1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

Sharing of ISTS Charges & Losses Regulation
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Settlement system of Bilateral transactions under Open Access
Madhya Pradesh Electricity Regulatory Commission Terms and Conditions of Tariff MPERC Comments on CERC Discussion Paper.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -R M Rangarajan & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Energy Accounting and Need for Special Energy Meters under ABT Regime.
AVAILABILITY BASED TARIFF. HIGHLIGHTS OF CERC ORDER DATED ON ABT 1. ORDER APPLICABLE TO J&K ALSO. 4. ABT WAS TO BE IMPLEMENTED IN ALL THE REGIONS.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Regulation and Commercial Issues in Bulk Power Generation Tariff By S.C.SHRIVASTAVA, Joint Chief (Engg) CERC, New Delhi 10/7/20151CERC.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Electricity pricing Tariffs.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Point of connection Mechanism
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
TARIFF DETERMINATION: GENERATION AND TRANSMISSION
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Congestion regulations
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
Presentation transcript:

1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore

2 WHAT IS Regional Energy Account (REA) ? “ REA is Statement of Allocation, Availability,Energy Scheduled/ injected and drawn which forms the basis for payment/ receipt among the constituents”

3 Requirement of REA To be FAIR and EQUITABLE To RECOVER DUES at the EARLIEST TRANSPERANCY Dispute Resolution Reconciliation RPCs have been entrusted with the responsibility of preparing REA at present

4 Scope of REA Regional Energy Account ISGS Other Regions Beneficiaries Traders CTU

5 Commercial Settlements Fixed/Capacity Charges Variable/Energy Charges Wheeling Charges Ratio(s) in which above to be shared by the beneficiaries. Any other charges as been specified by the competent authority from time to time like UI,Incentive, Transmission Charges etc.

6 Fixed Cost Elements Interest on Loan Return on Equity Depreciation O&M (personnel, Lubricants, Chemical etc.) Interest on Working Capital, IDC Insurance, Taxes, etc. (Independent of Energy produced)

7 Variable Cost Elements Primary Fuel Cost (Coal) (depends on Energy produced) Secondary Fuel (oil)

8 PRE-REQUISITES Notify Two part tariff Signing of BPSA/PPA/BPTA Payment security mechanism (BG,LC, ESCROW etc.) Suitable Metering Scheduling mechanism Tele-metering/SCADA

9 Pre ABT REA Fixed and variable charges merged to make single rate in paisa/KWhr Charges to be paid by beneficiaries on the basis of energy drawal No weightage to Entitlement/schedule of various beneficiaries in a particular generator (Typically in SR) Sample REA

10 PRE ABT TARIFF MECHANISM - Problems All inter-utility exchanges based on single flat paise/kWH This rate neither change with time of the day i.e; peak/off-peak or system conditions(generation surplus or deficit) Do not discourage MW overdrawals by SEBs.They could avoid this by proper load management, run their own higher cost generator DGs,GTs durng contingencies Do not induce power plant operator to back down generation during off-peak hours No financial compensation to any party for over stressing its power plants for assisting during contingencies SEBs view this composite figure only and compare with their own generating stations for their dispatch decisions ISGS(pit head plant)with lower incremental costs used to back down before backing down their own costlier load center generators This leads to perpetual operational and commercial disputes in the operation of region grid

11 Availability Based Tariff With a view to promote overall economic operation of the power sector and to achieve improvement in operational parameter GOI felt that the existing tariff structure in power sector needs to be rationalized. Accordingly GOI proposed, for sale of electricity by generating companies to the beneficiaries, a three part tariff structure in viz. Capacity charge, Energy charge, Unscheduled interchanges (UI)

12 AVAILABILITY BASED TARIFF(ABT) (a)CAPACITY CHARGE (b)ENERGY CHARGE (c)ADJUSTMENT FOR DEVIATIONS (UI CHARGE) (a)= a function of Ex-bus MW availability of power plant for the day declared before the day starts x SEB’s % share. (b)= MWh for the day as per ex=bus drawl schedule for the SEB finalized before the day starts x Energy charge rate (c)=Σ(Actual energy interchange in a 15 min time block – scheduled energy interchange for the time block) x UI rate for the time block. TOTAL PAYMENT =(a) + (b)± ( c)

Advantages of ABT Improved frequency and voltage Economic despatch Autonomy to the utility Incentive for high plant availability,but no incentive to over generation during off-peak hours Technically and commercially right Immediate solution for IPPs and Captives True free market ; market forces decide the pool price Pool price known on-line Total transparency ; No regulator required Simple practicable ; Meters already developed and installed

