Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (http://ific.uv.es/grid/CROSSGRID-IFIC/)

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
CROSSGRID WP41 Valencia Testbed Site: IFIC (Instituto de Física Corpuscular) CSIC-Valencia ICMoL (Instituto de Ciencia Molecular) UV-Valencia 28/08/2002.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,
The CrossGrid project Juha Alatalo Timo Koivusalo.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
INFSO-RI Enabling Grids for E-sciencE The gLite Software Development Process Alberto Di Meglio CERN.
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
CEOS WGISS-21 CNES GRID related R&D activities Anne JEAN-ANTOINE PICCOLO CEOS WGISS-21 – Budapest – 2006, 8-12 May.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
CERN IT Department t LHCb Software Distribution Roberto Santinelli CERN IT/GS.
CERN, DataGrid PTB, April 10, 2002 CrossGrid – DataGrid Collaboration (Framework) Marian Bubak and Bob Jones.
LCG LCG-1 Deployment and usage experience Lev Shamardin SINP MSU, Moscow
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
Yannick Patois - Datagrid Software Repository Presentation - March, n° 1 Datagrid Software Repository Presentation CVS, packages and automatic.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
Jesus Marco DataGrid WP6, Barcelona, 12 th May 2003 WP4 Status of the CrossGrid Testbed EDG WP6 Meeting, Barcelona Jesús Marco Instituto.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
ATLAS TIER3 in Valencia Santiago González de la Hoz IFIC – Instituto de Física Corpuscular (Valencia)
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
WP5 – Infrastructure Operations Test and Production Infrastructures StratusLab kick-off meeting June 2010, Orsay, France GRNET.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Towards an Information System Product Team.
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
Testing and Release Procedures/Tools Cristina Aiftimiei (INFN-CNAF) Mario David (LIP)
DataGrid Quality Assurance
Progress on NA61/NA49 software virtualisation Dag Toppe Larsen Wrocław
EO Applications Parallel Session
Release BETA Integration Tool Status Geneva – 1 March 2007
Ian Bird GDB Meeting CERN 9 September 2003
Leanne Guy EGEE JRA1 Test Team Manager
Presentation transcript:

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration ( Santiago González de la Hoz Instituto de FIsica Corpuscular IFIC (IFIC) CSIC Consejo Superior de Investigaciones Científicas (CSIC) Spain

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC2 Summary 3Goals 3Partners of this task and Integration Team 3Dependencies between this task and other WP’s or Grid projects 3Infrastructure Tasks software 3How do we plan to organise the process of testing wp3 tools? 3Time schedule 3Conclusions

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC3 Goals 3To deliver a release version of WP3 before each prototype 3Test all tools and services of WP3 3Integration and validation phase which it will require significant effort from all of the tasks

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC4 Partners and Integration Team 3PSNC, Poznan 3CYFRONET, Cracow 3UAB, Barcelona 3CSIC, Valencia, Santander & RedIris

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC5 Partners and Integration Team 3To reach the goals we need an Integration and Validation team 3It is formed by people from each task of this WP and by people from each partner of this task 3 Integration team: ÞLukasz Dutka (Cyfronet) task 3.3 & 3.4 ÞPawel Wolniewicz (PSNC) task 3.1 ÞMiquel A. Senar (UAB) task 3.2 ÞSantiago González (CSIC) task 3.5

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC6 Dependencies 3WP4 (International Testbed Organisation): This task is very strongly correlated with the prototypes released in WP4 because the testbed will provide the framework to run the applications made in the different WP’s. 3WP1 (CrossGrid Application Development) and WP2 (Grid Application Programming Environment): All tools and services of WP3 will be used by the applications 3DATAGRID project: The WP6 (Testbed & Demonstrators) and more concretely with the Integration Team because they are doing the tests and integration of the DataGrid middleware at the moment.

