P13458 RIT Senior Design Team March 22, 2013 9AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout.

Slides:



Advertisements
Similar presentations
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Advertisements

 1  Outline  putaway  pallet storage and retrieval  case retrieval  project.
Multidisciplinary Senior Design Rochester Institute of Technology Dresser-Rand Painted Post P10459 MSD II Update Presentation 4/9/10 Team: Phil Eaton (ME)
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
Protective Packaging and Materials Handling
CHAPTER 5 Protective Packaging and Materials Handling.
Intel Water Reclaim Project Final Report 5/25/05.
STRIP LAYOUT for BLANKING TOOL.
Standardization of the process flow at the wash and weigh station will allow for three advantages to the previous process. One would allow you to know.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Computer Integrated Manufacturing CIM
Senior Design Review Andrew Beasten Greg Feather Alex Phillips Brendan Moran Wegmans Bread Tray Lift Assist.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 13 MATERIAL HANDLING SYSTEMS E. Gutierrez-Miravete Spring 2001.
Skilled Trades 1201 Floor Framing
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Pipe Supports and Restraints
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
Just-In-Time “Eliminate Waste”.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
Racking In The Foodservice Warehouse W. Frank Dell CMC President DELLMART & Company 125 Hardesty Road Stamford, CT
P13458 RIT Senior Design Team May 3, AM-11AM Dresser- Rand, Painted Post Separables Project Close-out.
Offices May 2nd, 2011.
Unit load principle The unit load is a single item, a number of items or bulk material which is arranged and restrained so that the load can be stored,
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Rotor Cell Productivity Improvement Dresser-Rand Olean, NY January 18, 2013.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Mechanics of Materials. To determine the loading on a body Draw a free body diagram indicating – external loads and moments – reaction loads and moments.
UNIT – III DESIGN OF PRODUCT, SERVICE AND WORK SYSTEMS.
Senior Design Review Andrew Beasten Greg Feather Alex Phillips Brendan Moran Wegman’s Bread Tray Lift Assist.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Progress Report: Phase One December Hannah is an exceptionally bright 12 year-old girl born with a severe case of brittle bone disease (Osteogenesis.
Complete Storage System Provider Racking system Shelving system Ou Efos Resources No Kompleks Sri Sungai Nibong Jalan Sultan Azlan Shah
Facility Layout Objectives of Facility Layout Basic Types
Structural Components
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Material Transfer Apparatus
Storage and Warehousing Techniques
Process Layout Chapter #6.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
STRAW TRACKER SYSTEM CAD STATUS :
Escalator Installation
INTEGRATED TRANSPORT AND LOGISTICS An Intoduction
Computer Integrated Manufacturing CIM
Present status of the flux return yoke design
Stages & Risers Sales Training
Zach Bolotin Cody Hatch Robert Swartz
OVERVIEW Impact of Modelling and simulation in Mechatronics system
RIT Senior Design Team P13458 Systems Design Review 1/18/13
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
Room Interior Space One Point Perspective Paper Cutout Room Assignment
SENIOR DESIGN PROJECT P08455
ActivRACTM 30P Mobilized Storage System
Systems Design Review 1/21/13 Attendees:
SENIOR DESIGN PROJECT P08455
P10452 Dresser Rand Compressor Installation and Utilization
14 Bin location management
SENIOR DESIGN PROJECT P08455
SENIOR DESIGN PROJECT P08455
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

P13458 RIT Senior Design Team March 22, AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout Review

Agenda Desired Outcome of Review Systems Design using Air Bearings Fixed System Free System Air Skid Research DECISION for design direction Layout Review Review of Weighting Results DECISION for design direction

Desired Outcome Decisions for the air bearing system Pursue chosen design as the main mechanical design component for the remainder of MSD II Layout decision Finalize high-level design and dive into detailed design based on design aspects chosen to be pursued

Time Line STOP

Customer Needs Review Relaxed From beginning of project (December 2012):

Free Slave Frame System ProsCons Does not require permanent station fixtures Stays with compressor through entire assembly Set at working height of 18” Can be bolted to floor for testing Requires level movement pathway More complex frame design Requires bolting into floor or substrate Must be removed for shipping 2 Frame Models necessary (MOS/HOS and HOSS) Compressor frames must be pre-painted Ergonomic issues regarding beam width

Step 1: Compressor frame is loaded onto free slave frame system

Step 2: Air pallet is slid into the fixture using integrated free rolling casters

Step 3: Air pallet inflates and allows movement to next station

Step 4: Assembly moves to next station

Fixed Slave Frame System ProsCons Eliminates the need to level a pathway down the length of the line Reduces the slave frame(s) down to single horizontal beam(s) Posts will be embedded level and flat in the floor to eliminate need for leveling Fewer air lines under unit Beams can be anchored to test bed for test- do not need to remove from frame Requires fixed extrusions in the floor Can now only set the compressor down at designated stations

Step 1: Horizontal beams are placed on the loading station

Step 2: Compressor frame loaded is onto and fixed to horizontal beams

Step 3: Air pallet is slid into the fixture using integrated free rolling casters

Step 4: Inflation of the air pallet lifts the horizontal beams and compressor frame free of the fixture, allowing movement to the next station.

Air Platform Sizing

The Movable Air Platform will be a minimum of 34” wide Actual available dimensions are pending, possibly larger Length of Air Platform is dependent upon unit to be moved

Layout Design 4 layout designs The team created 2 straight line and 2 U-shaped process layout designs. Several detailed factors and rankings were given to help enhance design selections. Feedback Factors and ranking weights Operator feedback People flow Parts flow Inventory Capacity: 2 days vs. 7 days Floor modeling of layout Ability to narrow down areas of major concern and improvements Straight Line vs. U-shaped process design Compare/contrast between layout designs

Layout Factors Ranking

Summary Table of Results

Summary FactorsLayouts abcd Flexibility Inventory access Space Utilization Ease of movement/Operator Returnability Movement Time Maintenance Access Pass by/Pass through610 5 Future Expansion Total points

Summary FactorsLayouts abcd Flexibility Inventory access Space Utilization Ease of movement/Operator Returnability Movement Time Maintenance Access Pass by/Pass through610 5 Future Expansion Total points

Summary FactorsLayouts abcd Flexibility Inventory access Space Utilization Ease of movement/Operator Returnability Movement Time Maintenance Access Pass by/Pass through610 5 Future Expansion Total points

Summary FactorsLayouts abcd Flexibility Inventory access Space Utilization Ease of movement/Operator Returnability Movement Time Maintenance Access Pass by/Pass through610 5 Future Expansion Total points