Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.

Slides:



Advertisements
Similar presentations
Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.
Advertisements

Coal Seam Gas VPELA Forum 16 April 2013 Pierre Andipatin Earth Resources Development Division.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Environmental Assessment in Nova Scotia
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Mexico's Energy Reform and the Potential Impact on Texas' Transportation System Jolanda Prozzi November 18, 2014.
Australian Government Emissions Reduction Fund. Central component of the Government's Direct Action Plan Funding of $2.55 billion Additional funding to.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Gas Utilities and Conservation – the Policy Context for: Teaching Energy Efficiency at the University Level York University July 16, 2014.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
USAID Africa Bureau EIA Procedures for Sub-Projects
BMT Cordah Limited 1 Offshore Wind Energy Strategic Environmental Assessment (SEA) Phase 1 “Progress and Lessons” Mark Jennison and Trevor Baker BMT Cordah.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Demystifying the Process: Influencing Social and Economic Decision Making In Oil and Gas Development Pandora Snethkamp, Ph.D Houston, TX 77006
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Goldboro LNG Eastern Canada’s LNG Export Mar
Presented to: By: Date: Federal Aviation Administration Environmental Requirements For Extraction of Gas & Oil on Airport Property 35 th Annual Airports.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Consultant: CMDC Joint Venture Key principles and effectiveness of EIA.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
WESTAR CONFERENCE October 22, 2008 Bob Randall Colorado Department of Natural Resources.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Current state of regulation of shale gas regulation in the UK Dr Sanna 12 March
Vent Gas Mitigation PTAC Environmental Forum January 30, 2002 Bruce Peachey, P.Eng. New Paradigm Engineering Ltd., Edmonton.
Lynne Welsh Massachusetts Department of Environmental Protection.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
UNSM Spring Workshop, Yarmouth, Nova Scotia Some More Facts about Hydraulic Fracturing May 9, 2013 Andrew Blackmer, M.Sc., P.Geo, Dillon Consulting Ltd.
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Fundy Engineering and Consulting Ltd: Our Natural Gas Experience Presented by Tim Ryan, M.Eng., P.Eng.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Municipal Class Environmental Assessment
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Phase 2 Hope Bay Belt Project
Utilities Department Wedgefield Water November 28, 2017.
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Environmental Impact Assessment (EIA) in New Brunswick
Environmental Assessment and Licensing (EAL) in Manitoba
Environmental Impact Assessments
Presentation transcript:

Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011

EIA - Background Regulatory Authority: NB Environmental Impact Assessment Regulation (87- 83) – Clean Environment Act. If a project is of a type that is listed in Schedule “A” of the EIA Regulation, then it must be registered with Environment. For onshore oil and gas, potential EIA triggers include: - (f) all commercial extraction or processing of combustible energy yielding materials; - (h) all pipelines exceeding 5 km in length, except: water, steam or domestic wastewater pipelines; pipelines or pipe lines that are the subject of an application under the Gas Distribution Act or the Pipe Line Act; - (m) all waste disposal facilities or systems; - (r) all projects involving the transfer of water between drainage basins; -(s) all waterworks with a capacity greater than fifty cubic metres of water daily; -Other triggers include wetlands > 2 ha, unique/rare/endangered species, etc.)

Phased EIA - Approach EIA review will begin much earlier, but allow certain types of development work to be undertaken during the review process. A determination (or approval) would still be required for a project prior to the commercial extraction phase. Reduced delays for project proponents, as the review will have been ongoing concurrent with the pre- commercial phase/ideally consistent TRC involved throughout the review. ENV has applied similar approach to water exploration projects since approx 2002 (e.g., municipal drinking water projects; WSSA). 9

Overview of Phased Approach Pre-Registration Phase (Exploration Phase) ground penetrating radar seismic tests test pits temporary access roads Registration Review Phase well pad construction test well drilling hydraulic fracturing assessment/monitoring EIA review is concurrent with pre-commercial development Determination Phase (Following EIA Decision) pipeline construction Processing plant construction / commercial extraction and operation test well drilling continues Minister’s decision on large area of province 10

Overview of Phased Approach Step 1 – EIA Registration The project is registered with DENV at the exploratory phase with reduced information requirements. This registration must describe: 1.the location of the proposed drill target area(s); 2.the existing environment within the drill target area(s) including any environmental constraints; 3. the proposed exploration activities including how the proponent attempted to avoid any environmental constraints. Details related to water, wastewater and pipelines can be deferred.

Overview of Phased Approach Step 1 - continued Project Review: The proposed exploratory work is reviewed by a Technical Review Committee (TRC) tailored to Phase 1 of the project. This review would be largely focused on siting and the potential environmental affects associated with exploration activities. This review is coordinated by a DENV Project Manager who would serve as a single point of contact for the proponent/TRC. A landowner approval must be in place. Commencement of public consultation and stakeholder engagement. Within approximately 30 days DENV issues letter indicating that drilling and testing can proceed according to conditions. END OF STEP 1

Overview of Phased Approach – Step 2 Construction of well pads is undertaken and exploratory wells are constructed and tested. Public consultation and stakeholder engagement is on-going and the results submitted to DENV for review prior to the Minister’s decision. For only those wells deemed viable by the proponent, information on the required infrastructure (e.g. pipelines, etc.) is submitted for review by the TRC. Minister’s Decision – Construction of project related infrastructure (pipelines, etc.) may be undertaken as per the conditions imposed in the Minister’s Decision. The Minister’s Decision would include conditions related to future phases of the project.

Benefits of Phased Approach –Exploratory work can still be undertaken prior to a Ministerial Decision on the entire project. –Single point of contact for the proponent and stakeholders – with DENV and DNR as key TRC members. –Single EIA registration vs. the multiple registrations currently required. Additional sites or future phases can be added to the original project as desired thereby saving proponents up to $5000 per well pad. –Proponents have the freedom to explore throughout the study area based on avoidance of environmental constraints. –Details related to water supply and wastewater requirements can be finalized while exploratory drilling is undertaken. –The proponent would submit information on the required infrastructure (e.g. pipelines, processing plant) when they opt to develop commercially.

Other Considerations Phased approach requires oil and gas companies to enter the EIA regulatory process earlier than is currently the case. Provides a consistent, credible environmental regulatory review process. Will help to improve consideration of cumulative environmental impacts. 12

Other Considerations Important to meet 30 day turn around for TRC iterations. Identification of requirements, preferable to questions (Siting; mitigation; conditions; monitoring) - prescriptive. Ideally as projects are reviewed under the phased EIA process, standards will be developed collaboratively by the TRC. 12

EIA - EIA Methodology: Assessment of Project Activities on VECs Issues Scoping (ECCs…VECs) Mitigation Residual Impact Rating Environmental Management & Follow-Up Project DescriptionExisting Environmental Information Public InputOther Stakeholder Input

Questions?