African THORPEX Status Aida Diongue-Niang ANACIM/Senegal Met. Service African THORPEX Regional Committee co-chair 1.

Slides:



Advertisements
Similar presentations
Moving the process forward Sálvano Briceño UN/ISDR.
Advertisements

© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Status Report on Task Team of Drought Management Sandor Szalai Membet of TT-DM Szent Istvan University, Hungary
World Meteorological Organization Working together in weather, climate and water EXPECTED RESULT 1 ENHANCED CAPABILITIES OF MEMBERS TO PRODUCE BETTER WEATHER.
World Meteorological Organization (WMO) Severe Weather Forecasting and Disaster risk reduction Demonstration Project (SWFDDP) Steve Ready WMO RA V SSWS.
THORPEX-Africa Aida DIONGUE-NIANG, André Kamga FOAMOUHOUE, Ernest AFIESIMAMA, Kwabena ASOMANIN, Amare BABU, Arona DIEDHIOU, Benjamin LAMPTEY, Abdalah MOKSSIT,
SWFDP-SA: Evolution, challenges and successes Mark Majodina South African Weather Service 1 October 20141FCAST-PRE
The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
“A LPB demonstration project” Celeste Saulo CIMA and Dept. of Atmos. and Ocean Sciences University of Buenos Aires Argentina Christopher Cunningham Center.
WMO Competency Standards: Development and Implementation Status
EMERGENCY ALERTING POLICY WORKSHOP Haleh Kootval Chief, Public Weather Services WMO Montreal, Canada, 1-2 May 2012.
Slide 1 TECO on the WIS, Seoul, 6-8 November 2006 Slide 1 TECO on the WIS: Stakeholder Session THORPEX and TIGGE Walter Zwieflhofer ECMWF.
African THORPEX Status By Aida Diongue-Niang Senegal Meteorological Agency THORPEX AR1 Rapporteur African THORPEX Regional Committee co-chair ICSC-9, Geneve,
Global Terrestrial Networks : The Hydrological Network.
Severe Weather Forecasting Demonstration Project (SWFDP) Peter Chen Chief, Data-Processing and Forecasting System Division Weather and Disaster Risk Reduction.
World Meteorological Organization Working together in weather, climate and water Adaptation to Climate Change Impacts on Coastal Communities M.V.K. Sivakumar.
On-going WMO Demonstration Projects related to EXPO2010 Multi Hazard Early Warning System Multi Hazard Early Warning System Leading by SMB/CMALeading by.
Severe Weather Forecasting Demonstration project for southern African countries Portfolio committee, 21 August 2007.
GEO Work Plan Symposium 2014 WE-01 Jim Caughey THORPEX IPO.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Climate change and Environmental Degradation Risk and Adaptation assessment Step 2 Collect scientific information.
Climate Forecasting Unit Prediction of climate extreme events at seasonal and decadal time scale Aida Pintó Biescas.
World Meteorological Organization Working together in weather, climate and water EC-WGCD 1 - Dec 2011 Regional Programme and South-South Cooperation WMOwww.wmo.int.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
United States of America8 Dec 2009, GenèveSAP Workshop for WMO FFI Forecasting in the USA The National Weather Service River Forecast System (NWSRFS),
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Regional Node Northern Africa - Middle East - Europe (SDSWAS NA-ME-E) Summary of Activities since last RSG meeting, November 2008, Tunis Michael Schulz.
CAS AREP 1 WMO DPM Programme Coordination Meeting, 4-6 December, Geneva COMMISSION FOR ATMOSPHERC SCIENCES (CAS) ATMOSPHERIC RESEARCH AND ENVIRONMENT PROGRAMME.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
1 Stefanie Dannenmann-Di Palma, Programme Officer UNISDR Europe Climate Change Adaptation and Disaster Risk Reduction: A.
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
ADP SUPPORT IN UGANDA BUILDING A NATIONAL DATA ARCHIVE Presented by Kizito Kasozi Director Information Technology Uganda Bureau of Statistics PARIS21.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
Let’s Recall: African Ministerial Conference on Meteorology (AMCOMET) was established in April 2010 when African ministers responsible for Meteorology.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate”
Strategic Planning and Future Structure of the World Weather Research Programme (WWRP) Gilbert Brunet WWRP/JSC Chair Acknowledgements to Michel Béland.
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
Forecasting systems WMO Atmospheric Research and Environment Programme David Burridge.
J N MUTEMI University of Nairobi & IGAD Climate Prediction and Applications Centre Geneva, 8-10 May 2012 The Observing System Research and Predictability.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
TOWARDS DEVELOPMENT OF THORPEX AFRICA PLAN Andre KAMGA FOAMOUHOUE ACMAD For THORPEX AFRICA REGIONAL COMMITTEE 88 th AMS Annual meeting, Jan 20-24, New.
SERA & GIFS-TIGGE 22 February 2010 Eighth Meeting of the TIGGE-GIFS Working Group WMO HQ, Geneva, Switzerland Brian Mills Adaptation and Impacts Research.
Africa Climate Conference : Arusha, October 2013.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
Eugene Poolman RSMC Pretoria
Severe Weather Forecasting Demonstration Project (SWFDP) Bay of Bengal
West Africa Regional Work Plan Example
CREWS West Africa Regional Work Plan
THORPEX report to the CAS Management Group Alan Dickinson ICSC Chair
Links with GEO.
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Linking operational activities and research
La Plata Basin Originated from sub-seasonal workshop focussing on link seamless prediction climate to weather.
High Impact Weather Emerging challenge identified at CASXVI
Severe Weather Forecasting Demonstration Project (SWFDP)
Presentation transcript:

