Transmission Expansion Kansas Wind and Renewable Energy Conference Topeka, KS September 23, 2008.

Slides:



Advertisements
Similar presentations
Westar Energy Transmission Operations: An Update on Regional and Local Transmission Activity June 22, 2010 Presented to Attendees of Westars Transmission.
Advertisements

10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
APPA CEO Roundtable Phoenix, AZ March 15, 2011
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
The Midwest ISO from a Transmission Owner Perspective.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Grants 3.0 Departmental Administrator Review January 22, 2014.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
EE 369 POWER SYSTEM ANALYSIS
PP Test Review Sections 6-1 to 6-6
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
VOORBLAD.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
TRANSFERS FROM BP: FOR WHAT TIME PERIOD? June 28, 2011 Mike Proctor.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
SPP.org 1. Draft Business as Usual Plan SPP.org 3 Wind - Business as Usual.
SPP.org 1. Economic Portfolio Update – CAWG Meeting – AEP Offices, Dallas August 27, 2008.
Queue Reform at the Midwest ISO NARUC February, 2008.
The Transmission Imperative November 3, 2011 Jay Caspary.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Updated 1/28/2011.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
EI-WECC Seams Study Needed
Presentation transcript:

Transmission Expansion Kansas Wind and Renewable Energy Conference Topeka, KS September 23, 2008

3 Overview SPP Background SPP Transmission Expansion Plan 2008 EHV Overlay Study Joint Coordinated System Plan Cost Allocations in SPP

4 SPP System: 230 kV and above

5 Transmission Expansion

6 Quote from MISO RECB Order Issued July 23, 2007 We need a true nationwide transmission version of our interstate highway system; a grid of extra-high voltage backbone transmission lines reaching out to remote resources and overlaying, reinforcing, and tying together the existing grid in each interconnection to an extent never before seen.... Indeed I would tend to assume that a large multi-state 500 or 765 kV transmission line would not have much difficulty showing net benefits over a very broad region... Suedeen Kelly, FERC Commissioner

7 STEP What Is It?

8 SPP Transmission Expansion Plan SPP Transmission Expansion Plan (STEP) Everything pertaining to transmission development 1.Generation Interconnection Upgrades 2.Transmission Service Upgrades 3.Reliability Standards Upgrades 4.Economic / Sponsored Upgrades 5.Planned Upgrades 6.EHV Overlay / JCSP +

9

10

11

12 SPP Generation Interconnections (KS) SPP Wind Farm statistics based on nameplate capacities (KS data) 1,800 MWs in-service (350 MW) 2,100 MWs under construction (1,405 MW) 1,600 MWs with signed IAs on suspension (549 MW) 4,800 MWs with IAs pending/Facility Studies (1,555 MW) 6,300 MWs with Impact/Feasibility Studies in process (2,953 MW) Almost 32,000 MW with Feasibility Studies requested (7,702 MW) Explosion of Generation Interconnection Requests 161 active requests (14,639 MW of Wind in KS) Significantly more wind than SPP peak demand Generation Queuing Task Force (GQTF) Limit queue ID project milestones Possible GI clustering Target MOPC/BOD October meetings for recommendations

13 Transmission Service Issues FERC 890 compliance. 3 rd party impacts, seams issues are problematic. Aggregate Study Improvement Task Force (ASITF) recommendations approved by MOPC in April to expedite and improve the Aggregate Study process. Proposing to pair AG studies to allow SPP to catch up in processing past and future requests.

14 Reliability Standards Planning NERC Reliability Standards match SPP Criteria. Projects needed for reliability are base plan funded with revenue requirement cost allocations of 33% to all loads and 67% to project benefactors as measured by MW-MI impacts. Some members have stricter standards for load pockets. Projects to meet higher standards for TOs are eligible for zonal cost recovery. Appropriate definition of reliability is being discussed to consider probabilistic metrics

15 Economic Planning Reliability and Economics are Inseparable Economic Upgrades – sponsored under existing tariff but eligible for credits based on new service sold Balanced Portfolio Postage stamp cost allocations for a portfolio of Economic Upgrades which benefit SPP as a whole, and for which each zone realizes benefits in excess of their costs Tariff language has been approved and filed at FERC Balanced Portfolio in final stages of development

16 Portfolio 3

17 Portfolio 3-A Iatan Nashua Seminole Muskogee El Dorado Longwood Chesapeake Tolk Reno Co Spearville Wichita Cleveland Sooner Anadarko XF Swissvale – Stilwel Tap Summit Knoll Axtell Potter Substation Upgrade New Transmission Circuit