14 Flow chart of Accounting Procedure Data from RLDC (on every Thursday for the previous week) Preparation of Energy Accounts by RPCs Weekly UI and VAR Accounts (issued on every Tuesday) Monthly REA (Issued during 1 st week of month) GOI/CERC orders/notifications Board Decisions Preparation of Generation Schedule And drawal Schedule Disputes Mechanism and Resolution Hydro Generating StationInter State Transmission

15 Preparing final schedule noon ISGS SLDC Despatch schedule net Drawal schedule revision station-wise MW/MWH capability station-wise W/MWH entitlement required Drawal schedule AMPM RLDC Despatch schedule starts Drawal schedule starts final Despatch schedule final Drawal schedule BACK

16 Data Required for Preparing these accounts – to be furnished by RLDC Declared Capability (DC) and Dispatch/generation Schedule (GS) – Annexure 1AAnnexure 1A Entitlement of various beneficiaries – Annexure 1BAnnexure 1B Requisition by various beneficiaries – Annexure 1CAnnexure 1C Any bilateral Trading under STOAC – Bilateral FilesBilateral Files Wheeling to/from other regions – Wheeling FilesWheeling Files Processed Meter (SEM) data – 15 min block wise actual injection/drawal at various locations and reactive drawal/injection for a day – Raw SEM Data SEM Files BACK

17 Weekly Account Contains Unscheduled Interchange (UI) charges Reactive energy charges BACK

18 Monthly REA Contains (a)Availability % for Capacity Charge recoveryAvailability % for Capacity Charge recovery (b)Energy Scheduled for Energy ChargesEnergy Scheduled for Energy Charges (c)Energy scheduled beyond target PLF for IncentiveEnergy scheduled beyond target PLF for Incentive (d)Ratio for sharing of monthly Transmission Charges of CTURatio for sharing of monthly Transmission Charges of CTU (e)Ratio for sharing of monthly RLDC fees and O&M chargesRatio for sharing of monthly RLDC fees and O&M charges (f)Wheeling Charges for ISGS Power wheeled on state owned inter state lines.Wheeling Charges for ISGS Power wheeled on state owned inter state lines. (g)Energy Exchanged with other RegionsEnergy Exchanged with other Regions (h)Energy scheduled under STOAEnergy scheduled under STOA BACK

19 Unscheduled Interchange (UI) charges For Generators - UI = Actual Generation – Generation Schedule For Beneficiaries - UI = Actual Drawal – Ex-Periphery drawal Schedule For Other Regions - UI = Actual Metered energy – Net Schedule at Interregional Periphery

20 For the day: 0000 hrs. to 2400 hrs. Central Generating Stations 1 23 Ex-Bus Declared Capability x1x2x3 (Forecast) ____ _______ SEB-A’s sharea1a2a3 SEB-B’s shareb1b2b3 SEB-C’s sharec1c2c3 For a particular 15 minute time block SEB-A’s requisition a’1a’2a’3 SEB-B’s requisition b’1b’2b’3 SEB-C’s requisition c’1c’2c’3 _________ CGS’s schedule x1’x2’x3’ MW Sample UI Calculation

21 Issues involved in UI Accounting If During the day of operation any constituent feels that its schedule needs to be changed due to load crash/ tripping of generators etc. it can do so but revised schedule will be effective from 6 th time block. UI is to be suspended during grid disturbance / transmission bottle neck No UI for non commercial units and other stations not covered under ABT (Typically Nuclear stations) Any generation up to 105% of the declared capacity in any time block and averaging up to 101% of the average DC over a day is allowed. If generation goes beyond this limit, RLDC will investigate and if gaming is found UI charges due to such extra generation shall be reduced to zero and the amount shall be adjusted in UI account of beneficiaries in ratio of their capacity share in that generating station

22 Special Note for Gas Turbine Generating Station For the Gas turbine generating station or a combined cycle generating station if the average frequency for any time block, is 49.02<f<49.52Hz and Schedule generation is more than 98.5% of the declared capacity, the scheduled energy shall be deemed to have been reduced to 98.5% of the DC, and if average frequency for any time block, is below 49.02Hz and Scheduled generation is more than 96.5% of DC, the scheduled generation shall be deemed to have been reduced to 96.5% of the DC

23 For the day: 0000 hrs. to 2400 hrs. Central Generating Stations 1 23 Ex-Bus Declared Capability x1x2x3 (Forecast) ____ _______ SEB-A’s sharea1a2a3 SEB-B’s shareb1b2b3 SEB-C’s sharec1c2c3 For a particular 15 minute time block SEB-A’s requisition a’1a’2’a’3 SEB-B’s requisition b’1b’2’b’3 SEB-C’s requisition c’1c’2’c’3 _________ CGS’s schedule x1’x2’’x3’ MW Revised Schedules

