ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material 1.1.8.4.53.3.3.143.3.5.6.13.3.5.6.23.3.5.6.33.3.5.6.53.3.8.213.3.10.2.

Slides:



Advertisements
Similar presentations
Federal Energy and Environmental Regulation Agencies and Laws
Advertisements

All you always wanted to know about Assurances Office of Research Protections (ORP) U.S. Army Medical Research and Materiel Command (USAMRMC) Fort Detrick,
Pakistan Nuclear Regulatory Authority
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
Environmental Management Systems An Overview With Practical Applications.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
WHS Management Plans.
Protection Against Occupational Exposure
Federal Energy and Environmental Regulation Agencies and Laws
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Process Safety Management
10 CFR 851 Worker Safety and Health Program Overview.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
Developing an Effective Ethics Program
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
Nuclearsafety.gc.ca Joint Congress on Medical Imaging and Radiation Sciences May 28, 2015 e-Doc CNSC Administrative Monetary Penalties Overview.
Health and Safety Policy
NE 127 – Codes, Standards, and Regulations Power Industry Regulations INSTRUCTOR: Chattanooga State CC.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Doug Stephens Program Manager USW TMC Grant Programs (Mobile) (Office)
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Regulatory Framework for Uranium Production Facilities in the U.S.
Guidance Training CFR §483.75(i) F501 Medical Director.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
1 DRAFT Supervisory Responsibility Responsibilities under the Federal Mine Safety and Health Act of 1977.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
10 CFR 851 Worker Safety and Health Program Bill McArthur, PhD, CIH Director, Office of Worker Safety and Health Policy Office of Health and Safety.
Introduction to Codes, Standards, and Regulations.
Authorization and Inspection of Cyclotron Facilities The Authorization Process.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Federal Energy and Environmental Regulation Agencies and Laws
Prescriptive vs Performance-Based Regulatory Approaches
Health and Safety Policy
Administration of a FIDIC Contract - Project Control
Introduction to the Definition of Solid Waste Final Rule
Global Connections Day Building Safety Service Provider
NRC Cyber Security Regulatory Overview
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
NE 127 – Codes, Standards, and Regulations Power Industry Regulations
Research and Test Reactor Decommissioning Inspections
TRTR Briefing September 2013
Module 5 RASP Regulations.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material

NE 127 – Codes, Standards, and Regulations Key Parts of 10CFR (for the Nuclear Industry) INSTRUCTOR: Chattanooga State CC

NRC Enforcement Policy Specified in 10CFR2: Rules of Practice for Domestic Licensing Procedures and Issuance of Orders 1)Ensures compliance with NRC regulations and licensee conditions 2)Requires prompt correction of licensee weaknesses 3)Provides a deterrent to future non-compliance 4)Encourages improvement of licensee performance – leads to enhanced degree of public health and safety

Significance of Violations Assessed based on the following: 1)Actual safety consequence  Such as actual release of radiation, damage to core, etc. 2)Potential safety consequence  Based on risk factors 3)Impact on the regulatory process  Failure to report or keep accurate and timely records 4)Willfulness  Indicates deliberate intent to violate or falsify

Severity Level of Violations Normally categorized in terms of four levels of severity to show their relative importance or significance Severity Level I – most significant – Levels I and II involve actual or high potential consequences on public health and safety Severity Level IV – least significant

Enforcement Actions The NRC Commission may issue a: – Non-Cited Violation – Notice of Violation – Civil Penalty – Order – Related Administrative Action (such as a Demand for Information)

Non-Cited Violation For issues of very low safety significance Documented as violations in inspection reports to establish public records of the violations Not cited in Notices of Violation which normally require written responses from licensees

Notice of Violation Served by the Commission May require licensee submit a written statement to address all alleged violations including: 1)Reasons for violation, or, if contested, basis for disputing the violation 2)Corrective steps taken by licensee and results achieved 3)Corrective steps which will be taken 4)Date for full compliance Available for viewing on

Civil Penalties Civil penalties may be imposed for up to $140,000 per day for each violation Actual fee based on severity level of violation If a violation is on-going, each day of the violation constitutes a separate violation

Order Proceeding to modify, suspend, or revoke a license Indicates alleged violations or potentially hazardous conditions and specifies proposed action Requires written response to the order under oath or affirmation Informs licensee of right to demand a hearing on all or part of the order Specifies the issues for the hearing State the effective date of the order – may be immediately effective if public health or safety of concern Llicensee must admit or deny each allegation

Demand for Information Issued by Commission to determine if an order should be issued Licensee must reply in writing

