Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Linking NAPs to broader national strategies and processes.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
1 Conservation: An Alternative Energy Source for Local Communities Ted Coates, Power Manager September 20, 2008.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
1 | ESPC Technical Assistance Team eere.energy.gov Welcome to Today’s Training for State and Local grantees on Energy Savings Performance Contracting:
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Economic Realities for Sustainable Real Estate Green Retrofit Lending 34 th Annual Real Estate & Economics Symposium Fisher Center for Real Estate & Urban.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Administrative Staff College of India, Hyderabad Retrofitting Mahindra Towers: How an Innovative ESCO model Lowers Energy Bills with no Upfront Cost Rajkiran.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
TRP Chapter Chapter 4.2 Waste minimisation.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
‘Today’s Energy Partner For Tomorrow’s World’ Billing and Bureau.
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Presentation to Chief and Council A joint initiative brought to you by: Ministry of Energy and Mines BC Hydro Developed and delivered by: Quality Program.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Managing Operational Energy in Buildings
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Life Cycle Cost Model Update Preliminary Report Joint Legislative Audit & Review Committee January 4, 2007 Stephanie Hoffman and Keenan Konopaski.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
GREEN FIEND ENERGY & ENVIRONMENT Energy Conservation.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
Compliance – Three Options 1. Prescriptive Approach 2. Performance Approach 3. Simple Trade-Off Method (STOM) Section 9.36 of the NBC.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
1 E F F I C I E N C Y D E C I D E S State Properties and public Buildings. Energy costs: about 3.5 billion €/year Source: Umweltbundesamt, 2000 and own.
Energy Services Harsha Holalu Ramakrishna Energy Extension Specialist Department of Mechanical and Aerospace Engineering.
Energy Project M&V: Reports that Add Value October 27, 2015.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
Operations. Environmentally Conscious Operations Reducing heating costs Reducing heating costs Office waste reduction Office waste reduction Choosing.
Wood Smoke: Monetizing Health Benefits Regional Technical Forum August 23, 2013.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
AUDIT ENERGI AGUS HARYANTO. DEFINISI Energy Audit can be simply defined as a process to evaluate where a building or plant or activity or process uses.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for non-residential buildings - Performance requirements.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
EnMS Management Review
Industrial Assessment Center Database
Developing and Issuing the RFP
Presentation transcript:

Reviewing the Audit Results

Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual utility consumption and cost for your building or a specific energy end use n It provides the basis for the technical and economic analysis of potential energy conservation measures (i.e., investment- grade audit) n It also provides the basis for measuring and/or calculating the value of future energy savings (i.e., monitoring project performance)

Factors to Consider When Establishing the Base Year n Changes in building equipment, structures, schedule, occupancy, or control setpoints n Recent operations and maintenance work impacts on energy consumption n Mild or severe weather conditions n Changes in utility rates n Adequate, accurate documentation or measurement of current equipment operating conditions, sizes, loads, and schedules n Existing lighting levels, ventilation rates, temperature, and humidity

Challenges to Calculating an Accurate Base Year n Data analysis fails to account for periods during which equipment was broken or malfunctioning n Base year consumption data reflect atypical schedule or operating conditions n Consumption data are inaccurate or missing due to utility metering, billing, or data entry errors n Run hours of equipment  operating hours of building n Run hours of equipment  facility staff estimates n Thermal loads may not be simply proportional to weather due to occupant load n Actual annual equipment loads  full load rating nameplate (e.g., average motor operates at 60% of full load rating)

Review of Audit Draft n Request draft copy of audit report (70–80% complete). n Review draft with HA Performance Contract team. n Develop list of questions for ESCO. n Meet with ESCO to resolve questions and/or reiterate expectations.

Energy Conservation Measures (ECMs) to Consider n Building envelope n Heating systems n Air-conditioning systems n Ventilation systems n Control systems n Lighting systems n Water services n Appliances n Resident education

Accurate Technical Analysis n Are the data used for energy rates and equipment costs accurate? n Does it provide a comprehensive analysis of technical options? n Are the calculations based on reasonable input estimates? n Are the calculations reproducible and free from math errors? n Have interactive effects between technical options been evaluated?

Accurate Technical Analysis (cont.) n Poor data collection practices can create significant errors in the analysis (check the ESCO’s standardized data collection format) n Use technical assistance to review the calculations and proposed technical schedules n Does the audit properly quantify environmental costs and benefits? (e.g., value of recycled CFCs, disposal costs, avoided air emissions) n Do the proposed measures maximize net project benefits?

Accurate Economic Calculations n Utility bill reconstruction should be used to value savings n Materials and maintenance savings should be clearly documented and calculated n Utility price escalation rates used for cash flow analysis or future savings valuation should be reasonable n Economic impacts of performance guarantee provisions on HA annual budget should be evaluated