TYNDP 2013-2022 SJWS #2 Security of Supply – Market Integration TYNDP 2013-2022 – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Market Integration & SoS Updated proposals for SJWS #6 ENTSOG offices – Brussels Stakeholder Joint Working Session – 26 April 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
1st Ten Year Network Development Plan: ERGEG opinion
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
1 Antonio Soria Head of Unit Economics of Energy, Climate Change and Transport Institute for Prospective Technological Studies Joint Research Centre European.
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
CBA Results Files Getting started. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
CBA Results Files Analysing the results. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
TYNDP SJWS #1 Infrastructure Projects -- Supply & Demand TYNDP st SJWS 24 January 2012 ENTSOG offices -- Brussels.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
TYNDP concept SJWS #7 – conclusion on TYNDP concept TYNDP Stakeholder Joint Working Session – 29 May 2012.
TYNDP SJWS #5 Demand & Supply – Infrastructure Projects TYNDP – 5 th SJWS 20 April 2012 ENTSOG offices -- Brussels.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
How to attract funds for storage investments? Andrea Stegher GSE Vice-President & Chairman of Security of Supply and Investment WG GIE Annual Conference.
Mr Martin Crouch, ERGEG Electricity Regulatory Forum 2009 Florence, 5 June 2009 Status Review of Sustainable Development in the Energy Sector.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Cost-Benefit Analysis Economic Performance Indicators TYNDP/CBA SJWS 6 – 13 May 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Long-term modeling of resilience and flexibility of European gas transportation system: integrated factors Dresden, April 3, 2009 Vitaly Protasov, Expert,
Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2009, Groningen.
Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
A Perspective on Infrastructure and Energy Security in the Transition 3 rd of March 2016.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
South Region Second Edition
10 year investment plan ERGEG approach and contribution
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
40th IG meeting 29th November 2016
Gas Regional Investment Plans
Background and Process
Gas Regional Initiative
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
TYNDP: Ten-Year Network Development Plan 2016
Gas Regional Investment Plan North West
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
40th IG meeting 29th November 2016
Problems identified by NRAs
Projects of Common Interest
Market integration Security of supply Competition
Problems identified by NRAs
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
July update JANUARY 2019.
Projects of Common Interest
Presentation transcript:

TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels

Assessment of gas system resilience Role of TYNDP in gas system resilience > Design of the European gas system results from national primary and secondary legislation and long term capacity commitments > Further need for investment (potential gap) depends on resilience expectation and considered supply/demand scenarios expressed by stakeholders > TYNDP aims at providing meaningful input to decision-makers about potential need for additional investment and not at directly planning projects Inputs from SJWSs will be factored in future EIP development > TYNDP and Cost Benefit Analysis have already many converging features: Scenario definitions Indicators defining the level of Market Integration and SoS A network and market model > TYNDP SJWS can be used as an incubator for the development of a CBA by ENTSOG. But further development will require more visibility and stability of the legislative process 2

Security of Supply resilience assessment in TYNDP

Security of Supply resilience assessment European vision > Top-down assessment of the Security of Supply resilience of the European gas infrastructure > ENTSOG TYNDP considers the impact of major events (climatic, disruption…) from a European perspective on the highly meshed European gas network > This top-down approach shows how adjacent systems may influence/support each other TYNDP scope > Current report is based on a Reference Case (high daily demand broadly equivalent to a 1-in-20 day) and measuring the variation in flow pattern and supply when facing: a technical, transit or supply disruption a lower deliverability of storages > Considered events have been selected according to their potential impact and occurrence 4

SoS - What is in the TYNDP Main report: gap and remedy identification > Each SoS simulation is the result of following parameter combination: 2011 / 2015 / 2020 FID / non-FID Reference Case / Disruption / UGS low deliverability > A graphical representation of investment gaps is provided when a country remaining flexibility is below: 5% under Reference Case 1% under disruption or UGS low deliverability > Congested infrastructures and submitted projects helping to mitigate the gaps are identified within the report Annex E > Nevertheless load factor of each individual project may be estimated using the remaining flexibility provided for projects in Annex E for most scenarios 5

