Geotechnical-Geophysical Void Mapping and Foamed-Sand Backfilling of the Rapson Coal Mine, Colorado Springs, Colorado – Case Study Kanaan Hanna, Jim Pfeiffer.

Slides:



Advertisements
Similar presentations
Chris Tai Devico AS Regional Manager 30th Nov 2007
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Well-Seismic Ties Lecture 7 Depth Time Synthetic Trace SLIDE 1
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Topic 1Topic Q 1Q 6Q 11Q 16Q 21 Q 2Q 7Q 12Q 17Q 22 Q 3Q 8Q 13Q 18Q 23 Q 4Q 9Q 14Q 19Q 24 Q 5Q 10Q 15Q 20Q 25.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
BoRit Asbestos Superfund Site
Broadband Wireless Applications for the Mining Industry.
Basic Ground Penetrating Radar Theory
Module Reading Plans and Elevations
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
All Weather Masonry Construction. 2 International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction.
Presentation by Bert J Huls Prepared by Les MacPhie August 13, 2005
Presented by Manuel Fernandez Environmental Engineer
Dummy Dealers welcome !. euroCADcrete Step 1: General data euroCADcrete: Educational software according EC2.
Filling and Wrapping Review Sheet
VOORBLAD.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
Landform Activity for review.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Slide 1Niederleithinger BAM VIII.2 Flood Defence 2008 Toronto Evaluation of Geophysical Techniques to Investigate River Embankments E. Niederleithinger.
Addition 1’s to 20.
25 seconds left…...
1.What is the name of the movement dedicated to establishing a Jewish homeland? 2. What city is holy to Islam, Judaism, and Christianity? 3. Where was.
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Unit Rate $45 for 5 hours. Unit Rate $45 for 5 hours $45 5 H.
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Time-Lapse Monitoring of CO2 Injection with Vertical Seismic Profiles (VSP) at the Frio Project T.M. Daley, L.R. Myer*, G.M. Hoversten and E.L. Majer.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Technology Settlement Investigation using FutureScan Lindsay Ivey Burden.
Petrotech 2007 AOA Geophysics Inc Integrity Oil Services Specialists in Applied Geophysics.
Soils Investigation Soil Investigation
Eagle Mountain – Woodfibre Gas Pipeline Project Geotechnical and geophysical tests James Lota, FortisBC September 25, 2014.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
Marine Resistivity: a Tool for Characterizing Sediment Zones.
The main instrument used is called the sonde. A basic sonde consists of a source and two receivers one-foot apart. The sonde is lowered down the borehole.
Ground Improvement Dr. Talat Bader
Sedimentary Geology Geos 240 – Chapter 2 Collecting the Data Part 2 – Regional Geophysical Data Dr. Tark Hamilton Camosun College.
Engineering Presentation. Basic Soil Mechanics Soil type classification Gravel, sand, silt, clay Soil strength classification Granular soils (sand and.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
Central Mining Institute
Andrzej Kotyrba Central Mining Institute Katowice, Poland
Presentation transcript:

Geotechnical-Geophysical Void Mapping and Foamed-Sand Backfilling of the Rapson Coal Mine, Colorado Springs, Colorado – Case Study Kanaan Hanna, Jim Pfeiffer & Steve Hodges, Zapata Incorporated Al Amundson, Colorado Division of Reclamation, Mining and Safety Richard Palladino, Cellular Concrete Solutions Tom Szynakiewicz, Hayward Baker Joint Conference 2 nd Wyoming Reclamation and Restoration Symposium 30 th Annual Meeting of the American Society of Mining and Reclamation

2 Focus Project Site Location & Subsidence/ Sinkhole Problems Geotechnical-Geophysical Methodology Subsurface data acquisition and interpretation Exploratory boring Laser, sonar and video void investigation Colorado DRMS/Hayward Baker Ground Modification Treatment Low mobility grouting or compaction grouting (LMG) beneath houses Foamed sand slurry backfilling of large underground opening ZAPATA Video Monitoring of the Foamed-Sand Backfilling of the Rapson Mine ZAPATA Services

Project Site Location – Subsidence / Sinkhole Problems 3 Country Club Circle (CCC) Residential Neighborhood Historic subsidence Trough subsidence Sinkhole mitigation

