Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.

Slides:



Advertisements
Similar presentations
Module 12 Upgrading from Exchange Server 2003 or Exchange Server 2007 to Exchange Server 2010.
Advertisements

June 23rd, 2009Inflectra Proprietary InformationPage: 1 SpiraTest/Plan/Team Deployment Considerations How to deploy for high-availability and strategies.
Lesson 11 – NETWORK DISASTER RECOVERY Disaster recovery plans Network backup and restoration OVERVIEW.
Module 5 Understanding SQL Server 2008 R2 Recovery Models.
Barracuda Networks Confidential1 Barracuda Backup Service Integrated Local & Offsite Data Backup.
Maintaining Windows Server 2008 File Services
Implementing High Availability
Module 8 Implementing Backup and Recovery. Module Overview Planning Backup and Recovery Backing Up Exchange Server 2010 Restoring Exchange Server 2010.
Exchange 2010 Project Presentation/Discussion August 12, 2015 Project Team: Mark Dougherty – Design John Ditto – Project Manager Joel Eussen – Project.
Module 12: Planning for and Recovering from Disasters.
1. Preventing Disasters Chapter 11 covers the processes to take to prevent a disaster. The most prudent actions include Implement redundant hardware Implement.
TNT Microsoft Exchange Server 2003 Disaster Recovery Michael J. Murphy TechNet Presenter
Exchange 2013 (backup &) Disaster Recovery
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 14: Problem Recovery.
1 Objectives Discuss the Windows Printer Model and how it is implemented in Windows Server 2008 Install the Print Services components of Windows Server.
Module 8: Designing Active Directory Disaster Recovery in Windows Server 2008.
Managing Client Access
Module 4 Managing Client Access. Module Overview Configuring the Client Access Server Role Configuring Client Access Services for Outlook Clients Configuring.
Microsoft ® Official Course Module 12 Monitoring, Managing, and Recovering AD DS.
Implementing Dynamic Host Configuration Protocol
Course 6425A Module 9: Implementing an Active Directory Domain Services Maintenance Plan Presentation: 55 minutes Lab: 75 minutes This module helps students.
Deploying and Managing Windows Server 2012
Module 13: Configuring Availability of Network Resources and Content.
Implementing Dynamic Host Configuration Protocol
Week 9 Objectives Securing Files and Folders Protecting Shared Files and Folders by Using Shadow Copies Configuring Network Printing.
Implementing File and Print Services
Securing Microsoft® Exchange Server 2010
Purpose Intended Audience and Presenter Contents Proposed Presentation Length Intended audience is all distributor partners and VARs Content may be customized.
Module 1: Recovering Messaging Databases. Overview Overview of Database Recovery Scenarios Recovering a Messaging Database Using Dial-Tone Recovery.
Chapter 18: Windows Server 2008 R2 and Active Directory Backup and Maintenance BAI617.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
Deploying and Maintaining Server Images
Configuring Encryption and Advanced Auditing
Module 12: Managing Disaster Recovery. Overview Preparing for Disaster Recovery Backing Up Data Scheduling Backup Jobs Restoring Data Configuring Shadow.
Module 2 Designing Microsoft® Exchange Server 2010 Integration with the Current Infrastructure.
Maintaining File Services. Shadow Copies of Shared Folders Automatically retains copies of files on a server from specific points in time Prevents administrators.
Module 7: Fundamentals of Administering Windows Server 2008.
Module 9 Configuring Messaging Policy and Compliance.
20411B 8: Installing, Configuring, and Troubleshooting the Network Policy Server Role Presentation: 60 minutes Lab: 60 minutes After completing this module,
Maintaining Active Directory Domain Services
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter 11 Backup and Recovery of Exchange Server 2003.
Module 4 Planning and Deploying Client Access Services in Microsoft® Exchange Server 2010 Presentation: 120 minutes Lab: 90 minutes After completing.
Module 9 Configuring Messaging Policy and Compliance.
Module 3: Preparing for and Recovering from Non- Mailbox Server Failures.
Module 13 Implementing Business Continuity. Module Overview Protecting and Recovering Content Working with Backup and Restore for Disaster Recovery Implementing.
11 DISASTER RECOVERY Chapter 13. Chapter 13: DISASTER RECOVERY2 OVERVIEW  Back up server data using the Backup utility and the Ntbackup command  Restore.
Overview Managing a DHCP Database Monitoring DHCP
1 Week #10Business Continuity Backing Up Data Configuring Shadow Copies Providing Server and Service Availability.
Module 14 Monitoring and Optimizing SharePoint Performance.
Module 3 Planning and Deploying Mailbox Services.
Module 5: Implementing Group Policy
Module 3 Configuring File Access and Printers on Windows 7 Clients.
Module 4: Configuring and Troubleshooting DHCP
Module 12 Upgrading from Exchange Server 2003 or Exchange Server 2007 to Exchange Server 2010.
Module 11 Upgrading to Microsoft ® Exchange Server 2010.
Module 7 Planning and Deploying Messaging Compliance.
Module 1: Implementing Active Directory ® Domain Services.
Module 4 Planning for Group Policy. Module Overview Planning Group Policy Application Planning Group Policy Processing Planning the Management of Group.
Module 9: Designing Security for Data. Overview Creating a Security Plan for Data Creating a Design for Security of Data.
Exchange Deployment Planning Services Exchange 2010 Complementary Products.
Module 2 Configuring Mailbox Servers. Module Overview Overview of Exchange Server 2010 Administrative Tools Configuring Mailbox Server Roles Configuring.
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
Module 9 Planning and Implementing Monitoring and Maintenance.
Unit 10 ITT TECHNICAL INSTITUTE NT1330 Client-Server Networking II Date: 2/24/2016 Instructor: Williams Obinkyereh.
Planning for Application Recovery
Planning and Implementing Disaster Recovery
Maintaining Windows Server 2008 File Services
Unit 10 NT1330 Client-Server Networking II Date: 8/16/2016
SpiraTest/Plan/Team Deployment Considerations
Designing IIS Security (IIS – Internet Information Service)
Presentation transcript:

Module 9 Planning a Disaster Recovery Solution

Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server Recovery

Lesson 1: Planning for Disaster Mitigation Identifying Data Loss Scenarios Data Loss Mitigation Features Designing a Disaster Mitigation Strategy What Is the Relationship Between Disaster Recovery and High Availability? Designing a High Availability Solution for Disaster Mitigation Backup-Less Exchange Server What Are the Timelines for Disaster Recovery? Scenarios Requiring Backup and Restore

Identifying Data Loss Scenarios Data loss scenarios Lost item Lost mailbox Lost database Lost server

Data Loss Mitigation Features Deleted item recovery Deleted mailbox retention DAGs Shadow redundancy Mitigating data loss avoids the need to recover from backup

Designing a Disaster Mitigation Strategy Considerations include: Increasing Deleted Item Retention increases database size Increasing Deleted Mailbox Retention increases database size DAGs prevent service outages due to lost databases and lost servers Replay lag time may prevent data corruption on a passive copy in a DAG

What Is the Relationship Between Disaster Recovery and High Availability High availability keeps the system up and running when a failure occurs Disaster recovery is required when high availability fails

Designing a High Availability Solution for Disaster Mitigation For Mailbox servers: Use DAGs for mailbox databases Replicate public folder database contents For non-Mailbox servers, include: Multiple Hub Transport servers A Client Access array Multiple Edge Transport servers

Backup-Less Exchange Server For the DAG configuration: Use three or more database copies Locate one database copy in a remote site Create a lagged database copy Enable circular logging Enable single-item recovery Backup-less Exchange Server reduces costs due to: Simplified management No backup software or hardware No RAID

What Are the Timelines for Disaster Recovery? Recovery Time Objective: How quickly is the disaster recovery performed? Recovery Point Objective: From what point in time is the disaster recovery performed?

Scenarios Requiring Backup and Restore Scenarios: Recover a message when single-item recovery not enabled Recover a mailbox after the mailbox retention period has passed Recover a public folder item after the item retention period has passed Recover from a failed database when a DAG is not in use Recover from a failed server when a DAG is not in use

Lesson 2: Planning Exchange Server Backup Identifying Backup Requirements for Mailbox Servers Identifying Backup Requirements for Non-Mailbox Servers Choosing an Exchange Server Backup Solution Designing an Exchange Server Backup Schedule Designing an Exchange Server Backup Management Solution What Is System Center Data Protection Manager?

