LBT Q1 2008 Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q1 2008 Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
DARSI 2 CDR Adrienne Baile Preston Schipper Matt Hulse Project Overview Components: Design Status Administrative Data Acquisition & Real-time System Integration.
1. 2 LabVIEW for FRC Doug Norman National Instruments January 6, 2012.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
MICE Electronics & DAQ P J Smith University of Sheffield.
Networked HVAC Controller Bradley University Department of Electrical & Computer Engineering By: Ed Siok Advisor: Dr. Malinowski.
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Westminster Christian Fellowship Buzzcard Access Control System Benjamin Davis Nathan Firesheets Mark Whitmer May 3, 2010 School of Electrical and Computer.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
RCEEMS Project Remotely Controlled Engine Management System Valery Gorohovsky & Shmuel Koyas Supervised by Boaz Mizrachi 19/04/2012.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Guide to Linux Installation and Administration, 2e1 Chapter 2 Planning Your System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
Status Report 3 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/15/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBTO software startup/shutdown and troubleshooting July 18, 2006 Chris Biddick 1 cjb.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
TriDAS Equipment database Equipment database is partially built (Oracle). Currently consists of 2 separate databases.  DB I – database containing.
LBT Q Software Review GCS – Guiding and Active Optics.
IEEE Robotics - Requirements Presentation Presented by Jason Abbett and Devon Berry.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
Real-Time DSP MCSPU Controller. Hardware Bittware “Hammerhead” SHARC board (1) Bittware “Reef” boards (with FPGA) (2) General Standards ADADIO (2) General.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
LBT Q Engineering/Software Review ROTRotators.
ECE477 Senior Design Android street car Team 12 Libo Dong 1.
Status Report #4 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/13/2012 Design an electronic system to track the.
T Project Review Muuntaja I1 Iteration
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
State of developments on Readout interface of European DHCAL
Presentation transcript:

LBT Q Eng/SW Review ROT - Rotators

4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable chain development proceeding BG cable chain development proceeding The MCSPU can make the LUCIFER rotator Hold, Slew and Track The MCSPU can make the LUCIFER rotator Hold, Slew and Track PCS can command the LUCIFER rotator PCS can command the LUCIFER rotator The engineering interface has 6 rotator pages and over 50 rotator commands The engineering interface has 6 rotator pages and over 50 rotator commands

4-Apr-2008LBT Q Eng/SW Review Progress Complete first BG integration √ Complete first BG integration √ Complete first BG telescope installation √ Complete first BG telescope installation √ Prepare for first BG commissioning Prepare for first BG commissioning Complete BG cable chain prototype Complete BG cable chain prototype Begin DG detailed mechanical design √ Begin DG detailed mechanical design √ Additional Progress Additional Progress LUCIFER rotator now controlled by MCSPU / PCS √ LUCIFER rotator now controlled by MCSPU / PCS √ Rotator telemetry functional (though not though TEL) √ Rotator telemetry functional (though not though TEL) √ Rotator software integrated with mount software √ Rotator software integrated with mount software √ Built/tested/installed Reef Interface Module (one channel) √ Built/tested/installed Reef Interface Module (one channel) √ Tested/installed prototype Rotator Interface Module √ Tested/installed prototype Rotator Interface Module √ Tested/installed prototype Power Driver Module √ Tested/installed prototype Power Driver Module √ Built/partially tested second Rotator Interface Module √ Built/partially tested second Rotator Interface Module √ Developed microcontroller functional test software √ Developed microcontroller functional test software √ Completed Rotator Interface Module VHDL code √ Completed Rotator Interface Module VHDL code √ Manufactured additional GPCOM boards √ Manufactured additional GPCOM boards √ Built second and partially built third Power Driver Module √ Built second and partially built third Power Driver Module √

4-Apr-2008LBT Q Eng/SW Review Open Issues Technical Technical BG: Issues in software/electronics BG: Issues in software/electronics Linux kernel stability Linux kernel stability Rotator CPP causes servo thread to terminate Rotator CPP causes servo thread to terminate Rotator/mount integration – Rotators change azimuth behaviour Rotator/mount integration – Rotators change azimuth behaviour Very little run time, more issue expected to emerge Very little run time, more issue expected to emerge BG: Cable chain still high risk BG: Cable chain still high risk DG: None DG: None Schedule Schedule Schedule is very tight Schedule is very tight Budget Budget None None Resource Resource Limited people to support BG completion and DG design Limited people to support BG completion and DG design Competition with other projects (Swing Arms, Counter Weight, Gregorian SW Testing, etc.) Competition with other projects (Swing Arms, Counter Weight, Gregorian SW Testing, etc.) Availability of telescope for testing / commissioning Availability of telescope for testing / commissioning

4-Apr-2008LBT Q Eng/SW Review Planning (Q2/2008) Complete BGR2 lab integration Complete BGR2 lab integration Complete BG cable chain design Complete BG cable chain design Complete BG cable chain integration Complete BG cable chain integration Install SX BG cable chain on telescope Install SX BG cable chain on telescope Complete DGR detailed mechanical design Complete DGR detailed mechanical design Start manufacture of large DGR structure Start manufacture of large DGR structure Order other DGR long lead items Order other DGR long lead items Test/install second set of rotator electronics Test/install second set of rotator electronics Rev. Power Drive Module relay board Rev. Power Drive Module relay board Debug integrated rotator/mount software Debug integrated rotator/mount software Test/debug software for new Rotator Interface Module features Test/debug software for new Rotator Interface Module features Test/debug cable chain software Test/debug cable chain software Develop/test and debug Rotator Interface Module microcontroller software Develop/test and debug Rotator Interface Module microcontroller software Define numerous events in the Event Logging System Define numerous events in the Event Logging System Many shared memory variables need to be created to communicate rotator status info to the rest of the TCS Many shared memory variables need to be created to communicate rotator status info to the rest of the TCS Update the software specification Update the software specification GUI (Q3 or Q4?) GUI (Q3 or Q4?)