Key Parts of 10CFR 10CFR2 10CFR19 10CFR20 10CFR21 10CFR26 10CFR50 10CFR50, Appendix A 10CFR50, Appendix B 10CFR51 10CFR55 10CFR73 10CFR100

Key Parts of 10CFR 10CFR2 - Rules Of Practice For Domestic Licensing Proceedings And Issuance Of Orders – Deals with proceeding relating to all aspects of licensing issues, and the enforcement of licensing agreements 10CFR19 - Notices, Instructions And Reports To Workers: Inspection And Investigations 10CFR20 - Standards For Protection Against Radiation – Controls the receipt, possession, use, transfer, and disposal of licensed material

Key Parts of 10CFR 10CFR21 - Reporting Of Defects And Noncompliance – Requires responsible officer of a nuclear faciity to immediately notify the Commission of any: Failure to comply with laws relating to substantial safety hazards Defects which could create a substantial safety hazard 10CFR26 - Fitness For Duty Programs 10CFR50 - Domestic Licensing Of Production And Utilization Facilities – Requirements for obtaining an operating license or construction permit

Key Parts of 10CFR 10CFR50, Appendix A - General Design Criteria For Nuclear Power Plants – Establishes necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety 10CFR50, Appendix B - Quality Assurance Criteria For Nuclear Power Plants And Fuel Reprocessing Plants – Q/A requirements for the design, construction, and operation of all structures, systems, and components included in a production or utilization facility – More details: student reports on criterion I - XVIII

Key Parts of 10CFR 10CFR51 - Environmental Protection Regulations For Domestic Licensing And Related Regulatory Functions 10CFR55 - Operators' Licenses – Deals with the issuance and renewal of licenses for operators and senior operators at nuclear facilities 10CFR73 - Physical Protection Of Plants And Materials – In other words, security 10CFR100 - Reactor Site Criteria – Based on population zones, seismic activity, etc.

Existing U.S. Nuclear Reactors (104)

Proposed New U.S. Nuclear Reactors (28)

Quality Assurance for Nuclear Reactors Quality assurance (QA) comprises all planned and systematic actions that are necessary to provide adequate confidence that a structure, system, or component will perform satisfactorily in service Attributes of a QA program include procedures, recordkeeping, inspections, corrective actions, and audits

NRC Review of QA Programs NRC reviews and inspects QA programs and their implementation NRC's objective is to determine whether licensees and their contractors are meeting the agency's requirements In particular, the NRC reviews the QA programs for commercial nuclear power plants In addition, for operating nuclear power plants, the NRC reviews any changes that reduce previous commitments to the plant’s QA program

NRC Regulatory Guides Detail acceptable methods of design, fabrication, construction, operation, and quality assurance Regulations are mandatory Regulatory Guides and NUREGs mandatory only as committed to by the applicant (as stipulated in the construction permit or operating license) Regulatory Guides s et forth requirements for submitting environmental reports, safety analysis reports, etc.  PSAR – Preliminary Safety Analysis Report (for construction permits)  FSAR – Final Safety Analysis Report (for operating licenses)  Regulatory Guide 1.70 describes the type of information to be submitted by the applicant for PSARs and FSARs

NUREGs What is a NUREG? – Technical reports relative to the regulation of nuclear energy NUREG Standard Review Plan For The Review Of Safety Analysis Reports For Nuclear Power Plants: LWR Edition – Describes what the NRC expects to see in the SAR, including the applicable acceptance criteria – Useful for auditors for identification of specific regulations and guideline documents that address each topic of a SAR NUREG Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power – References the ASME codes

Institute of Nuclear Power Operations (INPO) Established in 1979 following the Three Mile Island incident Its mission is to “promote the highest levels of safety and reliability – to promote excellence – in the operation of commercial nuclear power plants” by: – Establishing performance objectives, criteria and guidelines for the nuclear power industry – Conducting regular detailed evaluations of nuclear power plants – Providing assistance to help nuclear power plants continually improve their performance

INPO Continued INPO provides: – Plant evaluations – Training and accreditation (ACADs) – Events analysis and information exchange – Assistance Not to be confused with: – NEI (Nuclear Energy Institute) – lobbyist group for nuclear energy industry – NUCP (National Uniform Curriculum Program) – program sponsored by NEI to provide a national certificate of accreditation for QA/QC program

NRC Technical Training Center Located in Chattanooga (off Marlin Road near the airport NRC TTC Administration Offices are located on the second floor of a 6-story all glass exterior office building Simulators are located on the first, second, third, and fourth floors

Next Time… ASME Boiler and Pressure Vessel Code