African THORPEX Status Aida Diongue-Niang ANACIM/Senegal Met. Service African THORPEX Regional Committee co-chair 1

Background  First THORPEX Planning meeting, Ouagadougou, February 2007 (gather African Scientists and International Community) Present THORPEX programme Present the African Science and Implementation draft document Set up a Task Force to write-up the document  THORPX TF meeting, Dakar, September 2007 Complete the Science Plan Outline feasable tasks for Implementation Prepare the 2 nd planning meeting  2 nd THORPEX planning meeting, Karlsruhe, November 2007 ( gather African Scientists and International Community) Present the revised Science Plan Discuss the Implementation activities Propose the composition of the Regional Committe 2

Background (2)  RC meeting in Pretoria2008 Review of the African Science Plan and Writing of the African Implementation plan  Production of the Science and Implementation Plan distribution to 52 African nations through PR;  25 nominated national representative  Proposals submitted to seek for funding, Canadian IDRC, EU,GEO, Karlsruhe 3

THORPEX-Africa scientific questions 4 MSGIR 02 August h00UTC  What is the available knowledge and understanding of the dynamical and physical processes of high-impacts events in Africa?  What is the skill of prediction of HI events at short to extended range?  How can we improve predictability of HI weather in Africa?  What are the best ways and appropriate tools to dissemintate information to end-users?  How to quantify and evaluate benefits of improved forecasts for societies, economy and environment?  How do we build and maintain an information system on African HIW?  What is the optimum conventional observing network to improve HIW monitoring and forecast?  What is the impact of « new observing systems » on predictabiliy of HIW?  What managable telecom. systems can enhance exchange of data through global regional and national centre?

DAOS1: Design of an optimum network in Africa DAOS2: Use of non conventional observing systems DAOS3: Improvement of telecommunications facilities PDP2: Contributing to the Development of Seamless forecast by filling the gap in intraseasonnal timescales PDP1: Predictive Skill of high impact weather SERA1: High-impact weather database SERA2: Forecast verification and cost/benefit assessments TIGGE Predictability and Dynamical Processes Societal and Economic Research Application observing systems 5 5 THORPEX-Africa Implementation, Plan, 2009

Relatively poor performance on modeling systems over Africa (particularly in Tropical Africa): 1.Misrepresentation of some key processes (NWP & Climate models ) 2.Poor observing network (+ transmission failure ) + An important Gap in NWP model development and use in Africa THORPEX-Africa: context and motivation  Impact on forecast and service delivery for societal and economic needs THORPEX-Africa aims at contributing to :  Improve forecasts and reduce the adverse effects of hydro-meteorological related natural disasters in Africa and  Promote multidisciplinary collaboration between research, operations, applications and user communities through studies in line with societal and economical needs in Africa. 6