24 Actual (metered) injection of CGS-1 in the time block = X 1 MWh. Excess injection = (X1 – x1’ ) MWh. 4 Amount payable to CGS-1 for this =(X1-x1’) X UI rate for the block. 4 SEB-A’s scheduled drawl for time block = a’1+a’2’+a’3 = a’ MW (ex-ISGS Bus) SEB-A’s NET drawal schedule = (a’ – Notional Transm. Loss) MW = (a’ – Notional Transm. Loss) = A’ MWH 4 Actual (metered) net drawal of SEB-A during time block = A MWH Excess drawal by SEB-A = (A-A’) MWh. Amount payable by SEB-A for this = (A-A’) * UI rate for the block. All above payments for deviations from schedules to be routed through a pool A/C operated by RLDC SAMPLE UI ACCOUNT STATEMENT

25 Variations in actual generation/drawal and scheduled generation /drawal are accounted through UI. This is a frequency linked charge which is worked out for each 15 minute time block. Charges for all UI transaction, based on average frequency have following rate of paise per KWh from up to UI rate (Paise per KWh) Average Frequency of time block 50.5 Hz. and above 0.0 Below 50.5 Hz. and upto Hz.5.6 Below Hz. and upto Hz Below Hz Between 50.5 Hz. and Hz. Linear in 0.02 Hz. step Unscheduled Interchanges (UI)

26 UI rate w.e.f to UI rate (Paise per KWh) Average Frequency of time block 50.5 Hz. and above 0.0 Below 50.5 Hz. and upto Hz. 8.0 Below Hz. and upto Hz Below Hz Between 50.5 Hz. and Hz. Linear in 0.02 Hz. step

27 UI rate w.e.f Average Frequency of time block (Hz,)UI rate (Paise per KWh) Below Not below Rate (Each 0.02 Hz. Step is equivalent to 6.0 paise/kWh in the Hz. Frequency range and to 9.0 paise/kWh in the Hz. Frequency range).

28 Energy transactions of UI from/to Pool Over Gen. By ISGS-1 Under drawl by SEB-A UI import/Export from IR-1 Under gen. By ISGS-2 No one to one correspondence System frequency UI Rate Regional Pool Over drawl by SEB-B UI Import/Export to IR-2

29 Operation of Pool Separate Pool a/cs operated by RLDCs on behalf of RPCs for UI, IRE and Reactive charges Regional Pool Payable by ISGS-2 Payable by SEB-B Payable/Receivable by IR-2 Receivable by ISGS-1 Receivable by SEB-A Payable/ Receivable by IR-1 No one to one correspondence No cross adjustments allowed between the constituents

30 IRE Account UI Calculated for Inter Regional Exchange are calculated at different frequency rate so net payable will not be same as net receivable by other region.the difference will go to IRE Account Normally the flow of power will be from higher frequency to lower frequency so there will mostly be surplus in IRE account. This will be shared by the two region on 50:50 basis and will be adjusted towards transmission charges. BACK

31 REACTIVE ENERGY CHARGE : PAYABLE FOR : 1.VAR DRAWALS AT VOLTAGES BELOW 97% 2.VAR INJECTION AT VOLTAGES ABOVE 103% RECEIVABLE FOR: 1.VAR INJECTION AT VOLTAGES BELOW 97% 2.VAR DRAWAL AT VOLTAGES ABOVE 103% APPLIED FOR VAR EXCHANGES BETWEEN : A)BENEFICIARY SYSTEM AND ISTS - THROUGH A POOL ACCOUNT B)TWO BENEFICIARY SYSTEMS ON INTER-STATE TIES - BY THEMSELVES Rs /MVARh (from 1 st April 2005) Basic Rate : 4 paise/kvArh ( for the year ) 5% ESCALATION PER YEAR SAMPLE VAR ACCOUNT STATEMENT

32 Issues in Reactive Energy charges Deficit in pool (SR & ER) -due to continuous High voltages in SR Surplus in Pool (NR &WR) Utilization of Accruals Disputes in payments between Beneficiaries for Reactive charges in Inter-state Lines BACK

33 Capacity charge Capacity charge is based on Annual Fixed Charge and will be related to Availability of generating station. Availability means the readiness of the generating station to deliver ex-bus output expressed as a percentage of its rated ex-bus output capability. Target Avb. For Fixed charges recovery ( Notified by CERC ) 100% recovery - if % Availability >=Target Availability Pro-rata reduction if %Avl<T.Avl.

