Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Airi Asperk Estonian Competition Authority Baltic Electricity Market Mini-Forum Jurmala Conclusion of the Monitoring WG 2 nd meeting.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Transparency Florence Forum, Dec Transparency is vital for energy markets Transparency in terms of: –Creating and strengthening trust to.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Jan Müller Bundesnetzagentur ERI Central.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Completing the EU internal energy market
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Position on Market integrity framework and transparency Florence Forum 6 December 2012 Robert Gersdorf.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Transparency for market participants in the Northern Europe whole sale market Status and challenges By Jan Hansen, DERA.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Single Auction Office 1 Mini-Forum of Central Western Europe Brussels, 20th June 2006 Dr. Frank-Peter Hansen Federal Network Agency.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Vivi Mathiesen Florence Forum, Florence 13 Dec 2010 Third Compliance Monitoring Report.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Transparency Florence Forum, Dec
New transparency guidelines
Nordel's comment on transparency Juha Kekkonen Fingrid
ETSO Comments on the draft Congestion Management Guidelines
Update on European Network Codes
Incentives for electricity infrastructure – ERGEG view
Presentation transcript:

Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008

2 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Introduction (1/2) Issue of transparency identified as very important for development of regional markets Regulators in all other REMs of central Europe published regional transparency reports Northern Europe: published in September 2007 Central Western Europe: published in December 2007 Central Eastern Europe: published in February 2008

3 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Introduction (2/2) Regulators of Central South REM decided to move along this path Transparency report for the CSE REM drafted Goal: Harmonized implementation of Congestion Management Guidelines (CM-GL), cf. chapter 5 Enhancing comparability of market data of different countries/ regions

4 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Framework for the report (1/2) Based on Congestion Management Guidelines ERGEG GGP-IMT Goal: Implementation of Congestion Management Guidelines (cf. chapter 5) Special national obligations of publication are not considered in this report

5 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Framework for the report (2/2) Transparency Report is not a legal act by itself BUT: Demonstrates common interpretation of CSE NRAs concerning transparency rules of binding Congestion Management Guidelines (cf. chapter 5) Compliance with these guidelines will be monitored on basis of this common interpretation

6 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 List of definitions Five chapters on different topics Load Transmission and Interconnectors Generation Balancing Wholesale Market In most cases obligation of publication according to chapter 5 of the Congestion Management Guidelines Otherwise voluntary publication is proposed (e. g. data on wholesale market)

7 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Location of publication General rule: publication on a common TSO website envisaged Obligation to publish is on TSOs ETSO Vista as option Information could be published at websites of PEX, but no voluntary publication scheme, i.e. information about all power plants > 100 MW is published links to websites of PEX on TSO website open to all market participants, not only participants of PEX

8 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Data Provision TSO is responsible for publication Market participants obliged to provide TSOs with relevant data Provision of data of market participants not connected to TSOs grid Data available to DSOs Obligation of DSOs to provide TSOs with this data Enforceable by NRAs or other competent authority

9 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Implementation schedule From : Publication of generation data On national homepages of TSOs (or website of power exchanges) Publication of all other data (Load, transmission and interconnectors, balancing) On common European website (e.g. ETSOVista) If possible: Voluntary publication of aggregated information regarding wholesale markets

10 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Public consultation Public consultation of CSE Transparency Report Shall start at the beginning of May Will last for four weeks Draft report will be available on the Regional Initiative web page of the CEER/ERGEG website Comments should be send via Regulators welcome comments on all parts of the draft transparency report Additionally Regulators ask eight specific questions which are included in the consultation document

11 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Further steps in the CSE - Region Public consultation Finalisation of the Report Publication of all comments received, unless explicitly stated that contribution is confidential Evaluation of comments received Publication of final transparency report for the CSE REM in Autumn 2008 Monitoring of implementation of transparency report

12 ERI Central South Europe CSE Stakeholder Group Meeting, 21st April 2008 Thank you for your attention! Jan Müller Transmission Network Access and Cross-border Trade in Electricity Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railways Tulpenfeld 4, Bonn Tel: