Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
 Examples of bid-splitting Acceptable – When a project involves different trades and is not interdependent on the other. - If you are upgrading a room.
Surety Bond Claims State of Colorado 05/15/2013. State of Colorado Surety Bond Overview Construction Contract Surety Bonds  Bid – Guarantees bidder will.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
PUR Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
New York State Department of Transportation
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Completed the installation of the Back of House equipment into the Budweiser Events Center Worked with Larimer County Purchasing Department to write and.
Overview of Draft 2 (Version 4.0) ENERGY STAR Specification for Computer Monitors Craig Hershberg US EPA
REVIEW OF CMS “INITIAL APPROVAL” OF RHP PLAN AND FOLLOW-UP REQUIREMENTS May 8, 2013 REGION 10.
Contractor having difficulties performing work Contract Default Read Spec section 8-9. Talk with DCE about options. Various letters of concern may come.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Viaduc de Millau. Project timeline 28 June28 June 1989: governmental approval of the middle route October19 October 1991: selection of the.
Contract Training Class I
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 11/8/ Waste Pro of South Carolina and Greenspace Louis J. Diaz Region Vice President South Carolina and Coastal Georgia.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.

BU610 Applied Business Research 2015 Section A (Waterloo Part-time MBA) Faculty Advisors: Shelly Jha Detlev Nitsch Jack Schnabel.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
VT 100 over the Mad River Bridge Replacement July 13, 2015.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
Transition Plan Network Operations Model Change Requests 5/26/2010.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
City Council Meeting May 14, High Pedestrian Bridge Repairs Consideration of approving Change Order #15 to include the repair of the pedestrian.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Sebago Elementary School Withdrawal Committee
High Bridge Re-Deck Project
Big French Creek Slide Timeline of Events
Safety Department Fire Drills.
Hays County Commissioners Court
Project Purpose and Objective
A. Datum Corporation Bid package overview
CR3 and Crystal River Energy Complex
US26: Cornelius Pass Rd -185th Ave
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
A. Datum Corp. Bid package overview.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
February 2007 Note: Source:.
Commissioners Presentation
Timeline Overview Planned Timescales
McDonald’s calendar 2007.
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Ward Park Restroom Timeline
2015 January February March April May June July August September
Presentation transcript:

Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp modifications.

Region 3 Original Project Timeline Project Bid ~ February 2004 Contract Completion ~ January 31, 2008 Stem Wall Issues ~ June 2006 –Stem Wall Repairs ~ October 2007 –Repairs Complete ~ February 2008

Region 3 Stem Wall Damage Investigation Ground Penetrating Radar Impact Echo Hammer Impulse Resonance Core Drilling

Region 3 Ground Penetrating Radar

Region 3 Core Drilling

Region 3 Stem Wall Damage Pictures

Region 3 Stem Wall Damage Pictures

Region 3 Stem Wall Damage Pictures You can note that the rebar is pushed away from the concrete stem wall.

Region 3 Stem Wall Damage Pictures

Region 3 Overview of Stem Wall Damage

Region 3 Duct Bundling Allowance –vs- BR130

Region 3 Duct Bundling Allowance

Region 3 Stem Wall PT Duct Install Pictures

Region 3 Duct and Bundling Pictures

Region 3 Duct and Bundling Pictures

Region 3 Duct and Bundling Pictures

Region 3 Repair Details

Region 3 Another Issue The bottom of Deck is corrugated!

Region 3 Bottom of Deck

Region 3 Bottom of Deck

Region 3 Bottom of Deck Concrete Dobie Blocks The bottom of deck buckled between dobies

Region 3 Deck Form Boards Contractor used 11/32” plywood. Requirement is now 5/8” nominal thickness.

Region 3 Warpage: Contractor was required to remove this plywood on the remaining spans; 3 and 4.

Region 3 Where we are now. July 12, 2008 ~ Sent Ross Bros. a letter of Termination for Default. July 21, 2008 ~ ODOT received proposals from both the contractor and the surety. July 24, 2008 ~ ODOT rejected Ross’ proposal, but agreed to pursue Safeco’s 2 nd proposed option. Per the Standard Specifications, the contractor and their surety have the ability to propose a cure to the project with in 10 days of the notice. Ross’ proposal kept them as the Prime Contractor. Safeco’s proposal had 2 options; 1) keeping Ross as the prime and 2) Safeco taking over the contract and hiring a completion contractor.

Region 3 Where we are now. September 15, 2008 ~ ODOT signed a Takeover Agreement with Safeco. Highlights of Takeover Agreement –Safeco is now the Prime Contractor; –Safeco is allowed to use Ross Brothers; –Safeco will provide on-sight Project Manager –Safeco will assume Superintendent responsibilities per the STD Specs 150 section; –Safeco will reimburse ODOT ± $2M for stem wall repairs and investigation; –Safeco will reimburse ODOT ± $1.1M for continued CEI costs; –Safeco will reimburse ODOT ± $426K for LD’s; After 7 weeks of back and forth negotiations, ODOT and Safeco came to agreement.

Region 3 Where we are now. Highlights of Takeover Agreement; (cont) –Agreement established a new interim and new completion date; October 31, 2010 – All work complete except for site restoration, clean up, punch list, pier and falsework removal, planting, etc. August 31, 2011 – Final completion – All work must be complete. September 29, 2008 ~ Safeco was provided an NTP to proceed with the work under the new agreement. October 31, 2008 ~ The NB South Umpqua River Bridge was open to traffic.