ASN(RDA) DASN (AP) Tuesday, July 03, 2012 Navy WHF and the Prevention of Common CDR deficiencies:

Slides:



Advertisements
Similar presentations
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
Advertisements

Logging In 1.Click the ‘Continue to this website (not recommended)’ link to enter the WAWF system. (left) 2.Accept the terms and conditions. (right)
Electronic Timesheet User Manual
Vendor Guide to Mandatory Pre-Population in WAWF 5.4
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Create a PeopleSoft ® Requisition. We will cover... The Procurement Process Nomenclature How to log in to PeopleSoft Finance How to create a requisition.
eBilling Training Invoicing
* Requisition Processing Common Problems * Budget Checking Errors * Run Controls * Process Scheduler Request & Process Monitor * Questions.
SRC Application Process Fall 2014 Version: November 12, 2014.
ProcureAZ 11 Invoices.
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Accounts Payable Training for Direct Pays. AGENDA Is a PO needed Learn When A Direct Pay Is Needed or Learn To Successfully Remove A Direct Pay Making.
Public Vouchers Further information is available in the Information for Contractors Manual under Enclosure 5 The views expressed in this presentation are.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
BPEL Tool Discussion Wednesday, November 17, 2010 ASN(RDA) DASN(ALM) eBusiness Bruce Lowrey Contract Pay Auto-Population (CPAP) Initiative.
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
Supplier Invoicing North America
Welcome to the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing.
ONLINE ORDERING Advantages: Your school’s Net-Discounted price is displayed (You can budget more accurately. Accounts payable has fewer adjustments to.
Wide Area Workflow (WAWF) Demo
Express Billing Finance Business Solutions. Agenda  What is Express Billing?  Standard vs. Express Billing  Express Billing Set Up -Personalize Page.
Comprehensive Continuous Improvement Plan(CCIP) Training Module 5 Funding Application Workflow, Communication, and Tracking.
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
MyFloridaMarketPlace Receiving Made Simple Commodities and Services Job Aid.
Your Financial Work Returned Invoices Rebecca Beck Chief, Contract Input August 2003.
Annual Certification IDEAS-PD Select your IDEAS role from the list at the right. After completing that module, be sure to take the User Preference Setup.
Solutions Summit 2014 Discrepancy Processing & Resolution Terri Sullivan.
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
FAMIS Requisition Entry Office of Procurement, Contracts, and Reconciliation.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
AOW - 1 Account on the Web (AOW) Reference Guide Page Registration 2 Accessing Your Accounts/Invoices 3 Viewing Invoices 4-5 Filtering and Sorting Invoice.
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
NetLink II User Guide PCO Module 1. 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout.
Wide Area Workflow Receipt and Acceptance Creating a Receiving Report.
Lead Management Tool Partner User Guide March 15, 2013
Finance & Administration Quarterly Update Business Affairs Update July 26, 2010.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
SRM Free Text Carts SRM_SHO_303 SRM Free Text Carts.
Wide Area Workflow Receipts and Acceptance Working in the View Only Folders.
Table of Contents (click on an error to jump to that slide)
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Tyfany Frazier
U NIQUE ID ENTIFICATION (UID) Wide Area Work Flow (WAWF) Update March 9-10, 2004 James Craig
Wide Area Workflow Receipts and Acceptance Working in the Acceptance Folder.
NOTE: Enter the appropriate MOCAS Pay Office DoDAAC.
How to Enter a Requisition for Goods and Services in Owl Link Updated March 15, 2013.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Contract Invoice Guide
Page 1 MASS RECLASS REQUISITIONS TO CHANGE ACCOUNTING Instructions on how to create the requisition to change the ACCS on awards affected by the MASS RECLASS.
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
MS Invoice E-Invoice Solution Overview March 2016.
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Resolve Invoice Exceptions
Rebecca Beck Chief, Contract Input August 2003
Create a PO-Based Invoice
Accounts Payable Workflow
Contract Deficiency Report (CDR) Workflow & Roles
UPS – Tradeshift Supplier Training
Electronic Document Access (EDA)
How to Redeem a Resource Manager Token in AIM
Contract Payment Reporting Module (CPRM)
Navy WHF and the Prevention of Common CDR deficiencies:
E-Procurement Project
Contract Pay Auto-Population (CPAP) Initiative
Contract Closeout (CCO)
Purchase Document Management
Presentation transcript:

