Lecture4 : Project planning Lecturer: Kawther Abas 447CS – Management of Programming Projects.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Software Engineering COMP 201
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
SWE Introduction to Software Engineering
Lecturer: Sebastian Coope Ashton Building, Room G.18 COMP 201 web-page: Project.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 COMP201 Project Management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management “…a huge topic.” See Part 6, “Management”, Chaps.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
7M701 1 Software Engineering Project Management Sommerville, Ian (2001) Software Engineering, 6 th edition Ch. 4
Creator: ACSession No: 10 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringDecember 2005 Project Management CSE300 Advanced Software Engineering.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects l.
Project Management Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Software Engineering Principles Chapter 3 From Software Engineering by I. Sommerville, Slide 1 project managementorganizing planning scheduling Learning.
Chapter 3 Project Management
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2006Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
 Probably the most time-consuming project management activity.  Continuous activity - Plans must be regularly revised.  Various different types of.
Project management DeSiaMore 1.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Software Project Management
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Chapter 23 – Project scheduling Lecture 1. Project scheduling  Project scheduling is the process of deciding how the work in a project will be organized.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
CSEM01 - wk8 - Software Planning1 Software Planning CSEM01 SE Evolution & Management Anne Comer Helen Edwards.
Project management.  To explain the main tasks undertaken by project managers  To introduce software project management and to describe its distinctive.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COOP Seminar – Fall 2008 Slide 1 HOUSTON COMMUNITY COLLEGE SYSTEM SAIGONTECH SAIGON INSTITUTE OF TECHNOLOGY Software Project Management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Software Engineering, 8th edition. Chapter 5 1 Courtesy: ©Ian Sommerville 2006 Oct 13 th, 2008 Lecture # 6 Project management.
Parts of this presentation is extracted from Ian Sommerville’s slides located at
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
CSC480 Software Engineering Lecture 5 September 9, 2002.
Dr Izzat M Alsmadi Edited from ©Ian Sommerville & others Software Engineering, Chapter 3 Slide 1 Project management (Chapter 5 from the textbook)
Chap 4. Project Management - Organising, planning and scheduling
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Slide 1 CS 310 Ch5: Project management What do you think is involved? Proposal writing Project costing Project planning and scheduling Project monitoring.
Project management (2) By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
1 Project management Organising, planning and scheduling software projects.
Project management Chapter 5. Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe.
HNDIT23082 Lecture 10:Software Project Management
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COMP201 Project Management.
Assistant Professor of Computer Science Washington State University
Software Project Management
Project management.
Software Project Management
Project management Lecture 9
Presentation transcript:

Lecture4 : Project planning Lecturer: Kawther Abas 447CS – Management of Programming Projects

Software project management – The art of getting work done through other people Project management is needed because software development is always subject to budget and schedule constraints that are set by the organisation developing the software

Management activities 1.Proposal writing Project planning and scheduling Project costing Project monitoring and reviews Personnel selection and evaluation Report writing and presentations

Project planning 1.A plan, drawn up at the start of the project, should be used as the driver for the project 2.The initial plan should be the best possible plan given the available information.

The project plan The project plan sets out: 1.The resources available to the project 2.The work breakdown 3.A schedule for the work

Project plan structure 1.Introduction Project organisation Risk analysis Hardware and software resource requirements Work breakdown Project schedule Monitoring and reporting mechanisms

Activity organization 1.Activities in a project should be organised to produce tangible outputs for management to judge progress Deliverables are project results delivered to customers The waterfall process allows for the straightforward.

Project scheduling 1.Split project into tasks and estimate time and resources required to complete each task 2.Organize tasks concurrently to make optimal use of workforce 3.Minimize task dependencies to avoid delays caused by one task waiting for another to complete 4.Important to note that the schedule evolves over time.

Scheduling problems Estimating the difficulty of problems and hence the cost of developing a solution is hard

Bar charts and activity networks Graphical notations used to illustrate the project schedule Show project breakdown into tasks. Tasks should not be too small. They should take about a week or two Activity charts show task dependencies and the critical path Activity Bar charts show schedule against calendar time

Activity network What if T8 is delayed by 14 days?

Activity bar chart (Gantt chart) “slack” time one week, 5 business/working days

Staff allocation

Project Scope  Defined (authorized), risk adjusted, scheduled and planned work of the project.  Project plan is founded on a mature project scope statement.  Project scope statement is founded on detailed solution architecture (SA).  Solutions architecture is found on mature enterprise architecture (EA).  Project scope is the product of the iterative scope management processes that is generally done by the project team, using a WBS.  Using the WBS, the team to capture and then decompose all of the work of the project, project scope.

Cost Management Plan Cost Management Plan: Cost management addresses the cost of the resources needed to complete project activities. Management Processes, includes 1) cost estimating, 2) cost budgeting, and 3) cost control.

Quality Management Plan Quality Management Plan: Quality management addresses the assurance that the defined product characteristics meet the stakeholders’ Management Processes, includes 1)quality planning, 2) quality assurance, 3) quality control.

Risk Management Plan Risk Management Plan: addresses how risks are systematically identified analyzed and responded to throughout the project. Management Processes, include 1) risk management planning, 2) risk identification, 3) qualitative risk analysis, 4) quantitative risk analysis, 5) risk response planning, and 6) risk monitoring and control.