Graphical representation before disruption 6

Graphical representation during disruption 7 TYNDP intends to identify the disrupted areas (blue doted line) defined by complete upstream cross-border congestion (red arrows). Flow pattern within the area would need further investigation taking into account more parameters such as demand-side measures

Information provided within the report 8 Ukrainian disruption (additional investment gaps to the Reference Case) BG<1%Reg. Cong. Global improvement due to AT & SK > HU <1% HR<1%Reg. Cong.<1% FY<1%Reg. Cong.<1% GR<1%BG & TK > GR<1% HU<1%AT & SK > HU<1% RO<1%Reg. Cong.<1% RS<1%Reg. Cong.<1% Total High Daily demand for the region defined by all above countries is covered by 70% with existing infrastructure plus FID and by 75% with addition of non-FID projects. Individual country’s supply demand balance cannot be assessed in this TYNDP due to the current lack of criteria. With non-FID projects (AT to HU capacity increase) remaining flexibility for Austria is inferior to one per cent but still enable to cover the whole demand. Numerical information within main body and non-FID project load factor within Annex E

SoS - Received feedback 9 Opinion on selected scenarios − Interruption of more than one source could be considered − Internal technical failure (such Transitgas) should be investigated − Reference to possible regional political turmoil may benefit the overall TYNDP − Low availability of storage in the end of the winter could be considered − More detailed analysis of the selected scenarios would be welcomed − Scenarios are appropriate and should be used in next edition in order to assess the improvement − Additional scenarios could derive from REG-SOS Resilience indicator − Remaining flexibility is a meaningful indicator − The arrival of a new supply should reduce the share of the existing one − Embedded diversification of LNG should be considered

Market Integration assessment in TYNDP

Market integration assessment A concept still to be defined > Market Integration covers many aspects and a clear definition is needed in order to be able to quantitatively assess European gas infrastructures > Assessment on a 10-year range requires a resilient methodology based on robust criteria (direct use of supply and transmission prices is not enough reliable when considering potential variation in level and structure) First European level assessment > ENTSOG considered supply diversification as a strong underlying factor of price convergence which is often quoted as a Market Integration indicator (still not a sufficient condition) > Market Integration has to be assessed under everyday circumstances > This assessment has been carried out under: A supply perspective: how far a source can send gas A demand perspective: how many sources a country can have access 11

Market Integration - What is in the TYNDP Main report: spread, diversification & limitation identification > Assessment is carried out on an average day (annual demand and supply divided by 365 being consistent with April or October days) > Each SoS simulation is the result of following parameter combination: 2011 / 2015 / 2020 FID / non-FID Reference Case / Predominant supply (each import source one by one) > A graphical representation of supply spread is provided with 3 ranges of supply shares: Above 20% Between 5 and 20% Below 5% > A view is provided from a country perspective showing the progression in supply diversification of each country 12

Supply source even spread in 2015 (FID) 13 LNGNorway Russia AlgeriaLibya

Source accessibility for end-consumers 14 # countries having potential access (5% share) to at least 3 sources: 38%55% 62% 86% Number of alternative potential sources

Market integration resilience 15 Opinion on selected scenarios − Approach is okay − Even physical spread of supply may not be always appropriate Resilience indicator − Supply share should be considered even if less than 5% − Percentage could be higher − The arrival of a new supply should reduce the share of the existing one − 3 sources above 5% is a good and already ambitious target for some markets − Embedded diversification of LNG should be considered − Modelling should assess if each potential supply can be transported through EU and the potential gap on its path to the end-consumer − TYNDP should identify infrastructures required to have equal capacity level on both side of each IP − Indicator should be updated according Target Model potential output − TYNDP should identify the infrastructure gaps hampering a full use of facilities

16 Thank You for Your Attention ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels T: WWW: