NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 MANAGEMENT OF HYDRO POWER PLANT TECHNICAL AND PERFORMANCE PROBLEMS PROPOSE BY PT.

Slides:



Advertisements
Similar presentations
Remedy Statistics April 2009 May 28th 2009 Paris Desktop Support Analysis only done with Remedy tickets (Incident-Task-Request) (GRS requests are not included.
Advertisements

W Geneva December, 2007 World Meteorological Organization Basics of Catastrophe Reinsurance.
JinkoSolar Holding Co., Ltd. Q Earnings Call Presentation June 7, 2013.
1 1 BRAZIL DAY 2008 October, Disclaimer This presentation may include forward-looking statements of future events or results according to regulations.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
STRESS NEXUS Olivier Gantois Société des Pétroles Shell ENERGY-WATER-FOOD.
THE BUSINESS RESEARCH COMPANY TECHNOLOGY CASE STUDIES.
Hedge fund flows on pace to nearly double 2012
Q Results. 2 Disclaimer This presentation does not constitute or form part of, and should not be construed as, any offer for sale of, or solicitation.
Following the CA, prudential supervision responsibilities will be transferred to the ECB and resolution responsibilities to the SRB Q H H.
Chapter 3 Project Initiation
Emerging Markets Dividends An Enduring Theme September 2012.
Innovations in Structured Products October 25, 2010 An Innovator’s Dilemma?
Petcoke Prices – Do They Relate to Anything? Ben Ziesmer McCloskey Group Petcoke Conference — 2008 Houston, TX June 10 & 11.
STRATCAP Introduces: Special Project ANAKLIA, GEORGIA 2011.
Unlocking value from existing utility assets NARUC Meeting – February 2012
THE BUSINESS RESEARCH COMPANY FINANCIAL SERVICES CASE STUDIES.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
R&R Consulting Approach
Session Objectives To introduce the Micro-Hydro Project Scope & Plan
FX market program for ranking market makers in EURUSD_TOM May 2014, Moscow Viktoriya Gulavskaya Head of trading technologies and market making.
THE BUSINESS RESEARCH COMPANY FINANCIAL SERVICES CASE STUDIES.
1 Russian Steel Industry Domestic growth and export capacities May 2011.
Mike Zenker Barclays Capital Research (415) November 12, 2007
The Business Research Company Financial Services Case Studies.
1 Efficient social investments in Russia: OAO Severstal experience Presentation by: Maria Medvedeva Head of External Communications.
HAPUA WORKING GROUP NO. 1: GENERATION (HWG1) 10 th Meeting on 26 th Feb 2009, Jakarta, Indonesia PROGRESS REPORT AND ACTION PLAN FOR 2009 BY MR. AHMAD.
PROJECT IDENTIFICATION AND FORMULATION
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
1 New standard in North Sea drilling operations..
Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1.
Title Slide – Option 1. Title Slide – Option 2 Insert Text.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
SCOPE THE PROJECT. Managing Client Expectations Client always seem to expect more than we are prepared to deliver. The expectations gap between client.
2008 I Page 1 Aladdin Oil & Gas Company ASA Positioned for growth EGM Oslo, November 2010.
Dunedin Enterprise Investment Trust PLC General Meeting – October 2013, Voting Analysis.
Economic & Market Recap May Equity and Fixed Income Markets.
W Geneva December, 2007 World Meteorological Organization Basics of Weather Risk Management.
Geothermal Fields On the Ring of Fire Prospect Developed Fields.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
Project Procurement Management
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
By PT. PLN Geothermal for Energy Business Forum of the 38 th Meeting of the APEC Working Group (Bali, November 17, 2009) 1.
NURHALIMA 1. Describe steps involved in the project initiation and planning process Explain the need for and the contents of a Statement of Work and Baseline.
2009 Coal Seam Gas Safety Forum Paul Zealand, Executive General Manager Upstream Oil & Gas Friday 14 August 2009.
Chapter 02 Professional Standards McGraw-Hill/IrwinCopyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.
E L E C T R I C I T Y F O R A B E T T E R L I F E INDONESIA Geothermal Power Plants in the 2 nd Phase 10,000 MW Project APEC ENERGY BUSINESS FORUM 17 November.
2 Copyright © 2014 Mahindra & Mahindra Ltd. All rights reserved. 2.
October 2012 Admission of professional participants – non-credit institutions to trading on the Moscow Exchange FX market.
1 The Power of Dividend Growth DISCLOSURE This information has been provided by RBC Global Asset Management Inc. (RBC GAM) and is for informational.
BP Global Environmental Products
RaboDirect Financial Health Barometer 2016
A Regional Hydropower Competence Centre
Payments in the Digital age
Summary of financial results for the period 1-12/2016
Presentation Title Sector First Last, Senior Analyst
Economic Analysis and Policy (EAP) Section Air Transport Bureau (ATB)
Kurt Adams EVP&CDO Restructuring Roundtable
Cambria Armor Dividend Strategy Cambria Armor Growth Strategy
Export snapshot October , 2018
Environmental Upgrade Finance
March, 30 – April 3, 2009, Honolulu, Hawaii
THE SAFE HARBOR STATEMENT UNDER THE US PRIVATE
OGK-2 Group 2018FY IFRS Results
OJSC «OGK-2» 3M 2013 IFRS Results May 27, 2013.
OGK-2 Group 3 months 2018 IFRS Results
TITLE Source: Footnotes:. TITLE Source: Footnotes:
© 2013 Sri U-Thong Limited. All rights reserved
Blueberry.
Manaila Polymetallic Mine
Presentation transcript:

