Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.

Slides:



Advertisements
Similar presentations
Reference Manager Making your life easier! Updated September 2007.
Advertisements

Step-by-Step Demonstration: Run Chart Tools (Excel Templates) 1.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
Lecture Roger Sutton 14: Data Management Facilities 1.
Progress of ILC cavity gradient database and yield C.M. Ginsburg On behalf of the ILC Database Group Baseline Assessment Workshop, Tsukuba/WebEx September.
Before I stated the database I had to save it into My Documents> ICT> You can do it> D201EPORTFOLIO> Evidence For the field group food item, I set the.
Advanced Excel for Finance Professionals A self study material from South Asian Management Technologies Foundation.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group: C.Sylvester, Y.Huang, R.Nehring, J.Ozelis, T.Peterson, V.Poloubotko, R.Rabehl, I.Rakhno,
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity performance vertical test → horizontal test → CM test C.M. Ginsburg On behalf of the ILC Database Group with special thanks to Detlef Reschke, Lutz.
Frank Lehner U Zurich Proposal to use the Atlas SCT database for Run IIb  Why to switch now? u existing database (db) at UIC incomplete and unlikely to.
Microsoft Project 2010 ® Tutorial 6: Sharing Project Information with Other People & Applications.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
The Initiative For School Empowerment and Excellence (i.4.see) “Empowering teachers, administrators, policy makers, and parents to increase student achievement.”
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
240-Current Research Easily Extensible Systems, Octave, Input Formats, SOA.
SCRF Monthly WebEx Meeting Agenda 1. Report from PMs (15 min.) 2. Report from GLs (10 min.) 1. Progress Reports and Discussions: TOPIX (each.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Using EBSCOhost databases Access via MyAthens Click on the EBSCOhost link.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
September 2012 Developed by Agricultural and Biological Engineering Department at Purdue University and Department of Regional Infrastructures Engineering.
Excel 2007 Part (3) Dr. Susan Al Naqshbandi
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
Cavity Database Status J. Kerby with thanks to the Cavity Database Team MLSCRF Webex 9 Dec 2009.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) June 24, 2009.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Beijing ILC Workshop Global Design Effort 1 The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Computing Honours Project (COMP10034) Week 10 Seminar/Q&A Session.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
EURISOL, PSI, June 2006E.Wildner, CERN1 Data Bases for Parameter Lists N. Emelianenko, CERN AT-MAS E. Wildner, CERN AT-MAS Presentation is based on a presentation.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Should you use the Microsoft Project CA PPM Connector
Working in Groups in Canvas
for the FNAL/ANL, JLab, and Cornell cavity teams
Single Sample Registration
Unit 16 – Database Systems
Production Cavities in progress
BAW Prep S1 Global Status Pilot Plant Status
2. SCRF General Preparation for the AD&I Preparation for AAP Review
HCHB 2016.T2 Release August 23, 2016.
WG3: Main Linac SCRF(cavity,cryomodule)
Retreatment of Superconducting Cavities for the European XFEL
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
WFD Article 8 Schemas Yvonne Gordon-Walker.
Lesson 23 Getting Started with Access Essentials
Springshare’s LibInsight: E-Journals/Databases Dataset
Software for Engineers
Manufacture Part Search Template Overview
Presentation transcript:

Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with updates)

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg2 People Zack Conway (Cornell University) Sebastian Aderhold (DESY) Rongli Geng (JLab) Kirk (Yasuchika) Yamamoto (KEK) CMG (Fermilab) Thanks to all of the Lab management groups for agreeing to provide resources and assist with this effort

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg3 Task: Get the data, make the plots Put world data into a common “database” for inclusion in global data analysis Rules: –All 9-cell cavities, all RF tests are to be included –The starting point for inclusion is "the vendor says this cavity is built according to the buyer's specification." –Lab responsibility: Assign person in-charge Submit data periodically Mark the data as included or excluded (e.g., in case of system failure) from global analysis Make the data available to all via a web interface Make plots which anyone could reproduce, given the stated cuts on the data

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg4 Implementation: Current Status Database Status –For now, this is an Excel spreadsheet –Fermilab-TD is willing and able to make a web interface from the spreadsheet showing some standard (TBD) plots; future cavity data would be entered via electronic travelers –It would be ideal if all Labs could use a real database, such as the DESY database, to store all the data together – longer term KEK-baseline group did it! Is it possible for all Labs to agree to do this? I would like to work with DESY database colleagues, if DESY can contribute additionally to this effort –What tools are required? –What changes are permitted (e.g., diff process techniques) –What info must be added (e.g., flag for ILC analysis inclusion)? –What web interfaces might be set up? Plots don’t exist yet: guess ~5 real plots, ~5 checking plots

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg5 Implementation: Initial Data Spreadsheet Two types of info: (1)Cavity based (2)Process/test based Spreadsheet status TBD if DESY DB becomes a viable option

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg6 A word about Fermilab data and databases Elvin Harms heads Fermilab database development –Elvin and Dieter Gall ported some 3.9-GHz Fermilab vertical RF test data into DESY database All GHz cavities in the string now at DESY (2(TTC)+2(later)) Not all of the tests, not all of the recorded data Developed a program to re-arrange text from test data file, plus manually removed faulty data points Dieter Gall uploaded the specially formatted data into database Data on the remaining cavities to follow –Full database at Fermilab is in (slow) progress; data are currently distributed around the test stands So it may be possible, also for Fermilab, with DESY assistance, to put 1.3-GHz 9-cells test data into DESY database… What about JLab, Cornell?

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg7 Example first plot: Production yield Vertical axis: fraction of cavities satisfying criteria –Denominator (logical and of the following): Qualified vendor Delivered to lab within last 2-3 years –Numerator (logical and of the following): Denominator Accepted by the lab after incoming inspection 1 st successful RF test, excluding any test with system failure, has max gradient > (horizontal axis bin) MV/m; ignore Q-disease, field emission Horizontal axis: max gradient MV/m Exclude cavities which are work-in-progress, i.e., before rejection or 1 st successful RF test

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg8 Example first plot: Production yield

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg9 Schedule/Plan FALC meeting July 13, 2009 –Provide an example plot of production yield (pp.7-8), citing caveats Using preliminary and incomplete data for past 2-3 years from the simple Excel spreadsheet format, no web interface –Provide the people list (p.2), and the plan (below, with updates) End July 2009: Determine whether DESY DB is viable option, and timescale for implementation ALCPG/GDE Sept Oct. 2, 2009 –Dataset is web-based (support by Fermilab-TD or DESY) –Some well-checked, easily explainable, and near-final plots available for discussion such as Production yield –Qualified vendors –All vendors Process yield Time evolution of some quantities End Nov. 2009: With colleagues’ input, finalize DB tool, web interface, standard plots, possibly with longer-term tool improvement plans

Fermilab 10.July 2009C.M. Ginsburg DESY ILC mtg10 DESY DB Update Discussions 9.July with Dieter Gall and Bernd Peterson Uploading spreadsheet as it currently exists, or with minor updates, to DESY DB may be straightforward, and not too much work Vladimir Gubarev could write an interface to do the uploading If ILC requirements become more substantial, e.g., whole Q vs. E curves should be uploaded, a new agreement should be made If DESY agrees, I would present this proposal to the ILC colleagues and Lab representatives to seek their agreement Upon agreement, discuss details and schedule for implementation with Dieter Gall and Vladimir Gubarev –preliminary version of functional tools needed by end of September