DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Organization of Primary Entities
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
Design/Build Solutions to your construction projects, large and small.
Global Congress Global Leadership Vision for Project Management.
Gerald D. Hines College of Architecture Professional Practice.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
2 This statement shows how important the education process is which prepares the next generation of engineers to fulfill the industry needs. But this.
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Alternate Delivery Methods and Sharing Contract Risk APTA - Business Member Board of Governors APTA - Business Member Board of Governors Mike Robertson.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
9 Closing the Project Teaching Strategies
Software Project Management Introduction to Project Management.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Chief Legal Counsel, OSFC
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
King Fahd University of Petroleum & Minerals
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Agency Construction Management :CM NOT AT-RISK
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Core Conditions of Helping
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Design-Build Process from All Sides
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Construction Management At Risk Process
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Introduction to Energy Efficient Design
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Direct Assistance to Teachers
Introduction Project Management.
Project Management Ashima Wadhwa.
Key Concepts Energy Efficiency Resources for Undergraduate Engineering
The Life Cycle of a Project – START to FINISH
Chapter 1 – Section 1 Defining Marketing
Alternate Delivery Methods and Sharing Contract Risk
بازاریابی و بازرگانی زمستان 93.
The Evolution of Building Methods Traditional Methods
PROJECT DELIVERY METHODS
Introduction Project Management.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
Functional areas of an organization
CEng progression through the IOM3
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the design and construction sector. Where the DB is a general contractor, the designers are typically retained directly by the contractor.

DESIGN-BUILD The Culture of Builders Builders are often trained as engineers or construction managers. Oriented towards action and tangible results. Factual and see things in the light of experience and probability of outcome. Cost and Schedule Driven. Highly Organized, orchestrates complex combinations of resources.

DESIGN-BUILD The Culture of Builders Specialty Contractors o Design Build o Design Assist o Fixed Price Budget Control o Macro>Parse>Continuous Phased Design and Construction o Design Decisions o Early Materials Orders Soft Skills and the Design World o Design Knowledge o Design Documentation & Control o Design Risks

DESIGN-BUILD Interaction with Owners & Designers Owners want projects to meet the intended goals within established budgets & schedules. Designers want projects to be aesthetically appropriate, functionally efficient, and meet the owners’ needs. Builders want projects to be safe and run smoothly. All three want a reasonable return on investment.

DESIGN-BUILD Interaction with Owners & Designers Relationship between the owner and the DB requires a great deal of flexibility. o Requires significant investment of owner resources. o Joint interpretation of design needs and construction approaches. o Maintain quality and cost considerations jointly. Builders have a design function just as critical to a project’s success as the work of the architects and engineers. o Real life construction o Scheduling o Procurement Experience