Presentation is loading. Please wait.

Presentation is loading. Please wait.

Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1.

Similar presentations


Presentation on theme: "Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1."— Presentation transcript:

1 Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1

2 Disclaimer This presentation has been prepared by Resource Mining Corporation Limited (“RMC” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation. This presentation contains forecasts and forward looking information. Such forecast, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. RMC have not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, RMC make no representation and can give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation. You should not act or refrain from acting in reliance on this presentation material. This overview of RMC does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investments decision. 2

3 Wowo Gap – Nickel/Cobalt Project

4 Company Personnel Perth Management Team
Managing Director Mr Warwick Davies Exploration Manager Mr Mark Hill Chief Financial Officer Ms Julie Hill Senior Field Supervisor Mr Stanton Kennedy-Smith PNG Exploration Staff Exploration Geologist Mr Frank Mesak Site Supervisor Mr Francis Casper Field Supervisor Mr Kei Kei

5 Wowo Gap – Main Camp 5

6 Community Relations 100% of Niugini Nickel employees are PNG Nationals
NN supervisors and local labour hire personnel were trained to operate the drill rigs without the need for external contractors NN supervisors are trained to communicate with Perth office via the onsite computers and satellite systems NN funds health and education services to the villages that provide labour to the Wowo Gap Project. Direct benefits from the improved health service seen in the health and well-being of the local workforce.

7 Wowo Gap – Land Owners 7

8 Niugini Nickel Personnel
Field Supervisors Drilling Team

9 2010/11 Drilling Operations 9

10 Wowo Gap – Drill Core 10

11 Wowo Gap – 2010/11 Drilling Program
Improved Drilling Efficiency due to new drill method: 72 Diamond core holes in 158 Core holes in 2010 61 Core holes in 2011 10 km strike length tested to date

12 New Green-Tech Leaching Process
Discovery of New Acid Leaching Process The acid is a bio-renewable organic acid. The new process will extract Ni & Co from both the Limonite & Saprolite layers of the laterite resource It is likely that the new process will substantially improve the economic viability of the project

13 Wowo Gap – Moving forward in 2011
Update the Resource Estimation Continue metallurgical development of new organic acid leaching process Scoping Study to assess economic viability of the project using the new organic acid leaching process Training and education of local village people in hygiene practices to support good health, and medical assistance as required Training and education of local village people in Cassava farming in order to establish an income for the villages through the export of Cassava produce

14 Contact Details Warwick Davies Managing Director
Resource Mining Corporation Ltd 702 Murray Street, West Perth WA 6005 Ph: Fax: Web:


Download ppt "Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1."

Similar presentations


Ads by Google