IREC Interconnection Workshop Oct. 1, 2003 1 Interstate Renewable Energy Council Interstate Renewable Energy Council Kansas Interconnection Implementation.

Slides:



Advertisements
Similar presentations
Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
The Midwest ISO from a Transmission Owner Perspective.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
1 TEPPC March 25, CCPG Transmission Providers.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Goals for 2003 Kansas Interconnection Standards Development Larry Holloway Chief of Energy Operations Kansas Corporation Commission.
Larsen Consulting Solutions, Interconnection Activity around the U.S. IREC Interconnection Workshop Wichita, Kansas October 1, 2003 Chris Larsen.
E N D E C O NE N D E C O NE N D E C O NE N D E C O N E N G I N E E R I N G Distributed Generation Interconnection Standards IREC Interconnection Workshop.
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
WECC Reliability Based Control Field Trial
Kansas Interconnection Implementation Workshop The FERC Process: What it means for Kansas and other states Wichita, Kansas Oct. 1, 2003 Christopher Cook.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
Distributed Generation (DG)
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
California Interconnection 101 An Update on Reform: What’s Happening and Why it is Important March 16, 2011 Sky C. Stanfield
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Queue Reform at the Midwest ISO NARUC February, 2008.
Northeast Congestion Management/SPS in TCR Calculations James J. Teixeira John Moseley.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Strength Discussion
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Topics to Cover Interconnection Process Overview
The Regulatory Assistance Project 110 B Water St. Hallowell, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
SPP.org 1. SPP: Demand Response and Advanced Metering in Arkansas.
Interconnection of Small Wind & Solar Systems to Distribution Utilities: A Cooperative Perspective Patrick Parke Midwest Energy Hays, KS September 26,
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Central Vermont Public Service Recognized by Forbes as One of the Most Trustworthy Companies in America Lessons Learned Interconnecting Distributed.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
> 30 kW Interconnection Work Group Meeting June 19, 2007.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
RPG Meeting Five Year Plan Extension Brad Schwarz.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
CHP and the PUCO. Overview What we know about existing CHP in Ohio How CHP fits into S.B. 221 Navigating the regulatory framework for CHP –Interconnection.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
Transmission-Distribution Interface Working Group Meeting
Updates to the Path Rating Process for Approval by the PCC
Western Electricity Coordinating Council
NERC TPL Standard Overview
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Working with Utilities Sean W. Carr, P.E., PMP®
Reliability Assessment Committee Reliability Workshop Priorities
Collaborative Results Restructuring Roundtable March 28, 2003
Enhanced Curtailment Calculator (ECC)
Reliability Assessment Committee Reliability Workshop Priorities
Presentation transcript:

IREC Interconnection Workshop Oct. 1, Interstate Renewable Energy Council Interstate Renewable Energy Council Kansas Interconnection Implementation Workshop Wichita Airport Hilton Christopher Cook, E3 Energy Svcs. October 1, 2003

IREC Interconnection Workshop Oct. 1, IREC Interconnection Model PDrawn from a variety of sources FERC ANOPR Consensus documents Mass. Collaborative Consensus tariff NARUC model IA Utility tariffs and applications PJM Small resource interconnection procedures

IREC Interconnection Workshop Oct. 1, IREC Interconnection Model Concept PStandardize the procedures for interconnection PCarve out a small category of generators that should be easy to interconnect and expedite these through the standard process

IREC Interconnection Workshop Oct. 1, IREC Interconnection Model - Overview P3 procedural paths PSimplified for 10kW and less inverter based only (from Mass.) PExpedited for up to 2MW provided equipment certified and meets screening criteria (from Mass. And FERC) PStandard for up to 20MW (used FERC limit)

IREC Interconnection Workshop Oct. 1, Interconnection Model -Simplified PInverter based equipment only Inverter must be certified to IEEE 929 and listed by UL or other NRTL to UL 1741 PListing by NRTL qualifies the inverter as certified for these procedures -- no type testing PMust pass limited number of screens

