Incom Inc. Capillary Array Technology Status of 32.8 mm Ф and (200mm) 2 MCP’s.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Mock-Up Test For Optical Diagnostics MERIT VRVS Meeting April 12 th, 2006 By Thomas Tsang (BNL), Hee Jin Park (SUNY at Stony Brook) Thanks to Bill Sands.
Finishes - Preparation. The term aesthetics is used to describe the outward appearance of a product. Basic preparation is needed before any finish can.
LASER CUTTING ISE. WHAT IS A LASER CUTTER? ● Laser stands for Light Amplification by the Stimulated Emission of Radiation ● The laser is a monochromatic.
REPAIRING/RECONDITIONING TOOLS UNIT *Obvious use of tools is to build, repair and adjust objects *High quality tools will last for years if used & maintained.
The LaRC Fiber Draw Tower Presented by Stan DeHaven.
Sample Preparation and Mapping Steps –Cleaning and drying of bulk samples –Initial Preparation. Cutting, impregnation, cast- making, fusing –Mounting.
LIGHT-DUTY BELT FASTENER SYSTEMS
How to Build a Tree Stump Cache Original Idea by Cedar Bend Gang.
Assignment#01: Literature Survey on Sensors and Actuators ECE5320 Mechatronics Assignment#01: Literature Survey on Sensors and Actuators Electrostatic.
Laser Printers.
Abstract At the Thomas Jefferson National Accelerator Facility in Newport News, Virginia, a team of nuclear physicists has come up with a way to probe.
Sample Preparation or Sample Prep. Always Handle samples with GLOVED HANDS!
Jan M. Yarrison-Rice Physics Dept. Miami University/University of Cincinnati Raith 150 User Meeting Stanford University September 29 & 30, 2003 A Novice’s.
Repairing and Reconditioning Tools Tool Fitting. Objectives: 1)Identify and remove rust from tools in the lab with 100% accuracy 2)Demonstrate the application.
Advanced Machining Processes
CONSTRUCTING A FIVE CABIN LATRINE
ALD 20µm Microchannel Plates
The Laser Printer Process
Semiconductor Device and Processing Technology
John Amann – ILC Mechanical Engineering 11/13/06
1 Moore’s Law – the Z dimension Sergey Savastiouk, Ph.D. April 12, 2001.
General Semiconductor Packaging Process Flow
Manufacturing processes
Telescope Technologies
ICARUS Cold Vessels Thermal insulation Project progress report.
DRAFT INFLUENCE OF PHYSICS OF TABLET COMPRESSION Small-Scale Presenter: Alberto Cuitino November 3 rd, 2010.
5.1 Define terminology 5.2 Discuss safety practices in tool fitting 5.3 Identify tools that may need fitting 5.4 Perform needed reconditioning of tools.
SRC/Sematech Engineering Research Center for Environmentally Benign Semiconductor Manufacturing 1 Micromachined Shear Sensors for in situ Characterization.
Presentation on SGS, Crystal Defects & Wafer Preparation Guided By MD. Mohiuddin Munna.
Basic Bowl Turning. 1. Draw circle on top of board. 2. Cut to size on band saw. 3. Sand one surface of the bowl and the top o the waste block that is.
Universal College Of Engineering & Technology
Doping and Crystal Growth Techniques. Types of Impurities Substitutional Impurities Substitutional Impurities –Donors and acceptors –Isoelectronic Defects.
Armorguard By Ford Meter Box.
Surface Treatment Issues for RF Structure Fabrication Juwen Wang SLAC National Accelerator Laboratory X-Band Accelerating Structure Review November, 2014,
INFLUENCE OF PHYSICS OF TABLET COMPRESSION
Introduction to Manufacturing Processes
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
Agricultural Mechanics Career Development Event Concrete and Masonry
Diamond Radiator Fabrication and Assessment Brendan Pratt Fridah Mokaya Richard Jones University of Connecticut GlueX Collaboration Meeting, Jefferson.
Prof. Jiakuan Yang Huazhong University of Science and Technology Air Pollution Control Engineering.
LHC vacuum chamber dust High Pressure pure water rinse –Developed at CERN for LEP sputtered SCRF NEG Coating –Most likely must be re-applied Nozzles and.
Elements of Art.
1 of 13 Mark Tillack, John Pulsifer, Sam Yuspeh, Matt Aralis HAPL Project Meeting October 2008 Madison, WI Progress on GIMM mirror development and.
Chapter 6.2. Two Types of Forces with Compounds Intramolecular Forces the forces of attraction that hold the atoms together in a molecule. Ex. ionic bonds,
Lesson 3: Cohesion, adhesion & surface tension Objective: 1.Describe cohesion, adhesion and surface tension 2.Understand how and why plants utilize them.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Chapter 6 Biochemistry The Chemistry of LIFE – preAP Biology Moore High School.
Weathering and Soil Formation. What is weathering?
CASTING PROCESS.
Undergraduate Researcher: Robert Spencer Garland Advisor: Dr. Carl Frick NSF EPSCoR Fellowship Mechanical Engineering College of Engineering and Applied.
O. Siegmund, UCB, SSL 1 Incom substrates, 33mm diameter, no notches 20µm pores, 8 deg bias, 60:1 L/D, 65% OAR ANL processed for resistive and emissive.
Intermolecular Forces
Thomas M. Canty, P.E. J.M. Canty Inc. Buffalo, NY
SHEET METAL REPAIR & MAINTENANCE
Intermolecular Forces
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
Grinding Grinding is a process which utilizes the use of abrasive particles bounded together to produce superior surface finishing An abrasive: is a small,
OBJECTIVES Explain the factors that cause rotor damage.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
Building Construction I Sofia Sebastian 1
Forces between Particles
Photonic Crystal Fibers (PCFs)
Layer Transfer Using Plasma Processing for SMART-Wafer
MacDermid Plc Offshore Div.
Intermolecular Forces
LITHOGRAPHY Lithography is the process of imprinting a geometric pattern from a mask onto a thin layer of material called a resist which is a radiation.
Sample Preparation and Mapping
GENERAL MOULD CONSTRUCTION CONCEPT
Presentation transcript:

