11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

PRODUCTION AND OPERATIONS MANAGEMENT
Chapter 12 Aggregate Planning.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Manufacturing’s Objectives
DOM 102: Principles of Operations Management Operations Scheduling
1 Session 16 Scheduling System Examples The PAC Data Base Twin Disc Shop-Floor Control Report Finite Loading Example Steelcase Vendor Scheduling Report.
Rev. 11/30/03SJSU Bus David Bentley1 Chapter 5 – Capacity Planning and Control Definitions, capacity measurement, MRP II and capacity, utilization,
Perencanaan Kapasitas Produksi
Chapter 5 – Capacity Planning and Control
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Production and Service Systems Operations
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Production Activity Control
Production Planning and Control Introduction
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Production Activity Control
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 12a Resource Requirements Planning: MRP and CRP.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
Aggregate Planning.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
©The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin Chapter 14 Capacity: Matching Productive Resource to Demand.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 © The Delos Partnership 2003 Supply Chain Techniques Getting the plan executed.
CAPACITY MANAGEMENT Nyoman Pujawan.
CAPACITY PLANNING Prof. Dr. Orhan Torkul Res. Assist. M. Raşit Cesur.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
(Material Requirements Planning)
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Activity Scheduling and Control
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Manufacturing Systems Engineering
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Basics of Supply Chain Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Material Requirements Planning (MRP)
Capacity Planning and Utilization
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Department Of Pharmaceutics. PRODUCTION It is a process or procedure of converting a set of inputs, namely men, capital, information & energy into finished.
Introduction to Materials Management
13 Aggregate Planning.
Chapter 7 Capacity Planning and Management
Manufacturing Planning and Control
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
OUTLINE Questions? Quiz Discuss homework New Homework Start MRP.
Capacity Planning.
OUTLINE Questions? Quiz Results New homework MRP Capacity.
Manufacturing’s Objectives
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources needed to meet the priority plan; selecting methods to make that capacity available –Controlling: monitoring output, comparing it with the plan, & taking corrective action

22DSCI4743 Matching Capacity and Demand Demand Management –vary prices –change lead times –encourage/discourage business Capacity Management –adjust staffing –adjust equipment and processes –change methods to facilitate production –redesign the product to facilitate production

33DSCI4743 Capacity Planning Process Determine the capacity each work center Translate the released & planned orders into the capacity each work center in each time period Sum up the capacities required for each work center to determine the load on each work center in each time period Resolve differences between available capacity and required capacity

44DSCI4743 Resource Planning RP involves long-range capacity resource requirements & directly linked to production planning RP involves changes in manpower, capital equipment, product design, or other facilities that take a long time to acquire & eliminate. The production plan & RP set the limits and levels for production

55DSCI4743 Rough-Cut Capacity Planning RCCP is the process to check feasibility of the MPS (end items) provide warnings of any bottlenecks ensure utilization of work centers advise vendors of capacity requirements

66DSCI4743 Capacity Requirements Planning (CRP) CRP is directly linked to the MRP (component items) CRP is the most detailed, complete, & accurate of the capacity planning techniques & is highly important in the immediate time periods

77DSCI4743 Inputs for Capacity Planning Inputs needed are: –open shop orders from open order file –planned order releases from MRP –routings and time standards from the routing file –lead times and work center capacities from the work center file

88DSCI4743 Inputs for Capacity Planning Planned order releases are determined by the computer’s MRP logic based upon the gross requirements for a particular part. Used to help assess the total capacity required in future time periods.

99DSCI4743 Inputs for Capacity Planning Routing file is the path that work follows from work center to work center as it is completed and should contain: –Operations to be performed –Sequence of operations –Work centers to be used –Possible alternate work centers –Tooling needed for each operation –Standard times: setup times and run times per piece

10 DSCI4743 Inputs for Capacity Planning Work center file is composed of a number of machines or workers capable of doing the same work and should contain –Move time -- time taken to move material from one workstation to another –Wait time -- time a job is at a work center after completion & before being moved –Queue time -- time a job waits at a work center before being handled –Lead time -- sum of queue, setup, run, wait, & move times

11 DSCI4743 Determining Capacity Available To calculate available capacity, we need: Available time = # of machines*# of workers*# hours of operation Utilization = % of time that the work center is actually active Efficiency = a ratio of the actual output to standard expected output

12 DSCI4743 Utilization and Efficiency Problem A work center produces 90 standard hours of work in one week. The hours available are 80, and 70 are actually worked. Calculate the utilization and efficiency of the work center.

13 DSCI4743 Rated Capacity Rated capacity = measure of the output that can be expected for a work center Rated Capacity = available time x utilization x efficiency e.g., A work center has 3 machines and is operated 8 hours a day for 5 days/week. Past utilization has been 75% & efficiency has been 110%. What is the rated capacity? Available time = 3 x 8 x 5 = 120 hours per week Rated capacity = 120 x 0.75 x 1.10 = 99 standard hours

14 DSCI4743 Demonstrated (Measured) Capacity Demonstrated capacity = proven capacity calculated from actual performance data (i.e., average capacity) e.g., Over the previous four weeks, a work center produced 110, 140, 120, & 130 standard hours of work. What is the demonstrated capacity?

15 DSCI4743 Required Capacity Determining required capacity: (1)determine time needed for each order at each work center = sum setup time & run time (i.e., standard operating time-SOT) (2) sum capacity required for individual orders to obtain a load Order QtySetup TimeRun TimeSOT Released Orders Std. Hrs Std. Hrs. Planned Orders Std. Hrs Std. Hrs. Total Time152.0 Std. Hrs.

16 DSCI4743 Scheduling Orders Calculate each work center SOT=setup time + (run time per piece x number of pieces) Calculate lead time Lead time = SOT + queue time + wait time + move time Back Scheduling - start with the due date and, using the lead times, to work back to find the start date for each operation

17 DSCI4743 Resolving Differences Change Capacity -Overtime or undertime- Hiring or layoff -Shift work force- Alternate routings -Subcontract Alter Load -Alter lot sizes- Reschedule