Best Value Model Pre-Proposal Information RFP 2013-175 Rebecca Cohn Theatre Seating Renewal.

Slides:



Advertisements
Similar presentations
Performance Based Studies Research Group
Advertisements

1 SRP Multi Functional Printers RFP NO. SRP Multi Functional Printers RFP NO. FF320058FLC Kenneth T. Sullivan PhD, MBA Brian Stone MBA Performance Based.
Best Value PIPS PIPS: Perfromance Information Procurement System
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
Ensure Vendor/Engineer of Choice Product Quality
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Weekly Risk Report & Performance Metrics
Chapter 3 Project Initiation
IS4799 Information Systems and Cybersecurity Capstone Project
1 A six-pack of major RFP problems A Best Practices Training CD by Michael Asner
5/17/2015 Pre-Proposal Meeting Best Value Model. This presentation is being provided for educational purposes only Please refer to the RFP for specific.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
The Best-Value Business Model
Value Based Project Delivery: Best Value Business Model Kenneth T. Sullivan, PhD, MBA Arizona State University.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Attention to Detail in Competitive Procurements Prepared By: Steve Kramer and Chris Whyte Procurement All Hands July 2, 2013.
Best Value Business Model
Risk Assessment and Value Added Plans John Savicky Arizona State University May 2013.
Purchasing.
1 Best Value Project Model Kenneth T. Sullivan PhD, MBA Performance Based Studies Research Group School of Sustainable Engineering and the.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
City of Rochester 2 nd Street Upgrade 9/15/2015 Dean Kashiwagi, PhD, PE Jake Smithwick Arizona State University.
Performance Based Studies Research Group Pre Award Phase.
Performance Based Studies Research Group #SW092: Waste Management Contract.
This presentation is for Educational purposes only. The RFP will contain final instructions.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 6/25/2015 V2.
EXAMPLE – Quality Control Plan For Consultants
This presentation is being provided for educational purposes only Please refer to the RFP for specific instructions If there are any inconsistencies, the.
Introductions Brian Lines Arizona State University December 2013.
PROPOSING TO WRITE A PROPOSAL? BY PAPIA BAWA. What are Proposals? Long reports usually written in response to a specific request or in response to your.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Best Value Business Model Supplemental Pre-Proposal Information Video RFP : Part A Design-Build St. Joseph’s College Residence.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 16/25/2015 V2.
Best Value Fire Alarm RFP; Refer to RFP FG For Project Specifications.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
The Best Value Business Model Paul Dugal SCMP (C.P.P.), C.I.M. Manager - Purchasing Services University of Manitoba
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Performance Based Studies Research Group Pre Award Phase.
Overview John Savicky Arizona State University May 2013.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
Strategic sourcing is a Price Based approach to supply chain management that formalizes the way information is gathered and used so that an organization.
PIPS!!! Performance Information Procurement System.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
Performance-Based Contracting PIPS Performance Information Procurement System Jacob Charries Central Purchasing
A six-pack of major RFP problems
Principal Investigator ESTCP Selection Meeting
Fort Stanwix National Monument Energy Audit Contract
Office 365 Security Assessment Workshop
This presentation is being provided for educational purposes only Please refer to the RFP for specific instructions If there are any inconsistencies,
Waste Audit Education Session
Procurement Management
Award Management Services
Principal Investigator ESTCP Selection Meeting
Best Value Performance Information Procurement System (PIPS)
Define Your IT Strategy
Statewide Public Communications Services RFP#
Presentation transcript:

Best Value Model Pre-Proposal Information RFP Rebecca Cohn Theatre Seating Renewal

2 PBSRG’s Research Results Worldwide leader in Best-Value Systems  18 Years  210+ Publications  550+ Presentations  Projects  $5.7 Billion Services & Construction  98% Customer Satisfaction  Various Awards (PMI, NIGP, IFMA, COAA, IPMA)  Owners: Federal, State, Local, School Districts, Private