Incom Inc. Capillary Array Technology Status of 32.8 mm Ф and (200mm) 2 MCP’s

Topics Large Area Capillary Arrays – Fabrication & Attributes Finishing Goals & Challenges Finishing Process Technology Wire Saw vs. ID Saw Grind & Polish Cleaning Challenge Incom Orders & Delivery Schedules Other Developments Integral Mounting Pads™ Thermal Surface Finishing Glass Framed Arrays Photonic Band Gap Structures for Particle Acceleration X-ray Optics 2 Incom Inc. - Confidential

Capillary Fabrication A. Hollow Core No core to remove Finish & cleaning challenges Frugal Primary strategy B. Solid Core Etch removal of core Established process Low cost – suitable for certain applications Secondary option 3 Incom Inc. - Confidential

Process Benefits & Challenges Hollow Core ‘A’ Large Area (200mm 2 ) µ capillary “d” Unlimited block fabrication L/d Finishing & Cleaning limited wafer L/d >1,200µ thick wafers – current finishing limit (60:1) <1,000:1 – Cleaning (20 mm thick) Solid Core ‘B’ Large Area (200mm 2 ) 100-6µ capillary “d” Unlimited block fabrication L/d Finishing & Etch limited wafer L/d >800µ thick wafers – current finishing limit (40:1) <100:1 – Etch limit (2 mm thick) 4 Incom Inc. - Confidential

Capillary Process 8 Left - showing close packed capillary arrays with large interstitial gaps; Center –Middle: showing fused capillary array, filled interstitial gaps and round capillary, and Right: showing capillary with closed interstitial gaps forming hex shaped capillary. Incom Inc. - Confidential

Hollow Core “Block” ETD-2886 Block B10320 Fused 1/28/2010 9" x 9" x 16“ Incom’s largest to date Cracked post fusion! Block cut behind crack Forward section used for 4”X4” development wafers Aft section being held for 8”X8” wafers 9 Incom Inc. - Confidential

Block Slicing Challenge: Particulates Source: From cutting Glass, broken off and lodged at the entrance Smaller bits that enter into capillaries? Cutting slurry including other material carried by coolant ( swarf) Mechanisms for Adherence of Particles Physically lodged Covalent bonding Electrostatic Oppositely charged particle/surface Van der Waals Intermolecule attraction, between a dipole and an induced dipole Comparatively weak Capillary Forces Surface tension of liquid bridge between particle and surface Incom Inc. - Confidential

Cutting debris can be capillary material lodged inside the capillary or particulate that adheres to the walls 11 (Left) As-cut 20 µm capillary, with particle lodged inside capillaries. (Right) As-cut 20 µm capillary, with debris on the walls of the capillaries. Incom Inc. - Confidential

Cutting Debris – Tramps Carried by Swarf (L) Wire-cut, (R) SEM/EDX analysis showing iron containing debris Adhered particulate is extremely difficult to remove, once it has dried onto the capillary surface. Incom Inc. - Confidential 12

Wire Saw 13 Incom Inc. - Confidential Credit:

ID Saw 14 Incom Inc. - Confidential Credit:

ID Saw Blade 15 (L) New ID Saw Blade, (R) Old ID Saw Incom Inc. - Confidential Credit:

Wire Saw vs. ID Saw 16 I. Kao (PI), and V. Prasad, J. Li, M. Bhagavat, Department of Mechanical Engineering, SUNY Stony Brook, NY NSF Grant DMI ( ). Incom Inc. - Confidential

Challenge of Adhered Particles 17 (L) Wire saw surface finish and contamination. (R) SEM image showing adhered particles on inside of capillary. Note rough ‘as-ground’ surface, and interstitial gaps between adjacent capillary. Incom Inc. - Confidential

Grinding and Polishing 18 Loose abrasive ground capillary. Different cutting operations cause different levels of damage that must be removed by grinding. Typically,.005” -.006” of material is removed from each surface during grinding. Incom Inc. - Confidential

Final Polish 19 (Left) Incomplete polished capillary array (.001" removed). (Right) Complete polished capillary array (.002" removed). Incom Inc. - Confidential

20 µm Wafers After Final Finish & Clean

Argonne Order Status 21 StatusOrder #Part #DescriptionOrder Qty Open D32.8 mm Ф44 Partial Open D32.8 mm Ф8 Open A8”X8”30 Open B10µ25 Partial Closed D32.8 mm Ф35 Closed D32.8 mm Ф22 Closed D32.8 mm Ф43 Closed B40µ34 Closed A2 Closed A10 Closed A8 Closed A2 Incom Inc. - Confidential

Plan ‘A’ (hollow core) Schedule 22 ActionWK 1WK 2WK 3WK 4WK 5WK 6WK 7WK 8 Wire saw CNC Form/Cut square oversize Clean Grind & Polish (Sub.) CNC Final form Clean Inspect Packaging The "realistic" Plan "A" schedule is expected to take eight (8) weeks. Uncertainty with subcontractor production schedules for wire saw (2 weeks) and grind & polish (3 weeks) is included in the ‘realistic’ schedule. ‘Optimistic' turnaround at the “subcontractors” would reduce deliver to 6-7 weeks. The “realistic” schedule would give a wafer completion date of August 8th. Incom Inc. - Confidential

Plan ‘B’ (solid core) Schedule 23 Action16-JulWK 1WK 2WK 3WK 4WK 5WK 6WK 7 Block Fabrication (5 weeks) Wire saw CNC Form/Cut square oversize Grind & Polish (Sub.) CNC Final form Etch Inspect Packaging The block for "Plan B" is currently being fabricated and is expected to be available Friday, July 16. Since that block is 'standard fiber optic' finishing time is estimated at 6-7 weeks. This would lead to an estimated ship date of the end of August at the earliest and roughly September 10th at the latest.

Integral Mounting Pads (IMPS™) 24 Incom Inc. - Confidential

Thermal Surface Finishing 25 (L) 500X magnification, ID = 40 microns, top down 'dark field' lighting showing leveling of the surface and rounding of the sharp surface edges. (R) bottom up lighting showing narrowing or necking down of the capillary, creating a funnel shape at the surface. Typical Capillary appears to even smaller, with typical ID = 36 microns. Incom Inc. - Confidential

Glass Framed Arrays 26 Incom Inc. - Confidential

Photonic Band Gap Structures for Particle Acceleration 27 Incom Inc. - Confidential Incom Incorporated (Charlton, MA) and Stanford Linear Accelerator Center (SLAC) collaborated to fabricate PBG structures from borosilicate glass that serve as TM 01 cavities and couplers when properly driven by lasers and will allow tests of basic concepts for PBG accelerators.

Contact Michael Minot Incom Inc. MinoTech Engineering Inc. 28 Incom Inc. - Confidential

Cleanliness Requirements Vary Depending on the Application Occluded wells Fully vs. partially blocked % occluded Multi boundaries Type of contaminant Particulate Filler Water Hydrocarbons Incom Inc. - Confidential 29

Capillary Products CustomerCapillary Size (µm) Thickness (mm) L/dOverall dimensions “A”201.2mm60:124.8mm Diam Argonne201.2mm60:18” x 8” GA mm178:16” x 2.5” Incom Inc. - Confidential