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC7 Infrastructure 3We need a CVS repository, Package Repository and Support tools, in order to deliver a release version of WP3. 3CVS Repository ÞFor WP3 has been created in PSNC ( tulip.man.poznan.pl ) WP3 central server ÞThe CrossGrid central server (not decided where it will be located yet) will include all internal releases and sources of Wp’s central servers

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC8 Infrastructure 3Package Repository ÞDistribution of the WP3 software ÞSource and binary RPM’s (The release version in Datagrid project are RPM files) ( ÞAcces via HTTP 3Support Tools ÞDocumentation (User Guide, Installation Guide,...) ÞContac list ÞBug/incident tracking system (Datagrid uses Bugzilla)

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC9 Test and Integration Process 3One idea is follow the Datagrid integration schedule ( : ÞTask3.5 Responsibilities VTask3.5 will provide a central, reliable, publicly accessible, backed-up CVS server (Just done by PSNC) VTask3.5 will also provide a central HTTP repository for the packaged source binary distributions of the WP3 software (???) VTask3.5 will also provide a central website from which support information can be obtained. (We have a WP3’s web page ÞSoftware tasks responsibilities VThe deliverables from each of the software tasks is expected in Month 10 (Task 3.5 Month ) VThe software tasks must provide the detailed specifications for any public package they provide or require. VIf the task software requires a specific operating system, architecture, compiler, etc., the task must provide this information

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC10 Test and Integration Process ÞIntegration team responsibilities VDefine package names to establish “standard” versioning rules among packages to be deployed with the Crossgrid software. VPrepare detailed schedule for when the Crossgrid sites will be expected to install the WP3 software. VDefine the “reference platform (operating system, kernel, packages)”. (Datagrid project support the software on Intel-based Linux platforms). VThe Integration team will begin to provide support to site administrators and to users when the WP3 software has first released. VFor bugs in the WP3 software, the user should submit a bug report. The bug-report will assigned to a member of the Integration team ( General proposition for the whole project VThe integration team will provide documentation, training, and direct support for system administrators who are installing the WP3 software ( General proposition for the whole project.

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC11 Test and Integration Process ÞIntensive Integration VThe WP3 software should be installed from the CVS server. VTo produce the first functioning beta-release of the WP3 software, all of the members of the integration team should be physically in the same place and having enough resources to build a small “grid”. (Datagrid project have two sites at CERN, one dedicated to develop and the other to production, Our where???). VEach of the partners should have in place a minimum set of machines with the basic software packages (Globus, datagrid,...) on top of which they’ll develop their own tools (This would be a local testbed, month 6 in the project Annex). Crossgrid will be a real distributed environment in opposite to Datagrid. But we need a TESTBED site (local cluster) to do the test and the integration, in order to put all WP3 software together, test it and deliver it. VThe integration team will continuously build, deploy, and test the WP3 software until a beta-release of sufficient quality is obtained. VThe Globus version 2.0 (alpha-15, beta-21) have been installed on two nodes at CERN and tested (Will we use the same version as them ??).

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC12 Time Schedule 3Preparation of schedule assuming first milestone is at month 12 (My point of view): ÞMonth 3: VDefinition of the software requirements (tools and services) for each task in WP3. VDefinition of the reference platform. VCVS central Crossgrid and WP servers available. VHTTP servers available. ÞMonth 6: VCo-ordination established with the other WP’s and Grid projects. VFirst local (in each site) testbed should be in place with the Datagrid’s tools installed, where each task develops and test their tools and services.

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC13 Time Schedule ÞMonth 10: VCollection of information from software tasks by the Integration Team. VSoftware tasks should begin releasing beta-version of code to the Integration Team. VBug-reporting system in place. VReference platform install in ???? To initial tests and integration. ÞMonth 12-15: VFirst prototype is delivered. VWebsite is populated with support names and contacts. VThe integration team will provide documentation, training, and direct supporting for system administrators who are installing the WP3 software.

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC14 Conclusions 3How the release version should be prepared? ÞSource code for the Datagrid can be obtained from a Central CVS Repository hosted by CC-IN2P3. This repository is intended primarily for developers. ÞAll software in Datagrid project is packaged as source and binary RPM files. VAll of the packages are available directly through a web interface either via direct browsing or via a formatted list. (wget -r -nd )

Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC15 Conclusions 3Who and how should test the tools in WP3? ÞWho: The Integration Team for the WP3 (Same in DataGrid project). VEach task must test its software before releasing code to Integration Team ÞHow: We need a site to do the test and integration to deliver a release version of WP3. VDataGrid project is centralising all the software at CERN and the Integration Team is ready to spend approximately three weeks at CERN during the intensive integration phase.