18 Portfolio 3-B Iatan Nashua El Dorado Longwood Chesapeake Reno Co Spearville Wichita Cleveland Sooner Anadarko XF Swissvale – Stilwel Tap Summit Knoll Axtell Seminole Muskogee Substation Upgrade New Transmission Circuit

19 Adjusted Production Cost Results Results shown for both 345 kV and 765 kV construction (with 345 kV operation) 765 kV includes Spearville – Knoll 765 kV Seminole – Muskogee 765 kV Wind modeled at 2,600 MW (year end, 2008 levels) 2012

20 Portfolio Balance 1.0 = Balanced

21 Next Steps on Balanced Portfolio CAWG meeting tomorrow in Dallas SPP Staff recommends that Portfolio 3 and 3-A be used for future analysis Future (2017, 2023) analyses Scenarios 1.Higher Wind 2.Carbon Regulation Impact on reliability plan (negative and positive) Leading portfolio moved forward to construction

STEP SPP Transmission Expansion Plan (STEP) approved by BOD in January 2008 $2.2 B of transmission projects over 10 year horizon with almost $800M of transmission projects requiring financial commitments in and $465M of major economic upgrades primarily in KS (costed at 345 kV)

23

24 Updated EHV Overlay Study Quanta Technology Report posted at D=27 D=27 Analysis of Alternative 5 from original study does not support continued grid build out at 345 kV, but demonstrates that 765 kV solution is appropriate when wind penetration exceeds 4,600 MW Soliciting input from stakeholders on results to date, issues, concerns at

25 New Wind in Updated EHV Overlay Study Kansas6,600 MW 31.9% Missouri 750 MW 3.6% New Mexico 300 MW 1.4% Oklahoma8,550 MW * 41.3% Texas4,500 MW 21.7% TOTAL 20,700 MW 100% * Includes 4,450 MW in Oklahoma Panhandle

26 Potential EHV Overlay Mid- Point Design for 13.5 GW Wind

27 Updated EHV Overlay Study Findings Focus on midpoint designs to collect / deliver 13.5 GW of new wind in SPP 5.5 GW to SPP 3 GW to WECC via HVDC 2.5 GW to northeast 2.5 GW to southeast $8 billion at $2 million / mile engineering and construction costs + $65,000 / mile for Rights-of-Way 2,250 miles of 765 and 500 kV in SPP Almost 600 miles of 765 kV in new interconnections and connectivity in neighboring systems

EHV Overlay Next Steps SPP Transmission Working Group supports further work Scope being finalized to identify alternative plans and sensitivities for economic analyses to be concluded in 4 th Quarter 2008 Review and incorporate new data, objectives, etc. as appropriate into concurrent plans e.g., see DOEs 20% Wind Energy by 2030 report released May 12 th at Nebraska entities integration into SPP Must be robust, flexible and coordinate with neighbors plans. Must demonstrate incremental value and merits of 765 vs. 345 kV overlay in SPP

29

30

31 JCSP Next Steps Evaluate existing RPS baselines, as well as a 20% National RPS as part of 2008 NREL/DOE Eastern Wind Integration Transmission Study (EWITS) Next Meeting October 2 in Carmel, IN Studies will be used to demonstrate the value of bulk power transmission to harvest best wind resources in central plains, rather than build local wind to met local requirements. Check out

32 Wind Integration Issues Operational issues / reliability concerns warrant further investigation to address wind integration challenges Developing scopes of wind integration and penetration studies Further dynamics and reactive compensation analyses required SPP staff / members involved in numerous industry initiatives on wind integration EHV build out, regardless of drivers, will require changes to power system planning and operations

33 Cost Allocations Are Key Cost allocations can be a barrier to effective transmission expansion planning, but need not be. Witness EHV expansion by South Central Electric Companies in the 1960s. FERC Order 890 is forcing industry to address this topic SPP Cost Allocation Working Group in process of finalizing recommendations on Balanced Economic Portfolio of 345 kV transmission expansion projects, primarily, with associated postage stamp cost recovery. Power industry can not afford to undervalue transmission anymore.

34 Reliability Base Plan Funding 33% / 67% Criteria or Designated Resource Transmission 2005 Economic Balanced Portfolio Postage Stamp Benefits / Cost kV and above Filed on 08/15/08 EHV Postage Stamp 765 kV Work in Progress

35 Questions?

36 Jay Caspary Director, Engineering