IREC Interconnection Workshop Oct. 1, Simplified Screens P<10% (15% for solar) of radial ckt. peak load (at the substation) Solar higher because of coincidence with load P20 kVA limit on single phase connections on shared secondary

IREC Interconnection Workshop Oct. 1, Simplified Screens -cont. PSingle phase on 240V center tap is no more that 20% imbalance of nameplate rating of transformer PNo transmission level interconnections POn spot networks, <5% of the spot network's maximum load PNo area networks

IREC Interconnection Workshop Oct. 1, Simplified -- Timing and Costs Recommended costs =$0 3 days to acknowledge receipt of application (reject if incomplete) 10 days to run screens 3 days to send IA if passes screens (where IA not required - notice of approval) 15 days default approval

IREC Interconnection Workshop Oct. 1, Expedited Screens (2MW) P<10% (15% for solar) of radial circuit peak load (at the substation) Pgenerator cannot contribute more than l0% to the distribution circuit's maximum fault current on the high side Pgenerator cannot cause any protective devices or customer equipment to exceed 90 percent of the short circuit interrupting capability

IREC Interconnection Workshop Oct. 1, Expedited Procedure (2MW) Up to 2MW sized generators (Note: some suggest this is artificial limit -- see screen 10%) Generator and interconnection equipment package or interconnection equip. package must be certified (gen. type must be NRTL approved if equip. package only)

IREC Interconnection Workshop Oct. 1, Expedited Screens (cont.) PAggregate generation cannot exceed 10 MW in an area where there are known or posted transient stability limitations Pgenerator is interconnected as shown: Primary Distribution Line Configuration Interconnection to Primary Distribution Line Three-phase, three wire If a 3-phase or single phase generator, interconnection must be phase-to-phase Three-phase, four wire If a 3 phase (effectively grounded) or single- phase generator, interconnection must be line-to-neutral

IREC Interconnection Workshop Oct. 1, Expedited Screens (cont.) P20 kVA limit on single phase connections on shared secondary PSingle phase on 240V center tap is no more that 20% imbalance of nameplate rating of transformer PNo transmission level interconnections

IREC Interconnection Workshop Oct. 1, Networks - special screens PSpot networks: either <5% of the spot network's maximum load, or generator must utilize a protection to ensure its current flow will not affect the network protective devices (high speed reverse power). PArea Networks: export allowed for inverters only and limited to 10% of the minimum annual load on the network or 500 kW. (Solar measures min. during daylight). PArea networks: For all others (and inverters above limit) generator must utilize reverse power relays that ensure no export of power from the customer's site including inadvertent export that could adversely affect protective devices on the network circuit.

IREC Interconnection Workshop Oct. 1, Timing 3 days to acknowledge application receipt 10 days to tell applicant if complete (reject if incomplete w/ list of missing items) & to run screens under Initial Review 5 days to send an IA if passes screens 15 days total (3 weeks) More time for Additional Review

IREC Interconnection Workshop Oct. 1, Alternative Procedural Paths If fails screens but utility believes it can be interconnected safely and reliably, then can go forward (includes minor system modifications) If fails screens, can go to Additional Review. Utility sets out what it needs to study and provides cost estimate. Gen. can decide to proceed.

IREC Interconnection Workshop Oct. 1, Before Operation Local Code official sign off (not necessarily part of the IP) Utility can witness IEEE 1547 commissioning test

IREC Interconnection Workshop Oct. 1, Expedited IP --Fees Total cost = $50 plus $1 per kW Example: 500kW unit pays $550 to complete interconnection Minor system modifications and Additional review at cost -- paid by the generator

IREC Interconnection Workshop Oct. 1, Expedited Procedures -notes No external disconnect required (unless one of the NEC required disconnects is located outside) Reason: not a critical safety component; > seldom if ever used; > cost can be high.

