12.04.2011T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting 12.04.2011 T. Kawamoto.

Slides:



Advertisements
Similar presentations
Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
Advertisements

Status of the ATLAS MM project
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
The ATLAS B physics trigger
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
NSW background studies Max Bellomo, Nektarios Benekos, Niels van Eldik, Andrew Haas, Peter Kluit, Jochen Meyer, Felix Rauscher 1.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Trigger processor John Huth Harvard. NSW + TGC of BW’s track fitting track position (R,  ) d  : deviation of incidence angle from infinite pT muons.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
A new generation of RPCs to be tested for the super- LHC CERN GIF workshop 20/06/2011 G. Aielli.
LHC Upgrade: Evaluation of monitored drift tubes inclusion into the ATLAS level 1 muon end cap trigger ICEPP, KEK A Katarina Bendtz, Takayuki Kamiya, Tatsuo.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Muon-raying the ATLAS Detector
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
The ATLAS Upgrade Plan (Preparing for the next 2 Decades of Data) V. Polychronakos, BNL DPF Providence, RI, 9 August, /9/2011ATLAS Upgrade Plan.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 Recommendation for the New Small Wheel layout T. Kawamoto (NSW i-project leader), J. Dubbert (NSW i-technical coordinator), L. Pontecorvo.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
ATLAS P. Morettini - ATLAS Collaboration 3/9/20131Paolo Morettini - ICNFP 2013.
Design Studies of the ATLAS Muon Level-1 Trigger based on the MDT Detector for the LHC Upgrade O.Sasaki, Y.Suzuki, K.Nagano, M.Ishino, M.Ikeno (KEK), K.Bendtz,
Precision Drift Chambers for the ATLAS Muon Spectrometer
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
Pixel detector/Readout for SuperB T.Kawasaki Niigata-U.
L. Pontecorvo1 The Muon New Small Wheels INFN CSN L. Pontecorvo.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Status of BESIII and upgrade of BESIII
for the Transition region G. Aielli for the RPC collaboration
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Atlas: Upgrade Phase I Massimo Della Pietra.
ATLAS-MUON Trigger hardware developments
Optical data transmission for
CMS November Upgrade Week
for the transition region on behalf of the RPC upgrade group
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Tracking and L1 triggering in the ATLAS Muon spectrometer at sLHC
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
The First-Level Trigger of ATLAS
ATLAS Silicon Tracker commissioning
Radiation Backgrounds in the ATLAS New Small Wheel
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Presentation transcript:

T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto

T. Kawamoto2 Tentative and incomplete lists of requirements on the new small wheel and introduction to next steps Based on what we have studied and learned Reference cavern background rate Requirements for L1 functions and electronics Requirements for precision tracking Requirements as a detector system Way to proceed Schedule Milestones

T. Kawamoto3 Cavern background and detector signal rate Estimated cavern bkg The RBTF numbers used with safety factor 5 reflecting its uncertainty In the lights of new simulation and measurements with collision data, can we update the estimation and its uncertainty/safety factor ?  new reference table ?

T. Kawamoto4 RBTF and prelim. FLUGG (C. Young) more detailed comparisons in his Oxford slides

T. Kawamoto5 C. Young, at Oxford R = MDT data / FLUGG simulation General good agreement, R=0.7 – 1.5, except for small corner with R= In small wheel, R = 1.5 – 2.0 (data is high)

T. Kawamoto6 1.0x x x10 34 Expected MDT tube rate (kHz/tube) from simulation (my simple calc ) with a (radically small ?) safety factor = 3 based on FLUGG simulation Tube rate (kHz) EI EM EO Barrel R

T. Kawamoto7 Requirements on L1 function and electronics From the studies of Domae, Nagano (resolution) and Suzuki (fake removal), we now know that we ask NSW to Find segments with high efficiency and low fake  resolution of 1 mrad

Tubes Strips (MM, TGC, RPC) Wires (TGC) 15 mm tube: drift time 200ns perhaps OK for the L1 latency ~ 30 cm max, maybe ~ 40 cm? need resolution < 0.6 mm/layer  < 1~2 mm pitch Help with pads ? (good for all the 3) T. Kawamoto

L1 latency T. Kawamoto BW TGC data arrives at SL 1088ns after collision. This margin is shared by muon upgrade, topo trig, CTP, MuCTPi upgrades

L1 latency T. Kawamoto data from NSW new SL Data from NSW should arrive at new SL earlier than those from BW TGC  things are easy.

T. Kawamoto11 Requirements on precision tracking Not much studied yet, except for efficiency drop of MDT at high rate What are needed at high lumi to maintain the tracking performance ? Can we aim even improving the performance (if there is any room) ? more layers faster detector Reconstruction experts contacted. Foresee reports in next meetings.

T. Kawamoto12 Requirements as a detector system Mechanics Large-Small layout Ensure access to detector, electronics and services Similar or better radiation shielding 100% detector coverage Careful about services size of cables, tubes cooling needed ? Alignment Installation strategy, ALARA Cost

T. Kawamoto13 Basic structure : with JD or without ? JD is not needed as magnetic return for solenoid without JD, the whole structure may be light-weight : easy to handle without JD, access to detector will be easier However JD is (believed to be) needed for mag-shielding for LAr, Tile electronics and JD does radiation shielding (simulation study)

T. Kawamoto14 Next steps Establish the requirements Participation needed (background reference, L1, tracking, system) More structured/organized activities : working group Tools for performance study: perhaps no single super tool High lumi MC with the present detector (still need validation) Overlay of real data to emulate high lumi condition (good for some Simulation of new detector anyway (technical difficulty …. Next meetings 28 April (Thursday) 13 May (Friday) 30 May (Monday) 17 June (Friday) 5 July (Tuesday, Muon week) 22 July (Friday) TP editorial meetings

T. Kawamoto15 Requirements Layout 1 Layout 2 Layout 3 Expected performance Baseline layout Layout …… Evolution Autumn 2011 a panel of external members with

T. Kawamoto16 LHC and shutdown schedule Shutdown for phase -1 : end of 2011, EEL, EES C-side, trigger feet region Shutdown for phase 0 : 2013, 2014(a part of), 19 months for LHC, 2 years p - p Shutdown for phase 1 : 2017  possibility of 2018 being discussed

T. Kawamoto17 Requirements on tracking, L1, technical feasibility, cost, …. : in next few months Technical proposal : draft by end July for circulation in the muon collaboration Requirements with several detector/electronics options Finalise Sept/Oct 2011  proceed to the project Detector technology choice, baseline layout : by autumn 2011 Suggested schedule : for discussion here and also at the muon week

T. Kawamoto18 Last autumn, when IB set up the internal project of new small wheel, phase-1 shutdown was Many considered that 2016 was very tight (and I agree) may be just OK would be better. No margin for slowing down the schedule.