossovers. Putting up any type of headlight shields (also known as glare screens) on the curb is ill-advised since there will be a in safety due to poor sight distance.

SYNCHRO/SimTraffic Analysis of DDI

Proposed Elk Run DDI Findings Mn/DOT proposed diamond interchange layout reaches maximum capacity at 40% build-out. Proposed DDI layout reaches maximum capacity at 79% of build-out. ► DDI Concept was ultimately selected by Mn/DOT.

DDI from the Air – Springfield, MO

Driving a DDI – Springfield, MO

Use in North America I-44 & MO-13, Springfield, MO I-15 & Main St, American Fork, UT I-15 & 500 East, American Fork, UT I-70 & Woods Chapel Rd, Kansas City, MO I-435 & Front St, Kansas City, MO Botts Rd & M-150, Kansas City, MO I-270 & Dorsett Rd, St. Louis Co, MO Along Baltimore-Washington Pkwy, Anne Arundel Co, MD Hwy 427 & Rathburn Rd, Toronto, ON I-5 & Fern Valley Rd, Phoenix, OR New Circle Rd Interchanges, Lexington, KY I-590 & Winton Rd, Rochester, NY I-75 & US 224/SR-15, Findlay, OH I-480 & Tiedman Rd, Brooklyn, OH Ashford-Dunwoody Rd Interchange, Atlanta, GA 8 Interchanges in/around Atlanta, GA West Catawba/Exit #28, Charlotte, NC I-95 & Thurbers Ave, Providence, RI IL-59 & I-88, Naperville, IL US-129 Bypass / Bessemer St/ Middle- settlements Rd Interchange in Alcoa, TN

Questions? Vern Swing, P.E. Principal Transportation Engineer/ President RLK Incorporated Steve Manhart, P.E., PTOE, PTP Sr. Transportation Engineer II RLK Incorporated 6110 Blue Circle Drive, Suite 100 Minnetonka, MN