International Efforts & Partners Fulbright Scholarship- University of Botswana BV tests RMIT Teaching IMT PBSRG platform Tongji University 6+ years Infrastructure €1.8B plus €1B Brunsfield Complete Supply Chain United States - 65 clients Univ. of Manitoba Dalhousie Univ. Congo PPP Univ. of Alberta Simon Fraser Univ. Alberta Infra

4

InformationTechnology networking data centers hardware COTS software ERP systems help desk services eProcurement FacilityManagement maintenancelandscaping security service building systems industrial moving waste management energy management custodialconveyance pest control Health Insurance/ Medical Services Manufacturing Business / Municipal / University Services dining multi-media rights fitness equipment online education document management property management audiovisual communications systems emergency response systems laundry material recycling bookstoresfurniture Construction / Design / Engineering large gc infrastructuremunicipallaboratoryeducationhospitalfinancial large specialty small gc renovationrepairmaintenanceroofingdemolitiondevelopment supply chain DBBCMARDBIDIQJOC Low Bid IPD networking data centers hardware COTS software ERP systems help desk services eProcurement FacilityManagement maintenancelandscaping security service building systems industrial moving waste management energy management custodialconveyance pest control Health Insurance/ Medical Services Manufacturing Construction / Design / Engineering large gc infrastructuremunicipallaboratoryeducationhospitalfinancial large specialty small gc renovationrepairmaintenanceroofingdemolitiondevelopment supply chain DBBCMARDBIDIQJOC Low Bid IPD

This presentation is being provided for educational purposes only Please refer to the RFP for specific instructions If there are any inconsistencies, the RFP and Amendments shall take precedence over this presentation

7 Best Value Model Value-Proposition Cost, Capability, Value Goal: Differentiate Expertise

8 Best Value Model

NOT GOING TO CHANGE… Specifications Terms and Conditions Insurance & Bonding Contract Delivery System Pricing / Financials Process overlays on top of these… 9

10 Best Value Objectives Minimize risk of non-performance – Highest value for cost – Leverage Proponent expertise to optimize project delivery – Differentiate: key individuals and their plan to deliver the project – Become a client of choice Minimize the need for client management & decision making. – Ability to lay out optimal project plan – Identify what you need from the Client – Opportunity to maximize profit by being more efficient

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

Selection Objective Selection based upon Proponent Expertise How to differentiate expertise?  Ability to understand the project & plan your approach  Identify & mitigate risks to the project  Add value to optimize project  Cost Competitive

CriteriaWeightCommittee Rating Numerical Value Product – Seat Sample25 Risk Assessment15 Value Added15 Past Performance Info5 Price20 Interviews20 TOTAL100 pts Evaluation Criteria 13

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

Written Submittals Risk Assessment Risk Assessment Value Added Simpleconcise Simple, concise, actionable plans = risks to project delivery = proposed options beyond requirements Allows Proponents to differentiate themselves based upon their ability to identify and minimize risks to the project.

16 Risk Assessment Identify project risks (that could keep the project from being successful) Explain why the risk is a risk Emphasize risks that you DO NOT control Should be a risk specific to the current project Identify your solution to minimize the risk Lay out your plan to prevent or minimize each risk from impacting the project Opportunity to demonstrate your capability to execute the project Prioritize in order of importance

Risk Assessment 17 Template 2 pages max.

Value Added Propose options that may benefit the owner – Beneficial impacts may be to: cost, schedule, quality & customer satisfaction, maximize future revenue – Indicate if the option has a proposed cost impact – If no cost impact – document as “$0” Value Added options are NOT included in the base proposal cost. – Opportunity to meet the University’s intent better than what is specified

Why Value Add Plan? at below budget 1.Provide ways to keep project at or below budget – Modifications to requirements to meet budget – Specific cost ($) savings 2.Increase customer satisfaction / performance

Scope is Above Budget Owner’s Budget ($$) Owner’s Scope (-$ value add)

Intent Doesn’t Match Scope Owner’s Budget ($$) Owner’s Scope Owner’s Intent (+$ value add)

Value Added 22 Template 2 pages max.