Implementation: THORPEX-Africa 1st Workshop, 5-8 October 2009, ICTP, Trieste Sponsor (THORPEX Trust Fund, ICTP, GEO, RIPIECSA) 7 Attended by : Representatives of National Meteorological services throughout the African continent (~20) and ACMAD Representatives of major forecasting centres (ECMWF, NCEP, UK Met Office METEO-France, DWD) Research scientists (climate/meteorology, information system, hydrology, socio-economic) from Africa, Europe and North America, Representatives of relevant programmes (AMMA, GEO, EUMETNET/GEONetCAst, JWGFR, SERA, THORPEX WG, MEDEX, WIS, SDS-WAS, UCAR Africa Initiative, etc)

THORPEX-Africa 1st Workshop, 5-8 October 2009, ICTP, Trieste Objectives  To have a better picture of HIW in Africa, their impact and the warning process used. 8  To give a momentum to THORPEX-Africa planned activities regarding HIW Information system and predictability studies.  To identify tools and products available in/for African Met. Services for predicting HIW.

Tools for Predicting HIW /Assessing predictability Heterogeneous level across the continent: 1.Use of few NWP global models products through EUMETCAST distribution 2.Use of more NWP products using also Internet for dedicated Web page and/or through Retim distribution 3.Additional diagnostics with regional/local models, research- development activities, e.g. SAWS, Morocco, Algeria, Kenya Senegal 4.Systematic verification and feedback: only in few centres or in a framework pf projects (e.g. SWFDP) 5.Use of ensemble prediction: very rare, few countries mostly in Southern Africa with the SWFDP 9

Implementation Activities Case studies at sub regional basis Prototype of information system 10

Pre-CAS-XV, Incheon, November T T Tg s S s S s S Main High-impact Weather In Africa From NHMS presentations Dry spells Tropical cyclones Cyclogenesis Flooding and Landslides Strong winds Sand & Dust Episodes, Heat waves Frost 11

? ? Representatives of Met Services proposed to work at sub-regional basis focussing first on flooding events but also dust events & aerosols, dry spells, heat waves, marine hazards 12 Coordi. West Coordi. East& Centre Coord. South African RC Coordi. North Focal P. NMHS1 Focal P. NMHS2 Focal P. NMHSn Case studies at regional level

13 3 -year demonstration project with 3 phases Phase 1 High impact weather Event Description and Database Design Phase 2 Forecast skill Assessement Phase 3 Modelling activities

Why A High-Impact Weather Predictability and Information System ? The limitation of well documented cases of high impact events and data exchange within African sub-regions: a severe impediment to progress in reducing the adverse effects related to HIW Need for a mechanism to collect and exchange high impact weather data  facilitate processes/predictability studies, socio-economic research applications, forecast improvement and mitigation of detrimental effects of HIW.. Requirement to establish a database of key high-impact African weather events, consisting of observations, model outputs, event- documentation and associated predictability studies analyses, (evaluation, modelling) 14

Approach for implementation 15 While seeking for funding start the work in parallel with a few selected case studies (on a sub-regional basis; north, west, central, east, southern Africa) with  data collection (both weather and impact data) to feed an interim information system  model assessment to predict high-impact weather on the other hand will be performed

Status of case studies Progress has been slow in Phase 1: i)synoptic analysis, ii)extremeness analysis, iii)conceptual model still not completed Problems of resources: human for animation; funding for networking, training Structural problems: poor operational environment, lack of skill, limited human resources, poor interaction with universities Low involvement and commitment at higher level in NHMSs TO FOLLOW-UP  Invite THORPEX working groups, PDP, TIGGE to be involved in African THORPEX case studies.  Need of minimum of resources to enable people interacting focusing on few countries while seeking in parallel for more resources 16

Status of the interim database Space Disk allocated by ICTP but there is the need to design the database and frame the associated metadata. ICTP can help build the database that can be transferred to another African centre. This will require a person dedicated for this purpose who can go and work at ICTP as a visitor for a specified period of time. To Follow-up and given minimum of resources 17

Way forward: Implementation activities  Linking THORPEX-Africa research to operations Design a template on (HIW) events and encourage and promote reporting of HIW close to near real-time and near real-time model verification using diagnostics derived from deterministic and ensemble models Feedback to be provided. Customized TIGGE products for validation & application in Africa ? Working with the TIGGE WG and the SWFDPs in Southern and Eastern Africa and with RSMCs in other regions?  Continue to seek for funding  Training on NWP and ensembles forecasting and TIGGE dataset. 18

Thanks for your attention Questions? Contributions? 19