Date Roadway Designer Resurfacing Restoration and Rehabilitation Kevin Jackson, Technical Director, TLI Bentley Systems, Inc.

Slides:



Advertisements
Similar presentations
Find the solutions. Find the Vertex and Max (-1, 0) (5, 0) (2, 10)
Advertisements

Welcome To Intersection Design Presented at: Bentley 2009 Roads and Bridge Conference Charlotte, North Carolina Presented by: Dirk Karasek The Envision.
Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer.
© 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
Tutorial 3: Slope stability and soil nailing walls
HST Rough Toolpaths. Cut Parameters Note: The cut parameters will change based on the toolpath type. When possible the same settings will be brought into.
© 2009 Bentley Systems, Incorporated Chuck Lawson GEOPAK Product Engineer Abutment Design with Roadway Designer.
Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Target Aliasing Clipping Corridor Point Control - When and Where.
© 2009 Bentley Systems, Incorporated Chuck Lawson GEOPAK Product Engineer Advanced Intersection Design with Roadway Designer.
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
ECGD4107 Pavement Engineering Summer 2008 Sat. 15:30-18:30 PM K004
Click on File - > Open. Click on Database Click on “Open”
Moving to Civil V8i Select Series 3 Robert Garrett.
Presented By: Chuck Lawson, PE Paving the Way for Roadway Designer in GEOPAK V8 i (SELECTseries 1)
Using OpenRoads Effectively
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
GEOPAK Corridor Modeling
Unit 11 – Derivative Graphs Section 11.1 – First Derivative Graphs First Derivative Slope of the Tangent Line.
Lesson 13 Graphing linear equations. Graphing equations in 2 variables 1) Construct a table of values. Choose a reasonable value for x and solve the.
Integrated Technology I Excel Review Mr. Ursone. Using Excel Things to Remember: Things to Remember: Formulas you type in will always follow order of.
Lesson 1 – Microsoft Excel The goal of this lesson is for students to successfully explore and describe the Excel window and to create a new worksheet.
Ansys Workbench 1 Introduction
Planning for Earthwork Construction
© 2009 Bentley Systems, Incorporated Corey Johnson-Bentley Intersection Design with Roadway Designer.
Lesson 4 - Revising the Document Layout Microsoft Word 2010.
3.4 Linear Programming p Optimization - Finding the minimum or maximum value of some quantity. Linear programming is a form of optimization where.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. ACCESS 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 7 – Adding and.
Computer Information Technology – Section 4-12 Some text and examples used with permission from: Note: We not endorsing or promoting.
© 2009 Bentley Systems, Incorporated Richard W. Bradshaw Director of Development – Rail Design Modeling with Bentley Rail.
Joe Waxmonsky, PE InRoads Product Manager End Conditions in Template Creation.
Chapter 7 Advanced Part Modeling Techniques. After completing this chapter, you will be able to perform the following: –Extrude an open profile –Create.
4 th Tuesday – CAD Training Call-in Info: (865) , PIN: Topic – InRoads XM:  Updates Getting updated/new styles and preferences into an.
© 2009 Bentley Systems, Incorporated Dan Eskin, PE Bentley Systems Cross Section and Profile Tidbits.
© 2009 Bentley Systems, Incorporated Michael Cavanaugh Product Manager, Road and Site InRoads V8i SELECTseries 1.
all possible y -values all possible x -values The lowest or highest point of a parabola. Minimum: lowest point (bottom of the valley) Maximum: highest.
© 2012 Bentley Systems, Incorporated Moving to Civil V8i Select Series 3 Robert Garrett, Bentley Systems Inc. Product Manager.
Course 6: Analyzing AVO/AVA Analysis. Use gassman’s equations to predict velocity Objective accurately predict changes in amplitude.
Presented by: Chuck Lawson, PE Roadway Designer and Machine Control – What You Need to Know.
© 2014 Bentley Systems, Incorporated Templates 202 Presented by: Chuck Lawson, PE Bentley Systems, Inc.
GEOPAK Corridor Modeling Roadway Designer. File Names dtm - This is the Digital Terrain Model in the InRoads format, a DTM includes stringlines representing.
GEOPAK Corridor Modeling Derricke Gray, GEOPAK Product Manager.
December 2011 n 4ce Quick Start Guide Volumes Volumes can only be calculated once you have created a DTM. In simple terms, triangles from the Current DTM.
December 2011 n 4ce Quick Start Guide Sections Profiles are generated in n 4ce as either Long or Cross Sections. Sections can be positioned in plan using.
Presented by: Chuck Lawson, PE Best Practices In Roadway Designer.
© 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Roadway Designer - Completing Your Project.
Key Applications Module Lesson 14 — Working with Tables Computer Literacy BASICS.
Introduction to BIM Module 04 – Interiors and Circulation.
© 2009 Bentley Systems, Incorporated Earthworks for InRoads V8i.
Scrollbar1 The Scrollbar A final tool in the toolbox is the scrollbar. There are two of them, one ordered horizontally and the other vertically, both do.
Lesson Seven: Key Features of Linear and Quadratic Relationships
PLANNED LINES HYPACK 2016.
5.1: Rate of Change and Slope.  Rate of change: Shows the relationship between two VARIABLE quantities.
3.4 Linear Programming p Optimization - Finding the minimum or maximum value of some quantity. Linear programming is a form of optimization where.
Click once to reveal the definition. Think of the answer. Then click to see if you were correct. Spreadsheet / Workbook A grid of rows and columns containing.
Microsoft Word: Tables
Homework Check.
Layer Thickness and Map Width
3.2 Linear Programming 3 Credits AS
Let’s Review Functions
Optimization Problems
Final Review Day 2 Algebra 1.
Linear Programming.
What can you tell me about this graph?
8.4 Linear Programming p
Unit 1 Day 1 Key Features of Graphs
Graphing linear equations
Spreadsheets and Data Management
Let’s Review Functions
Let’s Review Functions
Presentation transcript:

Date Roadway Designer Resurfacing Restoration and Rehabilitation Kevin Jackson, Technical Director, TLI Bentley Systems, Inc.

| 2| Overlay / Milling Components Vertical Adjustments Cross Slope Optimization Roadway Designer Overlay Tools

| 3| Objectives – Overlay Components Overlay Components Stripping Components Quantities and Reports Cross Slope Optimization Vertical Adjustments & Alignments

Overlay Tools – Overlay / Stripping Components

| 5| Add New Component > Overlay/Stripping Top Option Bottom Option Follow Surface Follow Component

| 6| Overlay Component

| 7| Create Pave + Overlay Template –Drag the Overlay_Only template into it so that the bottom of pavement and Overlay points merge. Test Run Roadway Designer –Change to Pave+Overlay template –Note that Overlay now extends full width

| 8| Stripping Component

| 9| Create a Pavement+Overlay template –Add a Milling Component –Match the bottom three points Test Create a Pavement + Overlay + Milling Component Run Roadway Designer

| Multiple Layers Different Overlay Layers? –Use Follow Lowest / Follow Highest

| Review the 05_OverMill_Complicated Corridor (multiple overlay layers, saddlebags, quantities)

| Standard: End-Area Volume Reports Quick: Component Quantities –Provides Component Quantities and Costs –Not exact: good for quickly comparing alternatives –For “complete” quantities use the full End-Area Volumes functionality Component Quantities

| Run Roadway Designer Launch Component Quantities Walk the Corridor Disable Parametric Constraints

| Reports on Overlay/Stripping components that have the Stripping option set. Milling Stylesheet (set Default) Milling Report

| Generate a Milling Report

Overlay Tools – Vertical Adjustments

| Overlay Overlay + Max Milling Min. Milling w/ & w/o Max. Milling Vertical Adjustment Scenarios

| Structural Integrity of new Backbone Minimum amount of overlay material (minimum overall overlay thickness) Full-width Milling Milling: maximum depth of high-point milling Vertical Adjustments: the Engineering