Identifying Backup Requirements for Mailbox Servers You should back up: Mailbox databases Public folder databases Transaction logs Configuration data is stored in AD DS

Identifying Backup Requirements for Non-Mailbox Servers Generally, non-Mailbox server backups are required only to restore additional configuration options set after installation Server roleYou should back up Client Access Customized configuration and Web pages SSL certificate Hub TransportMessage transport logs Edge TransportAll server configurations Unified MessagingCustom audio files

Choosing an Exchange Server Backup Solution Only VSS backups are supported for Exchange Server 2010 Consider replication as part of the backup solution MediaDescription TapeIs physically easy to transport and very durable DiskIncreases backup performance SAN-based Allows you to take backup traffic off the main network and keep it on the SAN

VSS backup to disk is effectively incremental Designing an Exchange Server Backup Schedule To design a backup schedule, you need to know: How frequently must Exchange servers be backed up? How does this vary based on server role? What is the backup window? How does the backup schedule impact recovery?

Designing an Exchange Server Backup Management Solution Assign a team or administrator to take primary responsibility for managing backups Monitor backups on a daily basis, and address backup failures immediately Transport backup media offsite regularly Rotate tapes based on your organization’s data storage requirements Perform test restores occasionally

What Is System Center Data Protection Manager? A backup solution from Microsoft To back up Windows servers Can back up application servers Enterprise license is required for Exchange Server backup The backup process 1.DPM triggers snapshot 2.VSS writer communicates with Exchange 3.Exchange creates consistent databases 4.VSS snapshot is taken 5.Transaction logs are truncated 6.Snapshot copied to disk

Lesson 3: Planning Exchange Server Recovery Options to Recover Exchange Server Functionality Options to Recover Mailbox Data and Databases Planning the Recovery of Mailbox Servers Planning the Recovery of Non-Mailbox Servers Planning the Recovery of Edge Transport Servers Creating a Disaster Recovery Plan Maintaining a Disaster Recovery Plan

Options to Recover Exchange Server Functionality Restore the lost server Build a new server Restore system state (optional) Install Exchange Server with recovery mode Restore any necessary data Replace the lost roles Build a new server with equivalent functionality Add roles to an existing Exchange Server

Options to Recover Mailbox Data and Databases OptionDescription Database restoreReplaces an existing database Recovery database Restores database to an alternate location for data recovery Database portability Restores database without having to recover a specific server Dial-tone recovery Restores server functionality rapidly before historical mailbox contents are restored DAG recovery Mounts a database copy on a different Exchange Server computer When a physical server fails, you have several options for recovery

Planning the Recovery of Mailbox Servers Considerations: Use DAG to avoid the need to recover Separate transaction logs and databases Use a dial-tone database to speed up recovery Allocate disk space for a recovery database

Planning the Recovery of Non-Mailbox Servers The basic functions of non- Mailbox servers can be recovered without backing up existing servers Adding the server role to an existing Exchange server in the same site Deploying a new server with the same server role Replace a failed non-Mailbox server by: Deploying a new server can result in some applications requiring reconfiguration

Configuration information for Edge Transport servers is stored in AD LDS To recover: Use a cloned configuration Back up configuration by using the ExportEdgeConfig.ps1 script Import configuration on the new server by using the ImportEdgeConfig.ps1 script Reestablish EdgeSync Planning the Recovery of Edge Transport Servers

A Disaster Recovery Plan is a plan for restoring functionality when an event happens that causes IT systems to fail Disaster Recovery Plan components: SLA recovery requirements Risk assessment Budget High-level process document Testing plan Auditing plan Maintenance plan Training plan Creating a Disaster Recovery Plan

Maintaining a Disaster Recovery Plan Testing a disaster recovery plan Test component failure and system Test workstation impact Test performance Refining a disaster recovery plain Revise based on test results Review SLA requirements and business needs Review risks and mitigation methods Retest any components that are modified

Lab: Planning a Disaster Recovery Solution Exercise 1: Planning Disaster Recovery for Vancouver Exercise 2: Planning Disaster Recovery for San Diego Exercise 3: Implementing Single-Item Recovery Logon information Estimated time: 45 minutes

Notes Page Over-flow Slide. Do Not Print Slide. See Notes pane.

Lab Scenario You are a messaging engineer for A. Datum Corporation, an enterprise-level organization with multiple locations. A. Datum Corporation is an international corporation involved in technology research and investment, and it is planning to upgrade from Exchange Server 2003 to Exchange Server High availability planning is complete, but the disaster recovery plan needs to be further developed. Specifically, you need to consider the details of the messaging SLA to ensure that disaster recovery is possible within the appropriate time frame. Finally, you must implement part of your proposed disaster recovery plan.

Lab Review Which role group is used to provide a user with permission to perform a Multi-Mailbox Search? How does single-item recovery differ from the recovery of deleted items in previous versions of Exchange Server?

Module Review and Takeaways Review Questions Best Practices