Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

First pass study 3 scenarios of possible locations of PSA storage cabinets in the CUORE hut Prepared for
Your universal enclosure. 159 LC  159 Cubic inches of space with a hinged lid  Made from all galvanized steel, powder coated white, with a rubber.
DISTINCTIVE DIFFERENCES Rousseau vs. ____________.
The Swagelok® SK series and AFS Multipurpose Ball Valves
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
|0 THE SKINNER COMPANY PRODUCT REVIEW
Introduction to B-tek “Digital” load cell Shows complete assembly as in the “Centurion” Truck Scale. Shows complete assembly as in the “Centurion” Truck.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
SLAC workshop 7-10 July 2009 WP1: microwave-based accelerators Progress towards a new standard X-band high-power flange G. Riddone, (contribution.
Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.
CUORE Clean Room Robin Lafever LBNL LNGS 9/18/2015Robin Lafever LBNL, LNGS1.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
INTER-LAKES BASES PRODUCTS. MODEL B-75 MACHINE BASE B-75 Model with panels and doors.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
ID 1.75 Material list: aluminum ¼ X ¾ X 6 in flat bar ¾ X 6 in round stock 1 X 6 in round stock 2 ea 5/16 heli-coil Weld 1” joints.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
Mechanical Designs of The Central Detector Jinyu Fu
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Kronlab Glass Columns high quality glass columns
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
PSA Layout studies-2 6/12/2016Robin Lafever LBNL1 In mid April 2008, a series of studies was conducted to attempt to accommodate the desire to place the.
WALK-IN COOLERS & FREEZERS All contents of this presentation © Master-Bilt Products a division of Standex International, Inc.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
SPS High Energy LSS5 Thermal contact & cooling aspects
TYPE 4X STAINLESS STEEL SCREW COVER PULL-BOX AND TROUGH Launch Presentation TECHNICAL SOLUTIONS.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Marine Kit - 1 Shipyard Operations
PANDA Yoke of the Magnet
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
MKTG 2016.
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Design of Distribution Feedbox at LHC P7
Application Operation principle Advantages Highlights Comparison
THE SKINNER COMPANY Product Review
Material Joining and Beam Bending
Circor Synergies Quality Valve Products Excellent Design Engineering
MKTG 2016.
XFEL Collimation and Beam Switchyard Vacuum Issues
ESS Concrete Pit Lids.
LARP Phase II Secondary Collimator RC-0 and RC-1
Additional Upstream Coil Shielding
ISO view of pipe w/ individual EC detector installed
Bunker Wall Design Wall
Challenges and Deadlines for Production
Bunker Wall Design Wall ESS
Presentation transcript:

Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE Radon barrier / Clean room assembly. Final design details will be customized to accomodate specific door seal cross- sections For Carlo BucciLNGS Paolo GorlaLNGS Richard KadelLBNL

10/10/2015Robin Lafever LBNL2 CUORE Door seal test set-up Pressure Seal configuration CLOSURE DETAIL CUORE Door seal test set-up Pressure Seal configuration CLOSURE DETAIL Comments: At the moment, there seems to be no special need for N2 ports in any of the test boxes. If such a need arises, they should be easy to retrofit. Note newer smaller boxes. Some details have been changed from the original concept, based on discussions with Leo Tatananni at the LNGS machine shop. He suggests 5mm Stainless Steel for the box construction, with all joints TIG welded. I concur. Details shown are generic and I encourage using local suppliers where possible, and will gladly modify design details if necessary to accommodate off-the-shelf solutions. Final details will be designed around specific seal cross-sections, Yet to be selected. Next steps might be to forward these concepts to Ezio Previtali and the Milano(?) Group for comments about the feasibility and proceedure for doing a suite of tests to proof Radon resistance of selected configurations and materials.

Robin Lafever LBNL3 CUORE Door seal test set-up GENERIC BOX Material preferences All 10mm thick Aluminum -welded or Steel -welded or Acrylic (plexiglas) –solvent welded 10/10/2015

CUORE Door seal test set-up DeStaCo Clamp Doubler plate to allow blind-tapped holes for mounting screws Test Gasket specimen Top shown removed 10/10/20154Robin Lafever LBNL

5 CUORE Door seal test set-up Top shown installed 10/10/2015

Robin Lafever LBNL6 CUORE Door seal test set-up REDUCED VOLUME Material: 5mm thick SS All joints TIG Welded

10/10/2015Robin Lafever LBNL7 CUORE Door seal test set-up Pressure Seal configuration

10/10/2015Robin Lafever LBNL8 CUORE Door seal test set-up Pressure Seal configuration Material: 5mm thick SS All joints TIG Welded

10/10/2015Robin Lafever LBNL9 CUORE Door seal test set-up Pressure Seal configuration CLOSURE DETAIL

10/10/2015Robin Lafever LBNL10 CUORE Door seal test set-up Pressure Seal configuration CLOSURE DETAIL