23 Format of Submittals In order to minimize any bias, the Submittals must NOT contain any names that can be used to identify who the proponent is (such as proponent name, personnel names, project names, etc). Template are provided and must be used. Proponents are NOT allowed to re-create, re-format, or modify the templates. DO NOT include any product pictures The plans should not contain marketing material. The Risk Assessment must NOT exceed 2 pages. The Value Added most NOT exceed 2 pages

Examples 24 Risk Assessment

25 Plan 1 – We will work with the user to minimize the impact of noise from demolition. Plan 2 – We have planned to demolition during off hours and weekends. This will have a slight impact on our cost (less than 1%), but the impact to customer satisfaction justifies this. – We will also install rubber sheets on the floors to diminish noise and vibrations. – Both solutions can be performed within your budget. – Both solutions have been used on multiple previous projects w/ high levels of customer satisfaction (9.4/10). Example of Solutions Risk: Noise from Demolition Type: Risk Assessment MARKETING INFORMATION

Plan 1 – The owner can be assured that the budget is not a risk due to our 20+ years of expertise in delivering similar buildings and our experienced project team is prepared to ensure the budget it met. Plan 2 – The Owner’s budget is not able to accommodate the building program per the statement of requirements. – We have identified multiple value added options that enable us to meet the budget and still deliver the required number of beds (in order to maximize owner revenue streams): Removal of underground parkade (note: impact to owner revenue) Reduction in level of finishes (specific wall panels vs. dry wall) Design efficiency opportunities: Adjust net to gross ratios in targeted areas of building program (hallways, common spaces). Reduction in building footprint results in significant material savings. 26 Example of Solutions Risk: Owner’s Budget (DB Residence Hall) Type: Risk Assessment

Plan 1 – Coordination with [water company] is critical. We will coordinate and plan with [water company] as soon as the award is made to make sure that we get water to the site to irrigate the fields. Plan 2 – We will coordinate and schedule the water with [water company]. However, based on past experience there is a high risk they will not meet the schedule (the water company does not meet schedule over 90% of the time). – We will have temporary waterlines setup and ready to connect to the nearby fire hydrant to irrigate until [water company] is ready. – We will also have water trucks on-site if there is problems with connecting the lines. Example of Solutions Risk: Getting water to the site Type: Risk Assessment

Examples 28 Value Added

Base Price vs. Value Added Base Price submission = to meet the client’s specifications / requirements – “Apples to Apples” procurement Value Added – proposed innovation / additions / alternates 29

Example of Value Added

31 Example: Value Added Items Reroofing this building will not stop all water leaks. The majority of the leaks are caused by cracks in the parapet walls, broken/missing glass, and poor caulking. For an additional $20K and 3 weeks in schedule we can replace and repair all of these items.

32 We are Looking for Proponents Who Can Think Ahead… …And Act In The Client’s Best Interest

33 Things to Avoid Marketing Information: – Our company is known worldwide as a leader in online education. – We will use our long history to make sure the project is a success. – We will use state-of-the-art process to make it a success. Transferring risk back to client: – We will work with the owner to resolve issues – We will have team meetings / partnering meeting with the owner General risks and/or general solutions: – We will plan ahead to coordinate activities – We will plan ahead to get classes scheduled and created Overly Technical data: – The system we propose has 200% increase in PRX bandwidth modularity.

Submittal Requirements Submittal DocumentMaximum Page Length Risk AssessmentTwo (2) pages Value AddedTwo (2) pages 34 NOT Must NOT contain ANY identifying information (names, company names, project names, product names, etc.) Must use the provided template (can submit as many risks as fit within the 2 page limits of each submittal) List Risks in order of priority

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

Past Performance Information Collected For:  Company / Firm (as the Proponent) – 3 max  Key Personnel  Project Manager (financial) – 3 max  Site Superintendent (on-site lead) – 3 max The Proponent picks their own references The Proponent collects all surveys Close out ratings at the end of the contract will be used to update PPI scores for future projects. 36

37 PPI Survey / Questionnaire

38 PPI Process The Proponent is responsible for sending out a survey questionnaire to each of their past clients. The survey must be faxed/ ed back to the Proponent The Proponent will submit all surveys to the Owner with their submittal. Setup and send Survey Forms Past Client Evaluates and Returns Vendor Past Client Vendor Proponent