ASN(RDA) DASN (AP) Tuesday, July 03, 2012 Navy WHF and the Prevention of Common CDR deficiencies:

AGENDA 1.NAVY WORKFLOW HOSTING FACILITY (WHF) BACKGROUND 2.EDA AUTO-GENERATED (AG) CDR PROCESS + CONCERNS 3.CDR PREVENTION  WHF MOST COMMON ERRORS  WHF ANCILLARY ERRORS  CDRL CLIN FORMAT  RESERVED CLIN FORMAT 4.CDR FAQ’s

NAVY WHF Background 3

BACKGROUND: Why the Navy WHF? 4 1. Enables Data to Flow to DFAS’s MOCAS system The initial WHF workflow was rolled out in October 2009 to validate DoN XML data (data from Contracting actions in SPS) en route to the Mechanism of Contract Administrative Services (MOCAS) system to ensure it meets DFAS business rules for electronic insertion The average MOCAS electronic insertion rate of SPS actions since the WHF started validating contract data increased by more than 30% between 2009 and 2012( 50% EC today) 2. Improves Data Quality Strategy  Allows Navy to manage the quality of its contracts and gain insight into wide-spread business processes that are causing high manual (vs. electronic) insertion rates.  Eliminates the burden on DFAS to “massage” the data to flow electronically and cuts down on subsequent manual data errors. 3. Generates Cost-Savings  MOCAS electronic insertion can save up to $20* per invoiced Line of Accounting (LOA) over manual DFAS payment fees amounting to Millions in potential annual savings on the Navy DFAS bill alone and leading to greater data integrity and accountability by reducing manual data entry errors.  The initiative has accounted for more than $8 million** in DFAS savings since FY09. Based on FY12 rates, specifically the difference between Manual Insertion (006) rate of $27.66 and Automatic Payment of Invoices (036) rate of $7.18 ** - Estimated from current data and rates vs. historical numbers

BACKGROUND: What is the Navy WHF?

Our contract writing systems (e.g. SPS and PD2) contain several electronic data fields. When data is entered into these electronic fields, it automatically flows electronically, by means of an XML file, into the MOCAS System. DFAS uses the MOCAS system to pay contractor invoices. When the data in MOCAS is accurate and complete, DFAS is able to pay automatically so it bills the Navy less than it would if a DFAS technician manually entered the data. 6

BACKGROUND: Why the Navy WHF? 7 XML Contract Data generated by Navy Contract Writing Systems WHF Data Validation Data Translated to X12 and UDF for EDI insertion into MOCAS Contract File Established electronically in MOCAS (coming soon) PDF Contract Data generated by Navy Contract Writing Systems Contract data inputted into the EDM module of EDA Contract File Manually Established in MOCAS from PDF Image

Auto-CDR Generated in EDA Summary Error Reports ed to POCs weekly and Monthly Contract Data Manually inputted from PDF Image in EDA 8 BACKGROUND: Why the Navy WHF? (cont’d) XML Contract Data generated by Navy Contract Writing Systems WHF Data Validation Data Translated to X12 and UDF for EDI insertion into MOCAS Contract File Established electronically in MOCAS (coming soon)

