Administering Lump Sum P/T Contracts via a Cost Loaded Schedule

Slides:



Advertisements
Similar presentations
Chapter 6 Practical Methods to Reveal CPM Covert Activities
Advertisements

Project Management with VIVA PPM Tool (Project Portfolio Management)
2010 HPRCT Presentation – Optimized Human Error Evaluation June 23 rd, 2010 Presenter: Terry J. Herrmann, P.E. Associate, Structural Integrity Associates.
Project Management Concepts
CPM Scheduling Techniques & Technologies Cayuga I-35E, St. Paul
A Short Course in Project Management
Effective Contract Management Planning
TRAFFIC MANAGEMENT Tender and Construction Phase
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CP Chapter 4 Schedule Planning.
Project Management from Simple to Complex
SE503 Advanced Project Management
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
SIM Program Status FFY Q1, SIM Program FFY 14 Q1 Status SIM Program Overall Status and Description: Overall Status Key delays and issues in evaluation.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Ensure Vendor/Engineer of Choice Product Quality
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Project Cost Management Estimation Budget Cost Control
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management Session 7
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Edward B. Farkas, Managing Director, Project Management Practice
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Geog 469 GIS Workshop Project Management.
Project Life Cycle.
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Copyright © 2003 Primavera Systems, Inc Primavera User Conference Schedule Bingo presented by Mike Stone w/Professional Project Management Services.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Introducing Project Management Update December 2011.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Measurement and Payment
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
CHAPTER 7 – Managing Project Schedules. “Plan the Work” “Work the Plan” “Endorse the Plan” + 10% of Project effort + 90% of Project effort “Align the.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
SOFTWARE PROJECT MANAGEMENT
The Contract Management Process Post Award Activities.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
© Copyright 2008, Information Control Corporation. All rights reserved. Project Management Bytes Making WBS work for you! 1.
Fundamentals of Project Management and Schedule Development.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Project Management PTM721S
Chapter 11 Project Management.
Establishing and Managing a Schedule Baseline
Project Management Chapter 11.
Start-Up Meeting <Project No. / Project Name>
Project Integration Management
Project Integration Management
CAD DESK PRIMAVERA PRESENTATION.
Conventional Facilities
Second Avenue Subway Project Execution Strategy
Presentation transcript:

Administering Lump Sum P/T Contracts via a Cost Loaded Schedule Tom Wiener, P.E. MnDOT Project Controls Engineer Matt Reid, P.E. HDR Engineering, Inc.

Background – Why?

Cost Loaded Schedule Allows for Breakdown of L.S. Cost Validate Costs of the L.S. Better Quality Control Better Progress Control and Monitoring Earned Value / Revenue Techniques Why us Cost loaded schedule to administer Payment Cost Breakdown Estimates still can be done internally on major qty and compared to the L.S. Bid Better Progress Control When payment becomes an integral element of the schedule the result is a schedule that is paid attention too – thus a more useful schedule Better Quality Control When payment is linked to a deliverable the result is BETTER SCOPE DILIGENCE & LESS REWORK

Cost Loaded Schedules Contractor Consultant Schedule of Values (Low Bid Contract) Lump Sum Bid items are Cost Accounts in P6 that align with Unit Rate bid items Coming to consensus on the Schedule of Values or LS Cost Centers is very important if you are going to be able to maintain a cost estimating basis of connecting this to your unit rate costs

Cost Loaded Schedules Contractor Consultant Challenges Faced Schedule of Values Contractor Consultant Challenges Faced We’ve Never Done This Before ($14.2M QBS) Office of Audit/Validation of Costs Creating Negotiated Work Packages from RFP Schedule Was a Learning Curve for Consultant

MN Earned Revenue Method Provides Method for Equity Control Allows for Schedule Risk to be Reduced Reduces Fears of Lump Sum Lump Sum Encourages Innovation Scope Diligence Streamlined Payment Administration OR Maybe Why not Lump Sum Transfer of Risk In large part I’m not here to argue the merits of a contract LS or Unit Rate Contract. I am here to demonstrate successful techniques for addressing some biggies of why not But what if we don’t want to dictate means and methods – say a DB contract More clear understanding of the scope Less scope creep Less cost growth

St. Croix Design Schedule

St. Croix Design Schedule Lump Sum Contract Requirement 1st Design Contract – Lump Sum CPM Use of MnDOT SWIFT Codes 1010 – Project Management 1250 – Misc. Engineering & Support 2824 – Special Studies ABUT DECK PIER Oracle Primavera P6

Types of Schedules Baseline Schedules – 1st plan for executing work and progress measured from Update Schedules – record of progress on a monthly basis; actual dates, remaining durations, actual cost, earned value. Revised Schedules – Re Baseline if necessary

St. Croix Baseline Development Schedule built locally Coordination with Functional Leads and MnDOT Baseline Acceptance Baseline Uploaded to MnDOT Hosted P6 Environment

St. Croix - Work Breakdown Structure (WBS)

MnDOT CPM Specifications Similar to MnDOT CPM Const Specs – 1803 Activity Durations 5-20 days Activity must have Predecessor/Successor No Lags/Leads Constraints Contract Time, Delays, Impacts, Failure to complete work on time Very similar to MnDOT standard spec for construction cpm.

St. Croix Scheduling Schedule Activities – 465 Logic Relationships – 750 Constraints – 14 Initially, 2 Afterward Critical Activities – 40, less than 10% of Project, no more than 30% per spec

Assigning Cost Accounts to Activities- Cost Loading SWIFT Codes Differentiate Subs – Multiple Entries Reporting

Schedule Updates – Earned Value Schedule Updated Monthly Purposes of CPM Coordination with Design Functional Leads Schedule Narrative Highlights Anticipated/Final Milestones Critical Coordination Activities Change in Schedule Logic Payment - Invoicing

Schedule Updates – Invoicing 17 page invoices vs. 80-100 page invoices for similar sized projects, including labor/expense backup.

Benefits of Design CPM on St. Croix Organization Define deliverables in an organized format Ensure all contracted deliverables are accounted for Activities have agreed upon budget Communication Relationship between disciplines and other parties Responsibility - activities are assigned to companies, DOT When deliverables are required logically Analysis On time – baseline comparison and float analysis On budget – Internal earned value/percent complete analysis Risk or Impact mitigation – All parties can identify and mitigate potential risks, allocate or shift resources

Consultant Contract Was it worth it? Yes Validated Scope of Work Consultant buy-in to the process Truly managed schedules (Earned Revenue Mngt) We needed this design done on time Streamlined Payment administration – Auditing History

Where Are We At/Going? Projects in Scoping and Design Phase Project In Construction Phase Contractor’s build schedule in our network 1/1/13 Piloting BIM and CTD schedules 3/1/13 Select Unit Rate project Resource and Cost Loaded 3/1/13 Role and Resource Loaded of CE&I staff 6/1/14 Projects in Scoping and Design Phase Programmed Projects Role and Resource Loaded 6/30/13 All planned projects Role loaded by June 30, 2014 Taxpayer Transportation Accountability Act Cost Loading Unit Rate projects – done this in the past -

Administering Lump Sum P/T Contracts via a Cost Loaded Schedule Q&A? Administering Lump Sum P/T Contracts via a Cost Loaded Schedule Tom Wiener, P.E. MnDOT Project Controls Engineer Matt Reid, P.E. HDR Engineering, Inc.