RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Prototyping and study of Glass Spark Chamber detectors B.Satyanarayana TIFR, Mumbai.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Gas Avalanche (%) Streamer (%) Maximum (%) Volume (L) Density (g/L) Weight (Kg) R134a , Isobutane , SF.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Characterization And Testing Of 2m X 2m Glass Resistive Plate Chamber Mohammed Salim M Aligarh Muslim University.
Results from development of Glass RPCs for INO detector
Development and study of Glass Resistive Plate Chambers Satyanarayana Bheesette Roll number: Supervisors Prof Raghava Varma, IIT Bombay Prof Naba.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
QUPID Readout and Application in Future Noble Liquid Detectors Kevin Lung, UCLA TIPP 2011 June 11, 2011.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
On aging problem of glass Resistive Plate Chambers India-based Neutrino Observatory (INO) collaboration JIGSAW.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
ICAL electronics and DAQ schemes - 1 B.Satyanarayana, TIFR, Mumbai For INO Collaboration.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007.
The RPC Closed loop Gas System Slides from Bianco and Guida.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
India CERN Meeting, BARC, 28/02/11
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
C.Gustavino, may 19-23, The Trigger walls of the test LNGS The gas system of the trigger wall is ready only since the last week (delay.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
CDMS II Shielding To Installation To Construction From Design.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Status of Grid & RPC-Tests Stand DAQ(PU) Sumit Saluja Programmer EHEP Group Deptt. of Physics Panjab University Chandigarh.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
IEEE Real Time 091 Data Acquisition System for Multi-channel Gas Detector Hongyu ZHANG, Kejun ZHU, Haitao ZHU Institute of High Energy Physics,
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, Development of RPCs for INO B.Satyanarayana TIFR,
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
LKr status R. Fantechi.
INO TRIDAS presentations
Pierluigi Paolucci - I.N.F.N. Naples
Study of timing properties of single gap high-resistive bakelite RPC
A Beam telescope for the EMC testbeam
Presentation transcript:

RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011

RPC LAB SETUP  RPC Lab became operational in December 2010  Two bay space and fully Air conditioned, Air Curtained  Room temperature and humidity sensors  Data Acquisition System with NIM/CAMAC Modules  Cosmic ray test stand (*New Almost Ready 2mx1.6m)  4-Channel gas mixing system  Freon, Iso-butane, Argon Gas Cylinders  Air Compressor (DST-RPC Research Project)  SY-2527 Universal Multichannel Power Supply  Positive High Voltage Module  Negative High Voltage Module

Assembly Table of Scintillator Paddles

DAQ, Cosmic Stand & Gas Mixing Unit

Cosmic Stand( 2mx1.6m) For testing of 5 assembled RPCs

High Voltage Supply Unit

Present DAQ Status  Procured new Universal Multichannel Power Supply (SY-2527) from CAEN which is integrated to our DAQ system.  A new Ethernet based CAMAC controller is integrated in to the DAQ and made operational. (Sumit’s Talk)  Constantly check for signal formation in Avalanche and Streamer mode as a cross-check for the complete system (prototype glass RPCs)  We are establishing the facility for fabricating prototype Bakelite RPCs (procured raw material) Continued…….

Prototype Glass RPC (from TIFR)

Stability Monitoring of Telescope Paddles Continued…….

Continued……..

VI Characteristics of Test RPC

VI Characteristics of 30X30 Cm Glass RPC

Ongoing Updates  VME Crate with modules (ADC/TDC/Scaler) order placed  Gas cylinders are doubled  Nitrogen is also procured for pressure/leak tests  Can also be used for flushing of RPCs for moisture control  New RPC storage area would be available in 2 wks (civil work over, cabling etc), 400sq. Ft.  As per the new RPC group’s guidelines, may need to double TDC and the power supply!  For testing 5 RPCs in a stack with all read out channels  Will be running the system integration tests with the bakelite RPCs soon.  VME software work will start once VME arrives (with the help from CMS)