WHF SUCCESSES: Workcount FY10-FY11 Comparison 9 4-YearSavings: ~$8.4 Million FY TOTALSFY09FY10FY11 FY12 (PROJECTED) 06 - Contract Payments - MOCAS627,932622,991596,311581, Contract Payments - MOCAS EC67,93578,80792,73277, Contract Payments - MOCAS EC - API29,28841,69569,552116,378 Total MOCAS 725,155743,493758,595775,854 Total MOCAS Electronic 97,223120,502162,284193,964 % EC (includes both 26 and 36) 13%16%21%25% % Full EC (OSD Metric - OP36 only) 4%6%9%15% 100% MANUAL COST $ 23,204,960 $ 23,962,779 $ 21,088,941 $ 21,460,130 ACTUAL COST $ 21,871,915 $ 22,165,458 $ 19,023,049 $ 18,209,301 SAVINGS $ 1,333,045 $ 1,797,320 $ 2,065,891 $ 3,250,829

NAVY WHF EDA Auto-CDR Process 10

FUNCTIONALITY: Auto-CDR Process (cont’d) Contract Award GEX Contract Modification MOCAS Electronic Insertion WHF Validation Rejection Notification to Contracting Office XML Converted to DAASC Pass Fail Contract Writing System Information Sent to EDA CDR Module 11 Auto-CDRs have been in production since August 2011 Mod to Correct Deficiency

FUNCTIONALITY: Auto-CDR Process Automated CDR Process 1.Contract Deficiencies flagged by Navy’s WHF are electronically sent to EDA for Pre-Population of CDR data 2.DASN(AP) accesses CDRs, approves CDRs, and assigns directly to PCO or command POC for resolution 3.PCO receives notification of assigned CDR 4.PCO resolves CDR or assigns to Contract Specialist 5.Mod is released to correct CDR deficiencies as soon as possible 12

FUNCTIONALITY: Auto-CDR Process Current PCO Responsibilities All PCOs must register in EDA Review Assigned CDRs (received via notification) Take Action:  Accept – Click the appropriate button in EDA to accept the CDR and begin to look into resolution options  Consult with command’s CDR POC for guidance on CDR resolution  Reject - PCO disagrees with error message and communicates with CDR initiator via comments section in EDA to discuss discrepancy  Reassign (To another PCO or Specialist)  Resolve (issue modification/ release to EDA/ MOCAS) 13

CDR Prevention 14

CDR Prevention: Integrity Check 15 ALWAYS Use the Integrity tool Catch errors BEFORE the action is released If you address all of the errors listed in the Integrity check before the action is released then you should not get a CDR Pay attention to both the Red and the Yellow errors, just because an error is yellow does not mean that it is not valid

BACKGROUND: Most Common CDR Errors Summary Top Functional Issues Causing Rejection:  Delivery is Missing 33%  Delivery Ship-To Address Missing 23%  Invalid NSN 12%  Line Item Has No Unit Of Measure 9%  Priced CLIN Has No Funding Information 6%  Invalid Entry In MILSTRIP Field 5%  Delivery Ship To Address DoDAAC is Missing 3%  Funding Missing On Sub-Line Item 2%  LOA is not in CMET Table 2%  Line Item Missing Inspection Acceptance 2% 16 Program Managers Finance Acquisition Logistics

WHF MOST COMMON ERRORS: Delivery Errors 17 Missing Delivery accounts for 33% of CDRs Reasons for delivery errors in CDRs: 1. POP or Delivery information is typed manually into Section F, rather than entered as data in the line item detail tab 2. POP or Delivery information is entirely missing from contract 3. POP or Delivery is included in an attachment to contract, but not in main contract 4. RESERVED or unfunded CLIN are marked as priced CLINs (rather than informational) and specialist does not enter delivery information because it does not exist DELIVERY OR POP MISSING

WHF MOST COMMON ERRORS: Delivery Errors 18 Missing Ship-to UIC/DODAAC accounts for 23% of CDRs Reasons for ship-to errors in CDRs: 1. Delivery information is typed manually into Section F, rather than entered as data in the line item detail tab 2. Delivery date/shipping input used for services CLIN rather than POP 3. POP entered for product CLINs and Ship-To information is missing 4. Delivery/POP information is placed in Informational CLIN/SLIN rather than Priced CLIN/SLIN SHIP TO ADDRESS/UIC MISSING

WHF MOST COMMON ERRORS: Delivery Errors 19 Entering Delivery Info for Product CLINs:

WHF MOST COMMON ERRORS: Delivery Errors 20 Correct format for delivery on product CLIN: You can search for shipping DODAACs at:

WHF MOST COMMON ERRORS: Delivery Errors 21 Entering Delivery Info for Service CLINs:

WHF MOST COMMON ERRORS 22 Do not insert delivery data on Informational CLINs/SLINs, only insert delivery data on Priced CLINs/SLINs

WHF MOST COMMON ERRORS: Delivery Errors 23 Pick One

WHF MOST COMMON ERRORS Invalid NSN 12%  Do not use the NSN field for anything other than actual NSN’s, use the Extended Description section to input additional information  Prior to July 31, 2012 the system only recognizes 13 character NSN’s. We have updated the system to recognize all valid NSN’s, in the meantime ignore CDR Errors if you know that your NSN is valid  Each NSN is correlated with an authorized Unit of Measure (UOM) 24

WHF MOST COMMON ERRORS Line Item Has No Unit of Measure 9%  Common misconception that Data/CDRL CLINs do not require a unit of measure. This is WRONG. Use “Lot”.  Use on all “Priced” CLINs 25

WHF MOST COMMON ERRORS Priced CLIN/SLIN Has No Funding Information 6%  If a CLIN/SLIN is priced, then it must contain funding information or should be marked as NSP - “Reserved” CLINs should be marked as Options or “Info Only” - CDRL/DATA CLINs should be designated NSP - This error does not occur when the priced parent CLIN has funded info SLINs 26

WHF MOST COMMON ERRORS Invalid Entry in MILSTRIP Field 5%  The MILSTRIP field is often mis-used  Only use the MILSTRIP field for valid MILSTRIPs, otherwise leave the MILSTRIP field blank  Valid MILSTRIPs do NOT begin with G, I, O, X or Y and must be 14 – 15 characters in length with no dashes 27

WHF MOST COMMON ERRORS Delivery Ship To Address DoDAAC is Missing 3%  Shipping address alone is not sufficient, must include DODAAC  When shipping in place, use the DODAAC or Cage Code for where the item is sitting to affirm that it will be in a specific location on a specific date  You can search for shipping DODAACs at:

WHF MOST COMMON ERRORS Funding Missing on Sub-Line Item 2% 29 Priced SLINs (SLINs with alphanumeric numbering) should always have an LOA. If the LOA is removed, then delete the SLIN.

WHF MOST COMMON ERRORS Line Item Missing Inspection Acceptance 2%  Please use the Inspection/Acceptance field in the “Description” tab  You are encouraged, but not required, to insert the location DODAAC  For services, use the location where the work takes place 30

WHF ANCILLARY ERRORS 31  Award-Fee Payment CLINS: No designator to mark CLIN as award-fee only; instead, Contract Type must be FPAF/CPAF, CLIN description should state “AWARD FEE for Period XX/XX/XXXX through XX/XX/XXXX”, UOM should be US Dollars, and the POP field should display period of performance for the award fee so it documents when services were rendered

WHF ANCILLARY ERRORS 32  Option CLINS; Option CLINs should be designated as such via the “Options” drop-down

CDRL CLIN Format 33  CLIN Type: Priced  Cost Constraint: NSP or NC  Unit of Measure and Quantity: 1 Lot  One CLIN per CDRL  Mark as “Exhibit” by clicking the Exhibit check-box  Delivery: Required

RESERVED CLIN Format 34 CLIN Type: Info Only Cost Constraint: TBN Unit of Measure and Quantity: N/A Delivery: N/A