39 Example Survey (Firm and Individuals) Proponent Past Client Proponent Past Client

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

41 The Evaluation Process Submittal Evaluation Members Proposal Form (1 page) Proposal Form, $, PPI, Other Documentation Proposal Form (1 page) Risk & Value Product Sample Total Score Contracting Officer Contracting Officer

Shortlisting If necessary short listing will be conducted prior to interviews (depending on the number of Proponent) Interviews: – Project Manager – Site Superintendent * May be the same person

43 Interview Format Q&A Interview, NOT a presentation Individuals will be interviewed separately. A standard set of questions will be generated and asked to each individual. Typically interview times will last about minutes per individual No substitutions will be allowed.

Best Value Interviews: Identifying Expertise Examples of questions asked: 1.Why were you selected for this project? 2.How many similar projects have you worked on? Individually and as a Team? 3.Describe a similar project you have developed/worked on to the current project. 4.What is different about this project from other projects that you have worked for? 5.Draw out the process for this project by major milestone activities. 1.Identify, prioritize, and how you will minimize the risks of this project. 2.What risks don’t you control? How will you minimize those risks? 3.What do you need from the client and when do you need it? 6.How are you going to measure your performance during the project? 7.What value do you bring to the project in terms of differences based on dollars, quality, expertise, or time? 8.Other questions regarding the RFP requirements 44

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

Simple Scoring Methodolgy 46

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

48 Dominance Check & Cost Reasonableness Best-Value is the lowest price Best-Value is within [10%] of next highest ranked firm Best-Value can be justified based on other factors Best-Value is within budget Yes No Yes Best Value Prioritization Best Value Prioritization Yes No Go with Alternate Proposal or Cancel Proceed to Pre-Award Yes No Yes No Proceed to highest ranked proposal within budget

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ NOT Detailed Detailed

Planning Objectives Period of time allotted before work begins for the Proponent to: Lay out & clarify the plan. Coordinate milestone schedule. Identify the risks that could cause the plan to deviate. – FORMALLY DOCUMENT risk management plans. – Address all client concerns. – Identify what you don’t know & when you will know it. Identify what you need from the client and have a plan for getting it Outcome: completely aligned expectations for project delivery

51 Clarification / Preplanning Period

Start Very High Level Cost Verification Included in Proposal Excluded from Proposal Major Assumptions Major Client Risks/Concerns High Level Project Work Plan Client Risks/Concerns PA Schedule Uncontrollable Risks Response to all risks Roles and Responsibilities Value Added Ideas Coordination Review Functionality Technical Level Performance Reports / Metrics Additional Documentation Technical Details Project Schedule High level demos PA Document End

Risk Management Plan Format: Risk description & background If the risk occurs, what will be done to minimize its impact What are the potential risk impacts if the risk does occur? – Cost – Schedule – Approach 53

Filter 1 Proposal Evaluations Filter 2 Interview Key Personnel Filter 4 Cost Reasonableness Check Filter 5 Pre-Award & Clarification Project Execution Risk Reporting & Close Out Rating Filter 3 Prioritization (Identify Best Value) Contract Award Evaluation Criteria - Price - Risk Assessment - Value Added - Past Performance Information (PPI) - Product Sample Short List prior to Interviews (if necessary) Pre Award Activities - Training - Kickoff Meeting - Plan & Clarify - Summary Meeting Total Evaluation Scores are determined Financial check to confirm Selection of the potential Best Value Proponent Project Execution -Weekly Risk Report - Performance Meas. - Close Out Rating Best Value Process Copyright Arizona State Univ

55 Weekly Risk Report Excel Spreadsheet that tracks risks and impacts Client will setup and send to vendor once the Award is issued. ASU will provide additional training. The final project rating will be impacted by the accuracy and timely submittal of the WRR

56 Unforeseen Risks PERFORMANCE SUMMARY Vendor Performance Client Performance Individual Performance Project Performance RISK MANAGEMENT PLAN Risk Schedule WEEKLY REPORT Risk Unforeseen Risks Measurement of Deviation from the Expectation Management by Risk Minimization

Questions? 57