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 MANAGEMENT OF HYDRO POWER PLANT TECHNICAL AND PERFORMANCE PROBLEMS PROPOSE BY PT INDONESIA POWER – a Subsidiary of PT PLN (Persero)-Indonesia

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 Title of Project : MANAGEMENT OF HYDRO POWER PLANT TECHNICAL AND PERFORMANCE Objectives : –Sharing information among member in the bilateral or multilateral cooperation on environmental issues surrounding Hydro Power Plant –Sharing information among member on regulation issue related with Hydro Power plant. –Having mutual benefit among member in the bilateral or multilateral cooperation on problem solving of technical issues –Having mutual benefit among member in the bilateral or multilateral cooperation on developing the Micro/ Mini Hydro Power Plant

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 BENEFIT : Members of HWG-1 could take information and experience from other members on : What are the environmental issues related with surrounding area of Hydro Power Plant How the Government regulation apply to Hydro Power Plant related with environmental issues How the management of Hydro Power Plant solve the technical problem on operation and maintenance, included in the catastrophe situation for example flood, land sliding, etc. Members of HWG-1 could invite other member to present their capability or to share their experience on specific topic Member of HWG-1 could invite Technical team to advise in solving a technical problem Member of HWG-1 could initiate in developing the Micro / Mini Hydro Power Plant in certain area under HAPUA Project.

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 Memorandum Of Understanding signed Preliminary Discussion Among Member Sharing information Identify issues Develop Frame Works of Program Do Feasibility Study Sharing information Identify issues Develop Frame Works of Program Do Feasibility Study Preparing the report to Project Coordinator of HWG-1 Preparing the report to Project Coordinator of HWG-1 Deliver to Project Coordinator HWG-1 For Approval to Council Deliver to Project Coordinator HWG-1 For Approval to Council DELIVERABLE, MECHANISM AND METHODOLOGY

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 OVERVIEW OF HYDRO POWER PLANT PT INDONESIA POWER

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 UP Perak Grati SPP & CCGT MW Jakarta Bandung Surabaya Semarang Grati Banjarnegara Installed Capacity 8,992 MW UP Kamojang Geothermal 375 MW UP Mrica Hydro MW UP Saguling Hydro MW UP Bali GT & Diesel MW UP Suralaya Steam Coal PP 3,400 MW UP Priok GT, CCGT & Diesel PP 1, MW UP Semarang CCGT & SPP 1, MW Lokasi Pembangkit di Jawa-Bali

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 Terima kasih

NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 Disclaimer : This report (including any information contained herein and any information, whether or whether not in writing, supplied in connection herewith) is strictly confidential. This report has been prepared by PT Indonesia Power (the “Company”) and is furnished to you solely for your information and may not be reproduced or redistributed, in whole or part, to any other person. This report contains certain forward-looking statements, including assumptions, opinions and views of the Company or cited from third party sources. Various known and unknown risks, uncertainties and other factors could cause the actual results, financial position, development or performance of the company to differ materially from the estimations expressed of implied herein. The Company does not guarantee that the assumptions underlying such forward-looking statements are free of errors, nor does it accept any responsibility for the future accuracy of the opinions expressed in this presentation or the actual occurrence of the forecasted developments. By accepting this report you acknowledge that you will be solely responsible for your own assessment of the market and the market position of the Company and that you will conduct your own analysis and be solely responsible for forming your own view of the potential future performance of the Company’s business.