MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.

Slides:



Advertisements
Similar presentations
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Advertisements

“Upgrading the collection and wastewater treatment system in Ploiesti City”
Donegal County Council – Presentation to Oireachtas Joint Committee on Environment Transport Culture and Gaeltacht County Donegal - Overview Population.
UWWT directive in Croatia – implementation and data availability
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
„Extension and modernization of water and wastewater infrastructure in Arad County”
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Water Services National Training Group 12th Annual Conference 11 th September, 2008.
ETCF is funded by the European Union Project is implemented by Eurochambres & TOBB CONCEPT NOTE ETCF Information Days April 3rd 2008 Ankara.
Water.europa.eu Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Implementation of the Water Framework Directive - Uncertainty issues - Michiel Blind, RWS-RIZA.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
04/12/04 Environmental Protection Agency/Lithuania OECD/Eurostat JQ Inland Waters Country presentation Lithuania Violeta Juozefaite.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
Monitoring of UWWTPs and Reporting in Germany, Nicosia, 17 February Control and Monitoring of the Urban Waste Water Treatment Plants and Data Reporting.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
EU Water Policy Sustainable water management for generations to come.
Growth Management Legislative Discussion March 20, 2012.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Ministry of Environment and Water Management, Romania Managing Authority for SOP Environment Sectoral Operational Programme Environment - SOP Environment.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
WASTE WATER STATISTICS IN TURKEY Tülay AKICI Environmental Statistics Division State Institute of Statistics, TURKEY April,
World Health Organization
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
Existing monitoring network is sufficient for quantity, but comprehensive development is needed for quality Existing monitoring network is sufficient for.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
REPUBLIC OF SLOVENIA MINISTRY OF AGRICULTURE AND THE ENVIRONMENT SLOVENIAN ENVIRONMENT AGENCY 1 Aleš Veršič, M.Sc, Slovenian Environmental Agency Nataša.
Sewerage Infrastructure Development in Sarawak
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
18/09/2006 Environmental Protection Agency Improvement of the Statistics on Industrial Water Use and Waste-Water Discharges Lithuania Project presentation.
National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.
Water quality and water pollution – data for old and new policy questions 5th World Water Forum Session Data integration and dissemination: From.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
MONTENEGRO Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change Bilateral.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Regional aggregation of statistics on water abstraction and use Seminar on water statistics for countries in Eastern Europe, Caucasus and Central Asia.
1 Financing in water sector - times of change Antti Tooming Ministry of the Environment / Water department, Head of Project bureau 19/05/2016.
1 AGRICULTURAL POLLUTION REDUCTION ACTIVITY Financed by USAID APRA ROMANIA PROJECT Project implemented by: Assistance project for MAFWE International Resources.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
Asset Degradation Modelling at Townsville Water
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
Prioritising Capital Investment Achieving a Balance
National Administration “Romanian Waters” NARW Bucharest - Romania
Meeting Standards and Expectations in the Water Industry
Lecture (7): Types of site sanitation ways
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
Presentation of the Hungarian Grant Project
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
CIS-Workshop on River Basin Management Plans
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
Ideas for improvements of the Joint Questionnaire on Inland Waters
Meeting on the implementation of the INSPIRE Directive
URBAN WASTE WATER – COLLECTING AND TREATMENT (PUBLIC SERVICE)
IMPLEMENTATION OF ARTICLE 9
Urban Water Water Treatment in RS
1st Implementation Report of the Water Framework Directive
DROUGHT MANAGEMENT PLANS IN SPAIN Drought indicators Rome, 7 Dicember 2006 Teodoro Estrela Deputy Water Director Spanish Ministry of Environment.
Preparation of the second RBMP in Romania
Reporting under UWWTD Information needs for UWWTD Questionnaire 2007
Presentation transcript:

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Short-commings of first MPs Missing or insufficient elements: MP Summary Summary for each chapter (Abstract) => key results No clear separate lists of agglomerations No clear calculation algorithm applied for main agglomerations following a standard pattern used for data costs base. No clear CF priority list as a result of options analysis and prioritisation 2

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Short-commings of first MPs No specific definition of problems No clear maps for representation of the agglomerations no clear phasing no transparent lists of investments no real options studied no clear, limited number of prioritisation and selection criteria 3

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA What should be improved? Overall Summary Summary for each Section (quantify) Summary of specific information (see next slide) Two separate lists and maps of agglomerations (water supply and wastewater) MP strategic options for each county 4

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Specific information and plans summary 5 Plans and investment needed milestonesCurrent situationGaps or problems identified Stage 1 (interim) by 2015* (Cohesion Fund) Stage 2 (by 2018)Other stages Specific information Drinking Water connection Brief description, quantification of major elements (aggregated data – no of systems, coverage per urban, rural, etc.) Brief description Water treatment Swage Collecting system Treatment level Treatment performance Receiving areas Sewage sludge management

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA What should be improved? Criteria for investments Investment phases (templates provided) Contribution to objectives (Accession Treaty)/model List of actions needed and prioritised investment (including investment costs => templates) Unit cost table 6

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Definition of Agglomerations Draft Methodology prepared by MESD 7

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Approach for Definition of Agglomerations Implementation Plan Master Plan Feasibility Study 8

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA A) Definition of agglomerations in Master Plan Identification of all agglomerations at county level (maps and data base) “Clustering” of Agglomerations based on techno-economic assessment Options Analysis (central/de-central) Discussion with stakeholders Preparation of Long-term investment plan 9

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA B) in Feasibility Study Detailed option analysis Preparation of final/detailed maps and data base on selected agglomerations 10

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Interpretation of “Definitions for UWWTD” Scenario c): Legal requirements (compliance dates article 3 and 4,5 UWWTD) defined by P.E. of each individual agglomeration Treatment standard defined by P.E. Of biggest agglomeration. No legal requirement for tertiary treatment if all agglomerations in the “cluster” are below P.E. However, other Environmental Directives to be considered (WFD, Bathing Water Directive) 11

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Interpretation of “Definitions for UWWTD” Scenario b): Splitting one settlement in two parts (i.e. River crossing the town) is not allowed Development of future population load to be considered 12

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Scenarios “Definitions of UWWTD” 13

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA “Clustering” of Agglomeration 14

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Boundary of Agglomeration 15

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Definition of Agglomerations EXAMPLES for AGGLOMERATIONS Prepared by Consultants 16

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA How to define an Agglomeration in practice Define boarders for all agglomerations in the county (settlements very close to each other might be merged to one agglomeration => consider also future development) Classification of agglomerations in categories Below 2,000 p.e – 1,0000 p.e. Above 10,000 p.e. 17

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Example Roman page 18 Example for Agglomerations – Detailed Definition of Boundaries

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA How to define an Agglomeration in practice Analyse case-by-case based on the criteria such as: Distance between agglomerations and topography (altitude) Population /industrial density (p.e./ha) Unit costs for investments (sewer, WWTP, etc.) Specific Investment Costs (in €/p.e.) and specific Operational Costs (in €/p.e.) => NPV Others (i.e. Recipient water available, land for WWTP extension, existing capacities, etc.) 19

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA How to define an Agglomeration in practice Prepare option analysis for all agglomerations considering criteria above) One single WWTP versus separate WWTP Storage tanks for small agglomerations / small WWTP Etc. Group individual agglomerations in “clusters” of agglomerations (=> scenario c in Definitions of UWWTD) 20

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA page 21 Agglomerations – Option Analysis Option 1 without Nemtisor

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA page 22 Agglomerations – Option Analysis Option 2 with Nemtisor

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Cost Data Base – Wastewater Networks page 23

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Agglomerations – Option Analysis and Cost Tables page 24

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Agglomerations – Option Analysis Selected: Option 1, Nemtisor and Targu Neamt separate Agglomeration Cluster page 25

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA How to define an Agglomeration in practice Prepare map on county level indicating: all agglomerations (3 categories according to size) agglomeration boarders (each single agglomeration) Boarder of “cluster of agglomerations” Existing sewer network Existing and proposed WWTP/storage tanks Existing and proposed sewer trunk lines and pressure mains (interconnection of agglomerations) and main pumping station Administrative boarders Rivers 26

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Countywide defined agglomerations Agglomeration Cluster Examples for Agglomerations – County Level

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA How to define an Agglomeration in practice Prepare data base for all agglomerations including (at least): Name of agglomeration Generated load (p.e.): total, existing, extension Compliance date Specific investment costs, operation costs and NPV (€ / p.e.) Scoring rate for Ranking Total investment costs for wastewater 28

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Selection of priority investments Two step approach: Step 1: Mandatory criteria Compliance date 2015 ROC established Step 2: Ranking Size of agglomeration (highest weight) Health improvement Environmental improvement Efficiency improvement 29

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Criteria for Ranking 30 N°CRITERIAINDICATOR A Size of agglomeration and improvement of connection rate Total generated load in Population equivalent Additional load connected in Population equivalent BHealth Risk B1water supply system without adequate sanitation system Number of households connected to the water supply but not connected to the sewer system (or individual/adequate sewer treatment B2Existence of sewerage network% of households connected to the sewerage network B3Physical condition of sewerage network % of sewer network highly depreciated or with insufficient capacity (high exfiltration to groundwater, sewerage overflow, etc.) CEnvironmental Pollution C1 Surface water pollution: Existing central sewerage network with no or inadequate wastewater treatment % of collected wastewater load discharged without treatment to the receiving water C2Groundwater pollution: Existence of adequate wastewater collection and treatment facilities % of total generated wastewater load (p.e.) collected and treated with effluent quality compliant to UWWTD Example for criteria and indicators for Wastewater

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Investment Scenarios for priority investment 1.Low Scenario (priority investments up to budget limit given by MESD 2.Medium Scenario minimum investments to reach compliance until High Scenario extended investments including additional agglomerations with compliance date beyond 2015 proposed in phase I 31

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Final Selection of Priority Investments  Discuss with MESD Investment SCENARIO (based on criteria and investment scenario)  Agree on agglomerations to be included in CF project  Prepare priority investment table (template for priority investment costs) 32

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Agglomeration boarders for selected Priority Investment Measures  Prepare detailed map for selected priority investment measures (Scale 1 : )  Detailed boarders of agglomerations  Cluster boarders  Existing/Proposed Infrastructure (WWTP, main sewers etc.)  Review/confirm option analysis 33

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Phasing of Investment Measures Based on agreed priority investment measures :  Prepare Long-term investment table (template for long term investment costs)  Prepare Map with phasing of agglomerations (categorise in 3 main phases) 34

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Approval by Local Authorities (LA)  Approval of LA on investment list is mandatory!!  Maps of agglomerations should be included in the Urbanism Plan (by LA)  FS might start in parallel with MP approval for the endorsed investments 35