Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)

Slides:



Advertisements
Similar presentations
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Advertisements

L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
ZONE 18 CRYOGENICS M. Sanmarti On behalf of AT-ACR-OP section.
Olivier Pirotte AT-ECR-ME NTof Examples of cryogenic equipment installed by AT/ECR-ME O. PIROTTE.
1 MICE at RAL MICE Collaboration RAL, 2 November 2003 Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov, Tony Jones, Jim Rochford Engineering.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review of the Tests of Superconducting Magnets in SM18 14 th January 2005 Review of the Cryogenic Infrastructure in SM18 Bruno Vullierme ACR-MT.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
LCLS-II Cryoplant Overview
New Contract Operation and Exploitation Preparation Duties Philippe Gayet.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
Makara/Geynisman, Aug. 31, Cryo Dept. Shutdown Status.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
CRYOGENIC SYSTEM of RAON Chul Jin Choi CnC Team, Accelerator Division Chul Jin Choi CnC Team, Accelerator Division.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Internal review of superconductors and magnet laboratories 2nd part: SM 18 & b.163: current status, weak points, possible improvement Cryogenics Vladislav.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Final Design Cryogenic and mechanical configurations
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Study and Development of Large Cryogenic Systems in China
EHN1 Cryogenics Integration
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
He Plant, LN2 Systems and Commissioing
HL-LHC IT STRING and Series test of SC link
Innovative He cycle Francois Millet.
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
on behalf of FCC cryogenic team
Status of the cryogenic system for B180
Block 4 and Cluster D - Safety
Cryogenic cavern in Asian site
TEST PLANS for HL LHC IT STRING
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
ESR2 Process Cycle Design
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
ESR2 Process Cycle Design
Review Bloc 4 and SM18 facilities and upgrade
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)

Cryogenics Infrastructure for Test Areas SM18 LHC Magnet and Cavity Test Facility 4.5K, 1.9K: CCU + WPU, Precooler, GHe recovery infrastructure Meyrin Site LHC Cable Test Facility, Bldg. 163 Sulzer Chemtech liquefier 5 g/s LHe, 1.9K: WPU, GHe recovery infrastructure Prevessin Site Block 4 Magnet Test Facility Sulzer SNA g/s, 1.9K: WPU Meyrin West Area Former ATLAS Test Facility Sulzer TCF 200 mod K, no 1.9 K, LHe forced flow with centrifugal pumps (80 – 1200 g/s)

SM18 LHC Magnet and Cavity Test Facility External Cryogenics Compressor Refrigerator: STAL S93-26 (1/5bar), S75-26 (1/5bar), S73/26 5/20 bar) MW(3.3kV), 30 kW (380V), 0.4 kW (24V) Cold BoxLinde K, as liquefier: approx. 25 g/s Design: K, 3 80K, 8 g/s LHe 1.9 K Stage: CCU 1 + (CCU 2 not connected) WPU 1/2: Leybold 4x SV1200, RA3001, RA13000, RA 16000; 420 kW Heater WPU: 70 kW LN2 precoolerPrecooler: 3 KAESER FS440, bar, 250 kW Tcontrol & Warm-up heaters: 330 kW Proximity Cryogenics Valve Boxes Distribution outlets magnet testbenches, cavities, STRING, GREC Dewar LHe dewar Cryostats12 Magnet Test Bench Infrastructure Recovery Compressor3 x Sulzer Burckhardt 120 m3/h, 200 bar, 40 kW Purifier2 x Linde Purifier, 200 m3/h, bar Balloons/ Gazometers 5 x 80 M3 LN2 reservoir52'620 l Control Systemexternal cryogenics: CP, CB & infa.: ABB Magnet Test benches: PCVUE32 WPU1: Siemens S5 PLC -> S6 PLC 3.3 kV V1.2 MW CV Operation FSU420 kCHF/year Maintenance C kCHF/year

Cryolab Zone + Sc Cable Test Facillity External Cryogenics CompressorBldg. 163: KAESER FS440, bar, 250 kW Bldg. 165: KAESER FS440, bar, 250 kW Cold Box Bldg. 165: SULZER TCF 50, 2.5 g/s Lhe Bldg. 163: SULZER Chemtech, 5.5 g/s Lhe (Dewar boost), T1 filter clocking (10kCHF) 1.9 K Stage: Bldg. 163: 6 Leybols SV300, 280 m3/h, 0.7 mbar, 6 kW Bldg. 165 (FRESCA): ALCATEL pump, 45 kW primary 340L: 2x 400m3/h + roots RHV 3000: 3000 m3/h LN2 precoolerNo Proximity Cryogenics Valve BoxesDistribution VB Dewar6000l Lhe Dewar (FRESCA ) Cryostats7 cable cryostats + FRESCA double cryostat Infrastructure Recovery Compressorbldg. 253: 1 x Greenfield (400 m3/h), 200 bar, 120 kW 1 x Bauer 80 m3/h, 150 bar Purifierbldg. 243: 2 x Linde Purifier, 200 m3/h, bar Balloons/ Gazometersbldg. 253: 2x 10 m3 + 1 x 20 m3 LN2 reservoir42'000 l Control Systembldg. 163: ABB -> UNICOS week 28 (2009) bldg. 165: UNICOS bldg. 243/253 GHe managment: UNICOS V0.8 MW CV Operation FSU210 kCHF/year Maintenance C16975 kCHF/year

Prevessin Site Block 4 Magnet Test Facility North Area - Block 4 Bldg. 895, Prevessin Site External Cryogenics CompressorGHH Rand bar HP/1.55 BP, 426kW Cold BoxSNA, 5-6 g/s LHe 1.9 K Stage:ALCATEL? Warm pump ? ? g/s LN2 precoolerNo Proximity Cryogenics Valve BoxesDistribution VB Dewar2500 l Lhe Dewar Cryostats4? Infrastructure Recovery Compressor Bldg. 895, 100 m3/h, 150 bar, 40 kW Purifier HP (pure/impure) Ghe connection to Cryolab Balloons/ Gazometerslocal balloon 20 m3 + 8 x 80 m3 (EHN1) LN2 reservoir20'000 l Control SystemControl GHH CP in UNICOS Control Cold Box in ABB V0.6 MW CV Operation FSU105 kCHF/year Maintenance C16925 kCHF

Meyrin West Area Former ATLAS Test Facility West Area ATLAS Magnet Test Station Bldg. 180/279, Meyrin Site External Cryogenics Compressor He plant: Sulzer Piston Compressor 165 g/s, 15/1.02 bar, 510 kW Cold BoxSulzer 1.2 LN2 precooling 1st HX possible 1.9 K Stage: LN2 precooler10 kW LN2 (LN2 reservoir missing) STAL compressor S-26, 50 g/s, 18/1 bar, 160kW Proximity Cryogenics Valve BoxesDistribution VB for 3 Test Benches (2 BT, 1 ECT) Dewar CryostatsLHe centrifugal pumps cyostat, 80 g/s, 600 g/s and 1200 g/s dP=300 mbar Infrastructure Recovery CompressorMembrane compressor ? PurifierMP (pure/impure) GHe connection to Cryolab Balloons/ Gazometersballon BEBC (big leak?) LN2 reservoirtaken to ATLAS/P1 Control SystemABB control system V0.7 MW CV Operation FSU105 kCHF/year Maintenance C kCHF/year ( > 6000 h), 25 kCHF (< 6000 h)