ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

Good governance for water, sanitation and hygiene services
BARRIERS AND OPPORTUNITIES TO TECHNOLOGY TRANSFER “A CASE OF BARRIERS TO SOLAR PV TECHNOLOGY TRANSFER IN MWANZA, TANZANIA” Workshop on enabling environments.
Protection of the Poor through the implementation of the Social Electricity Tariffs: The South African Experience Author & Presenter: S D Salvoldi, B Comm,
1 Public Economics South African research topics Andrew Donaldson National Treasury August 2009.
Higher Education Funding Frameworks Pundy Pillay
March 2009 Emissions Trading in South Africa National Climate Change Summit Emily Tyler.
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
Why Renewable is Not Always Sustainable? Challenges relating to donor-driven RE projects Hanna Kaisti Finland Futures Research Center Conference on Development,
AFRICA’S TRADE IN SERVICES AND ECONOMIC PARTNERSHIP AGREEMENTS Paul Brenton Africa Region, World Bank Brussels, October 7, 2010.
Powering Africa – SAPP Strategies
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Rural Electrification Institutional Experience: Case of TUNISIA Ahmed Ounalli(*) Director, Strategic Studies Group-STEG Energy Week at the World Bank 6-9.
Poverty and Environmental Impacts of Electricity Price Reforms in Montenegro prepared by Dragana Radevic CEED, Montenegro Fourth Poverty Reduction Strategies.
1 An Investment Framework For Clean Energy and Development November 15, 2006 Katherine Sierra Vice President Sustainable Development The World Bank.
Putting Coherence in Financing Scheme of Regional and Sub-Regional Organizations and Countries By Ackim Jere SADC Secretariat Gaborone, Botswana Fifth.
Heads of Planning in Scotland Annual Conference, 11/12 June 2015 Keith Anderson CEO Port of Leith Housing Association, and Chair of Chartered Institute.
Constant Flow Community Water Supply in South Africa.
 400 new jobs  300% >90% ROI Greener  40MW SSE Ireland Better Energy Supply 600,000 gas and electricity customers Sustainability Making energy better.
Global Electrification: Trends and Challenges David G. Victor Program on Energy & Sustainable Development Stanford University presented at: Chinese Academy.
Comments on Progress with regard to Solar Water Heater Rollout Select Committee on Economic Development 28 February 2012.
Energy Enabling Women: Past, Present, Future by Jacky Scholz Namibian Electricity Control Board African Utility Week Cape Town 8 – 10 May 2006.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 16 Energy Efficiency Module 16: REGULATION AND POLICY OPTIONS TO ENCOURAGE ENERGY EFFICIENCY.
 SADC TREATY  RISDP  ENERGY PROTOCOL  COOPERATION POLICY AND STRATEGY  ACTIVITY PLAN-
MUS pilot project in Honduras Testing guidelines for planning and implementation of multiple use services.
CITY OF CAPE TOWN’S SUBMISSION ON ESKOM’S MULTI-YEAR PRICE DETERMINATION – 2010/11 – 2012/13 (MYPD 2) City of Cape Town represented by : Alderman Ian Neilson.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Towards Sustainable Universal Access Siven Naidoo Meeting of the Technical Group and the Sherpas of the Secretary-General’s High-level Group On Sustainable.
How to Achieve Universal Modern Energy Access by 2030? Hisham Zerriffi (UBC) Shonali Pachauri (IIASA)
Embedded Generation Workshop SALGA Head Office 18 April 2013 THE POTENTIAL IMPACT OF EFFICIENCY MEASURES AND DISTRIBUTED GENERATION ON MUNICIPAL ELECTRICITY.
Poverty Targeting in Asia Country surveys on India, Indonesia, the Philippines, PRC and Thailand.
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
8 TH -11 TH NOVEMBER, 2010 UN Complex, Nairobi, Kenya MEETING OUTCOMES David Smith, Manager PEI Africa.
National Smallholder Farmers’ Association of Malawi Key Challenges Affecting Agriculture in the Region - Perspective from Farmer Group Dyborn Chibonga,
The strategy for improved electricity distribution maintenance 9 June 2008.
UNDP Training Programme: Decentralisation and Local Governance (RBEC) Fiscal Decentralisation Nick Devas IDD, School of Public Policy June 2007.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
RSA 20–year Electricity Generation Policy.
Workgroup: Delivering and Accounting for Development Results
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
DEPARTMENT OF MINERALS AND ENERGY Parliamentary Portfolio Committee Briefing in respect of ELECTRICITY BASIC SERVICES SUPPORT TARIFF (EBSST) 06 SEPTEMBER.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Global Power Company of the Year 2001 Proudly South African Minerals and Energy Portfolio Committee 19 March 2003.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
1. Overarching Question “to what extent have IFAD financed interventions in market access met the institutional objectives of IFAD?” Overview and Methodology.
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
ARMENIA: OBA SCHEME FOR PROVISION OF GAS AND HEATING Washington D.C. March 8, 2006 Energy Week.
From Barrier Analysis to TAPs and Project Ideas Overview of the approach Event Gordon A. Mackenzie Head of Programme, Cleaner Energy Development UNEP.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
12. Identifying measures to remove barriers 20 min Chapter 6 Ivan Nygaard.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Werner Weiss AEE - Institute for Sustainable Technologies (AEE INTEC) A-8200 Gleisdorf, Feldgasse 19 AUSTRIA SOLTRAIN Targets and Results.
1 Ensure the consistency between sectoral plan, strategy and budget PRSP Forum, April 2006.
Presentation to the Portfolio Committee on Energy
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Sewerage and Sanitation Policies in Indonesia
FREE BASIC ELECTRICITY/FREE BASIC ALTERNATIVE ENERGY
Eskom’s Electrification Programme
“Social Protection Finance for a changing World of Work - Key Considerations For A Responsive Financing Framework For Social Protection In Africa ” Mutale.
FFC Briefing to the Portfolio Committee on Energy
FFC Briefing to Portfolio Committee on Energy
The Electricity Distribution Industry
Presentation transcript:

ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town

Why Electrification? Capacity to benefit (Income, skills, knowledge) Purpose of Electrification Poverty alleviation QOL Economic development

Logical Framework Project planning and implementation Operation and use process Enablement of change - particularly of poor people Input Output Outcome Impact

% Households Electrified CountryUrbanRural Botswana262 Lesotho144 Malawi11<1 Mozambique17<1 Namibia265 South Africa8046 Swaziland422 Tanzania131 Zambia181 Zimbabwe65<1

Annual Household Connections ‘000s

Evaluation of NEP Municipal and Eskom projects. Construction met needs. Most significant constraint is voltage drop. Design standards vary widely and changed during the programme. Some designs may be unduly conservative, and in other projects the performance may be inadequate.

Lessons Prepayment meters: high failure rates of new technology. Capital cost reductions in real terms. Some communities objected to 20 A limited supply (at 230 V), but experience indicates this standard is appropriate for low consumption.

Proposed New Tariff Access alone does not alleviate poverty. Tariff subsidy needed to help the very poor. Research into a Basic Electricity Support Tariff.

Research Approach Poverty, technical, health, environment, social, financial, economic, institutional Literature study and model analysis Discussions with utilities, suppliers Data from Load Research Project Community studies Focus group meetings Pilot sites – Eskom and municipalities

Brief overview of report Ch 1 - Context: Government commitment to support basic services. Linkage from inputs to impacts. Ch 2: Defining poverty. Contribution by electricity to poverty alleviation. Parallels with Free Basic Water. Free? Ch 3: Basic electricity tariffs. Criteria for subsidy schemes. International practice. Size of subsidy. Broad-based, targeted or self-targeted.

Brief overview of report (contd.) Ch 4 - Technical: Prepayment meters can support two-block tariff. Electrification. Consumption and demand models. Demand growth. Ch 5 - Health and Environment: Notable safety and health impact needs electricity to be used for cooking/heating. Marginal GHG impact.

Brief overview of report (contd.) Ch 6 - Social: Potential impact significant. Inequity cf non-electrified. Communication and training. Debt issue. Ch 7 - Finance and Economics: Cost. Sources of funds: fiscus, plus earmarked tax if broad-based. Flexibility requires “not free”. Ch 8 - Institutional: EDI structure not a constraint. Local or national choice. Timetable.

Key research findings Difficult to define poverty consistently and identify individual poor households. Basic requirement: kWh/month, unconstrained demand <8A. Significant health and safety benefits, and social impact. Constrained by lack of appliances and understanding. High awareness of inequity: free energy for ‘haves’, not available for ‘have-nots’.

Key research findings (contd.) Choice: Broad-based - high coverage or Targeted - less leakage of benefits. Subsidised but not free: avoid entitlement, social value in purchasing, regulate demand at month start, flexible for fiscal management. But not a poverty trap. Technically feasible to implement. Affected by plans for EDI restructuring.

Key research findings (contd.) Access to electricity requires electrification and appliance programmes. Energy tariff is already a subsidy/not cost-reflective. Small economic impact, needs balance with other priorities. National or local choice affects tariff structure, institutional responsibilities, EDI restructuring, costs to implement.

Main issues Purpose - alleviation and links to credit management. National or local choice. Equity with non-electrified households. Tariff structure - broad-based or targeted, first block free or cheap. Appliances, cooking and solar. Information and communications. Monitoring and evaluation.

Five alternatives Support tariff only to households identified administratively as poor. Broad based to all connected households. Self-targeted 8 or 10 A max current limit. Self-targeted 20 A max current limit. 1A: an alternative to Solar Homes.

Recommendations Poverty alleviation must meet needs for lighting, media access and cooking. Self-targeted 8 or 10 A max current limit. An alternative to Solar PV. Measure impact on customer behaviour, environment, health and quality of life. Poverty alleviation needs multi-institution approach beyond BEST. Electrification must continue. National price.

Recommendations Not free, but heavily subsidised. 50 kWh for R5 (incl VAT) in Equivalent to ~35 kWh free. Self-targeted with current limit: lower coverage but less leakage; cost R350m from fiscus; new default for electrification programme; debt management possible.

Some implications Full picture needs to consider solar PV and 1A options for electrification. Servicing standards? What impact on valuation of assets/liabilities into the future? A B C Total cost/m Consumption [kWh/month]

Conclusions …. Electrification was carried out efficiently. Electrification does not cure poverty, it contributes to integrated development. An objective of BEST is to unlock value of the investment in electrification infrastructure.