34 Calculation Of Availability % Availability = i=1 N DC i / {NxICx(100-Aux n ) }% Where DC i = Average Declared Capacity for i th day of the period in MW N = Total no. of days during the period Aux n = Normative Auxiliary Consumption as % of gross Gen. IC= installed capacity in MW % Availability forms the basis for calculations

35 Monthly Capacity charges receivable by an ISGS: 1 st Month = (1xACC1)/12 2 nd Month = (2xACC2-1ACC1)/12 …. …. 12 th month = (12xACC12-11ACC11)/12 where ACC1,ACC2…….ACC12 = Annual capacity charges corresponding to the cum. Availability up to the corresponding month. Monthly Capacity charges payable by a beneficiary : 1 st Month = (1xACC1xWB1)/12 2 nd Month = (2xACC2xWB2-1ACC1xWB1)/12 …. …. 12 th month = (12xACC12xWB12-11xACC11xWB11)/12 where WB1,WB2…..WB12 = Weighted average % share up to the corresponding month. BACK Extract from SR REA

36 Extract of SR REA BACK

37 Energy charge: Energy charge is related to the scheduled ex-bus energy to be sent out from the generating station and will be worked out on the basis of paise per KWh. The Energy Charges Payable by beneficiary to the ISGS = Variable Charge of ISGS X Ex – Power Plant Schedule The Energy Charges Receivable by ISGS from beneficiaries = Variable Charge of ISGS X Despatch schedule of ISGS BACK Extract from SR REA

38 Extract of SR REA BACK

39 Flat rate of 25ps/u For ex-bus Schedule Energy in Excess of ex-bus energy corresponding to Target PLF Incentive for ISGS PLF = i=1 N SG i / {NxICx(100-Aux n ) }% BACK

40 Ratio for sharing of monthly Transmission Charges of CTU Monthly Weighted average entitlement % from all ISGS in the region and other regions BACK

41 Ratio for sharing of monthly RLDC fees and O&M charges Monthly Weighted average entitlement % from all ISGS in the region BACK

42 Wheeling Charges for ISGS Power wheeled on state owned inter state lines. BACK

43 Energy Exchanged with other Regions As furnished by RLDC BACK

44 Energy scheduled under STOA As Furnished by RLDC in Bilateral File BACK

45 HYDRO POWER GENERATING STATIONS

46 CAPACITY INDEX Daily Capacity Index = Declared Capacity(MW) Maximum Available Capacity(MW) Monthly Capacity Index = (Average of Daily Capacity Index)

47 NORMATIVE CAPACITY INDEX FOR RECOVERY OF FULL CAPACITY CHARGES During 1 st Year of Commercial Operation Run-of-river85% Storage Type80% After 1 st Year of Commercial Operation Run-of-river90% Storage Type85%

48 COMPUTATION OF ANNUAL CHARGES TWO PART TARIFF –Annual Capacity Charge based on Capacity Index –Primary Energy Charge based on Scheduled Energy

49 PRIMARY ENERGY RATE Minimum Variable charge of Central Sector thermal power station If Primary Energy Charge > Annual Fixed Charges, then Primary Energy Rate = Annual Fixed Charges Saleable Primary Energy Secondary Energy Rate=Primary Energy Rate

50 INCENTIVE = 0.65 x Annual Fixed Charges (CIA- CIN)/100 CIA = Capacity Index Achieved CIN = Normative Capacity Index BACK

51 INTER STATE TRANSMISSION

52 TARGET AVAILABILTY Target Availability for recovery of full transmission charges AC system 98% DC system95% (HVDC Bi-pole links and HVDC back- back stations)

53 SHARING OF CHARGES FOR INTRAREGIONAL ASSETS n =  Tci-TRSCx CL i=1 12 SCL TCi = Annual Transmission charge for ith project TRSC=Total recovery from Open Access CL=Allotted transmission capacity to a customer SCL=Sum of all the allotted transmission capacities

54 SHARING OF CHARGES FOR INERREGIONAL ASSETS = 0.5xTCj-RSCj x CL 12 SCL TCj = Annual Transmission charge for jth interregional asset RSCj=Total recovery from Open Access CL=Allotted transmission capacity to a customer SCL=Sum of all the allotted transmission capacities

55 INCENTIVE = Equity x (Annual Availability- Target Availability)/100 BACK

56 Disputes Mechanism and Resolutions All Accounts to remain open for 20 days for verification. Any Deviation to be bought to the notice to RPC Secretariat. RPC Secretariat will verify the data and take corrective action if required and issue the revised account. If it is found that account is as per the data furnished by RLDC. RPC Secretariat may ask the aggrieved Party to verify the correctness of the data with RLDC. If RLDC finds data needs to be changed, such changes will be intimated to RPC and then RPC will issue the revised account based on the revised data. If aggrieved Party is still not satisfied it may take up the issue with CERC for its decision.

57