An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.

Slides:



Advertisements
Similar presentations
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
Advertisements

Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
DIRECTION DE LA RECHERCHE Marc FLORETTE Jeudi 29 mai 2008 The advantage of mCHP as a high efficiency gas solution for the residential market Gas industry.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
Renewable Energy in Islamic Republic Of Iran
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
CODE Project WP3 – Modelling support for cogeneration across the EU27.
Feasibility of Solar Technology Adoption: A Case Study on Tennessee’s Poultry Industry Ernest F. Bazen & Matthew A. Brown Presented by Yao Yin.
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
Financing renewable energies in Myanmar COMMITTEE 2 ON RENEWABLE ENERGIES AND CLIMATE CHANGE ADAPTATION.
Combined Heat and Power in the Ethanol Industry Tom Kerr Energy Supply and Industry Branch U.S. Environmental Protection Agency Governors’ Ethanol Coalition.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
American Wind Energy Association Presentation by: Randall Swisher, Executive Director American Wind Energy Association Wind Market Overview COG Renewable.
DOE OFFICE OF INDIAN ENERGY Key Project Development and Financing Concepts 1.
China’s Sustainable Energy Policy
Engineering Technology Division
Integrating Renewables – A Utility Perspective Jennifer S. Szaro OUC ~ The Reliable One.
Presented by: Gerald W. Braun, Director Business Development June 17, 1998 A Business Unit of Amoco/Enron Solar Financing of Renewables: Considerations.
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
The National Danish Energy Policy focus on waste and biomass Anders H Kristensen Danish Energy Agency.
Heat Management – A business opportunity CONNECTIVE ENERGY A company developed by Carbon Trust Enterprises.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
The National Danish Energy Policy focus on waste and biomass Anders H Kristensen Danish Energy Agency.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Energy Efficiency – The First Fuel The Danish Experience Jiangsu - May 21st 2015 Counsellor Christian van Maarschalkerweerd – Embassy of Denmark.
CLEANER ENERGY for a Greener future CLEANER ENERGY for a Greener future Laidlaw Energy Group, Inc. 90 John St 4 th Fl New York, NY
Business Plan Presentation. Mission “To deliver a revolutionary new energy system by producing a unique pump that makes the most efficient use possible.
1 Best Practices for Program Implementation: Lessons from the Geothermal Heat Pump Experience Harvesting Clean Energy Conference.
Assistant Secretary of the Army (Installations, Energy & Environment) UNCLASSIFIED Privately Financed Projects - Keys To Success Ms. Kathy Ahsing August.
[Legislative] [American policy] Passing of the Public Utility Regulatory Policies Act (PURPA) in Introduced competition within the supply sector.
Capital Financing for Energy – Related Projects George Williams, SVP and Chief Operating Officer El Paso Electric Company May 20, 2010.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
Michael R. Walker Research Director IGCC Financing Project Kennedy School of Government, Harvard University PH: , FX:
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Introducing the Atlantic City Alternative Energy Authority ACAEA A Municipal Utilities Authority Pursuant to NJSA 40:62-12.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
Construction of Coal-Fired Generation: Evaluating the Utility Credit Implications Ellen Lapson, Managing Director Fitch Ratings, Utilities, Power & Gas.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
Wind Power in New Hampshire 2016 ACEC / NHDOT Technical Exchange Conference April 7 th, 2016.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Rating Agency Discussion Enron Price Uncertainty Products (“PUPs”)
NS4960 Spring Term 2017 Korea: Energy Policy
Wind Project Ownership - An Investor Owned Utility Perspective John R
Wind Project Ownership - An Investor Owned Utility Perspective John R
Insurance Company Partner Discussion Enron Price Uncertainty Products (“PUPs”) December 21, 1999.
NS4960 Spring Term 2018 Korea: Energy Policy
Renewable Energy Project Investments
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Renewable Power to Fuels Symposium - May
Presentation transcript:

An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green Coast Energy Phone:

Milestone 1: The Concept What technology, what fuel type? –Biomass, wind, solar, waste heat, etc What State/County/City? –Choice of state will be contingent upon state renewable policies & permitting requirements The Business Model/Pro Formas –How much will it cost? Is it cost-feasible?

Milestone 2: The Location Local support Zoning--generally Heavy Industrial Rail and/or highway access Size Interconnection with local utility Permitting--DEP, EPA, FERC, etc

Milestone 3: The Purchased Power Agreement Primary source of revenues, most important part of a successful project -And the part that the PSC has the most ability to make a difference Term Capacity payments Energy payments Fixed energy payments -Mitigates fuel price volatility to customers -Makes financing more feasible due to less uncertainty in revenue PSC Approval

Milestone 4: The Fuel Supply Heat rate of fuel type, in BTU's per ton Tons required per day to operate plant Tipping fees from fuel suppliers Cost of fuel preparation (cleaning, etc) Note: This primarily describes an example biomass/waste-to- energy project. A solar or wind project would not face these same issues; either the resource is or is not there, and no contracts must be signed to utilize the sun or wind.

Milestone 5: The EPC Contract Sign turnkey agreement with engineering firm that specializes in EPC Or, a very experienced Developer's Engineer could purchase all the equipment from different manufacturers (a boiler from Vendor A, a turbine from Vendor B, etc) Total cost to install per KW Construction time frame

The 5 Steps are Completed: Now What? To obtain financing, the renewable project must demonstrate –Enough revenues to meet a debt coverage ratio –An Internal Rate of Return that is satisfactory to equity investors Debt vs Equity: The Financing Mix –High level of competition for equity funding from other states…required rate of return often 12%- 30%, higher when more projects competing

What Can the Public Do to Help Bring Renewables to Florida? Understand the full costs of NOT having renewable energy (pollution, dependency, upward-trend price volatility) Understand the value that renewable energy brings in future price stability and environmental conservation Keep these in mind if the price/kwh of renewables is initially higher than fossil fuels

Gas Prices Illustrated

What Can the PSC Do to Help Bring Renewables to Florida? The PSC has great influence over the most key part of the renewable project: the Power Purchase Agreement. Staff and Commission has been working diligently for some time, and has recently adopted a rule that makes great progress. Now, it is up to the PSC to enforce this rule and require Standard Offer Contracts to fairly compensate renewable providers. –Contracts must provide enough revenues to cover expenses, and offer sufficient return to equity investors.

The Bottom Line If the PSC requires and approves Standard Offer Contracts from the IOUs as previously mentioned, then renewable energy will blossom and thrive in Florida. This will encourage financiers to bring their investment money to FL, and provide environmentally-friendly, price-stable electricity to the customers. Florida becomes a national LEADER in renewable energy, and a paradigm for other states.