IREC Interconnection Workshop Oct. 1, Standard Review For all generators not qualifying for expedited treatment Limited to 20MW (5MW KS) Idea is to set out procedural guidelines so that state/national standards can be developed

IREC Interconnection Workshop Oct. 1, Standard Review - procedure Scoping meeting/feasibility study Gives generator a quick overview of what can be expected based on the proposed point of interconnection Utility offers to conduct Impact Study and provides a good faith estimate of anticipated cost

IREC Interconnection Workshop Oct. 1, Standard Review - IP (cont.) If gen agrees, undertakes impact study including coordination with affected systems If scoping meeting/impact study identifies power flows onto transmission, additional transmission feasibility/impact studies may be required (>2MW)

IREC Interconnection Workshop Oct. 1, Impact Study elements -dist. Load Flow Study Short-Circuit Study Circuit Protection and Coordination Study Stability Study (and the conditions that would justify including this element in the Impact Study) Voltage Collapse Study (and the conditions that would justify including this element in the Impact Study).

IREC Interconnection Workshop Oct. 1, Transmission Study digression Can usually skip for < 2MW Like distribution standard review includes: Feasibility Impact Facilities Study (both trans. and dist.)

IREC Interconnection Workshop Oct. 1, Feasibility Study - transmission High level look for any criteria violations that would suggest Transmission Impact Study is required Expedited version of LGIP examine a limited contingency set Linear analysis tools used to evaluate compliance contingency criteria (SPP). Short circuit calculations

IREC Interconnection Workshop Oct. 1, Impact Study - trans. Often waived for generators <5MW If required, expedited version of LGIP Load deliverability only for areas where margins are known to be limited. Stability analysis is generally not performed Short circuit calculations Grounding review

IREC Interconnection Workshop Oct. 1, Facilities Study If (either) Impact Study shows facilities needed to address identified impacts, utility provides a Facilities Study agreement (and good faith estimate of cost ±25%) Facilities study identifies in detail the utility equipment needed to interconnect the generator (breakers, conductors, poles, xformers, etc.)

IREC Interconnection Workshop Oct. 1, Final steps - Standard IP Costs for facilities and time to construct incorporated into an interconnection agreement. Commissioning test required (IEEE 1547 governs test) Provided commissioning tests satisfactory, interconnected operation approved.

IREC Interconnection Workshop Oct. 1, Standard -fees Application fee of $100 plus $2 per kW Example: 2 MW generator pays application fee of $4100 Gen. also pays for costs of studies and facilities (study costs limited to $100/hr)

IREC Interconnection Workshop Oct. 1, Misc. Provisions -All IPs Generator must conduct an annual disconnect test where is verifies that it will not island. Manufacturer recommended testing must be followed Utility can inspect at reasonable hours and disconnect if not in compliance

IREC Interconnection Workshop Oct. 1, Dispute Resolution PUC may designate a technical master w/ binding arbitration powers Master may be a university, DOE laboratory or RTO

IREC Interconnection Workshop Oct. 1, Standard Form IAs Simplified - one page (application and IA on one form) Expedited and Standard -- Interconnection Agreement based on NARUC model with operating rules from Mass. Included

IREC Interconnection Workshop Oct. 1, IA details Mutual non-interference: Generator operations will not interfere with utility and utility will not hinder generator operations (voltage, harmonics, etc.) Gen. May disconnected if it is causing problems. Utility agrees to modify its system if its operations adversely affect generator operations.

IREC Interconnection Workshop Oct. 1, IA details (cont.) Right to access Right to review maintenance and testing logs (except simplified) Mutual liability and indemnification Insurance: no specific utility requirement

IREC Interconnection Workshop Oct. 1, IA details (cont.) Disconnection: Utility may disconnect for maintenance after 7 days notice. Customer may disconnect temporarily w/o notice or permanently after 60 days notice.

IREC Interconnection Workshop Oct. 1, Standard Form Application Based on SGC version of FERC Application Limited details required. For Standard review many of the details provided during the process. Specific gen. May not be known at time of interconnection request.

IREC Interconnection Workshop Oct. 1, 2003 The End Stay Up-To-Date