| Given a template, it determines the Template Top. –This is the triangulated surface –Regardless of the complexity of the template, the Top is a simple left-to-right linestring It compares the vertices in the Top to the vertices in the Active Surface It finds the Minimum (or Maximum) Vertical Difference value It adds the Backbone Thickness, Overlay and/or Milling values to determine an Adjustment Value. –Adjustment is completely independent of anything other than the Top line and the Surface Vertical Adjustments: the Methodology

| Determined from Top segments in the template –Everything under the top ignored The Backbone Thickness is used in Adjustments Template Top

| Horizontal Range of Comparison must be defined Template Top –User Selects Two Template Points to define the left and right ends Existing Ground Range –Use the Template Points used for the Top –Or - Follow Alignments, Features or Styles –Or - Fixed Offsets Vertical Adjustments Horizontal Range

| Solution Options –Compare at Template Points Only or at all Section Points –Maximum Difference can be set Vertical Adjustments Comparisons

| Critical Points and Vertical Delta Only Two Comparison Points/Vertical Deltas matter: Zero Overlay Point and Minimum Milling Point

| Vertical Adjustment Geometry Critical Point = Min. Milling Point for Min. Milling Zero Overlay Point for Overlay Critical Delta = Existing Surface Elev. - Template Top Elev. at the Critical Point Direction matters + is up, - is down

| Minimum Milling Top is moved to the lowest position where it intersects the existing surface Establishes “Bottom” of backbone

| Backbone Thickness (always positive) is added to the (positive or negative) Min. Milling Delta –Adjustment = Min. Milling Delta + Backbone Thickness Backbone Thickness

| In Roadway Designer select the 02_Pavement* Corridor Select Display Mode: Overlay Vertical Adjustments: Set Template & ex Ground Range Select Use Minimum Milling Walk the Corridor, observe

| Step 1: Find the Minimum Overlay point: the intersection between the top and the existing ground where the Top is highest Minimum Overlay

| Minimum Overlay Value –Between Backbone Bottom and high point of existing (Minimum/Zero Overlay Point) –Zero or greater –Added to Adjustment Overlay Settings

| Steps 2 and 3: Add the Minimum Overlay Value to the Zero Overlay Delta and add the Backbone Thickness Minimum Overlay

| In Roadway Designer select the 02_Pavement* Corridor Select Display Mode: Overlay Vertical Adjustments: Set Template & ex Ground Range BB=0, Min Overlay = 0 Walk the Corridor, observe

| Change the Backbone Thickness to 0.2 ft [0.1m] Walk the Corridor, observe Change the Minimum Overlay to 0.2 ft [0.1m] Walk the Corridor, observe

| Sets a maximum limit to milling Milling is limited to –Maximum Milling Value or –Minimum Milling Point (full-width milling) Minimum Milling with Maximum Milling

| Set to Minimum Milling Select the Maximum Milling option Key in 0.1 [0.05] Walk the Corridor, observe

| Mills out High Points Requires less Overlay Material than with no milling Can save significant money Minimum Overlay with Max Milling

| Milling Adjustment value is the last adjustment Total Adjustment is never negative Milling Adjustment is limited by –The Max Milling Value or –Zero Adjustment point Minimum Overlay with Max Milling

| Change the Maximum Milling depth to 0.1 [0.05] Walk the Corridor, observe Change the Corridor Vertical to None Walk the Corridor, observe

| Vertical Adjustments do not require vertical alignments Components behave the same regardless of how they’re controlled vertically. To “Permanently Save” the Adjustments you’ll need to make an Alignment: –Smooth Adjusted Vertical Alignment –Apply Adjusted Vertical Alignment Final Cleanup: can use standard alignment tools Vertical Alignments

| Smooth the Vertical Adjustment Save the Vertical –envelopes Review the Vertical Push the Corridor w/o Adjustments (go w/ adj. to see if the Adjustment deviates from 0.0) –If different: verify that the Adjustment settings were the same