4 A combination of several geophysical methods to provide reliable information Geology 40 to 50 ft of sand Cultural noise Target types & depth B & A seams Site conditions & accessibility Buried utilities Geophysical Methodology – Geologic Setting Project site conditions required:

5 Geophysical Methodology – Geologic Setting RVSP (borehole-surface) survey: - Mine working delineation - Target drilling XHT (borehole-borehole) Survey: - Pre & post grouting evaluation A Seam MASW (surface) survey: - Shallow subsurface evaluation - Target drilling Three seismic techniques were used: 1. Surface seismic, & 2. Two borehole seismic. Exploratory borings: - Ground truthing Supplemental tools: 1. Geophysical logging 2. Void mapping tools: - Laser, - Video camera, & - Sonar. Sand SS Silt-Clay Animated

6 Site Map and Geophysical Survey Layout

7 MASW Data Acquisition Land streamer setup: 48 channel, 4.5 Hz geophones iVi Envirovibe seismic source Recording vehicle (doghouse)

8 MASW data plots - Lines 3 & 8 MASW Data Interpretation

9 RVSP Data Acquisition RVSP setup: 136 channels, 40 Hz geophones, 2 ft spacing Survey lines crossing street and driveway Survey line crossing residence yard Recording vehicle (doghouse) Airgun seismic source

10 RVSP Data Interpretation RVSP data plot – A seam mine working delineation: Borehole CCC3

11 Exploratory Boring Program – Ground Truthing Drilling and sampling CSM 75 drill rig setupDrilling through ~ 40 ft sand Drilling through ~ 7 ft coal4 inch PVC casing installation Casing/grout setup w/ 10% bentonite

12 Standard penetration tests (SPTs) Exploratory Boring Program – Ground Truthing

13 Subsurface Physical Characterization Geophysical logs – Sonic, bulk density, resistivity

Geologic Profiles Geologic cross section (A-A)

15 Geologic cross section (B-B) Geologic Profiles

16 Mine Workings Void Investigation– Data Acquisition Laser, video camera, and sonar – Field setup Laser – Void scanning Video camera – Void imaging Sonar – Void scanning

Laser scans – Borehole CCC6 Mine Workings Void Investigation – Laser Results

18 Laser 3-D model of haulageway (main entry) Borehole CCC6 Mine Workings Void Investigation – Laser Results Laser 2D interpretation plan view Borehole CCC13

19 Video images interpretation – Borehole CCC6 Mine Workings Void Investigation – Video Results

20 Aligned Rapson No. 2 Mine Map Reconciliation of interpreted geophysical results w/ historic base mine maps Alignment of the Rapson No. 2 historic base mine map and haulageway entry RVSP results: The position of the mine workings in the north-northeast was shifted 25 ft north. Laser results: The position of the re-constructed haulageway was shifted 25 ft south and 17 ft west Interpreted mine workings RVSP results

Ground Modification Treatment 21 Colorado DRMS applied two ground stabilization techniques: Low mobility grouting (LMG) beneath houses, and Foamed sand slurry in entries/haulageways Hayward Baker performing ground stabilization (LMG) beneath a house area: Injection at 600 psi at the bottom of the hole, and 200 psi near the top of the hole Grout amount per house averaged ~ 348 yd cost of ~ $66,600

Ground Modification Treatment 22 Colorado DRMS applied two ground stabilization techniques: Low mobility grouting (LMG) beneath houses, and Foamed sand slurry of large mine opening (entries/haulageways) Hayward Baker performed stabilization in large mine opening using Geofoam TM developed and supplied by Cellular Concrete: The foam is generated on site and mixed with sand in a concrete mixer truck The foam takes the place of water, allowing the sand to flow similar to sand-and-water slurry Approximately 3 yd 3 of foam was mixed with 6 yd 3 of damp sand for ~ 5 minutes, The foamed sand slurry was then gravity fed down the 4-in PVC casing The flow of sand was monitored by the video camera from a nearby borehole, approximately 50 ft away The foamed sand slurry filled the void to the approx. quantity estimated by the laser scans (511 yd 3 ) The cost of the foam sand slurry is approx. half the cost per yd 3 of the LMG treatment

Ground Modification Treatment 23 Video images from CCC13 of foamed sand slurry backfilling in Borehole CCC6

24