Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Chapter 24 Quality Management.
Chapter 6 Cost and Choice. Copyright © 2001 Addison Wesley LongmanSlide 6- 2 Figure 6.1 A Simplified Jam-Making Technology.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Page 1 Approximately Maximum Bandwidth Routing for Slotted Wireless Ad Hoc Networks Approximately Maximum Bandwidth Routing for Slotted Wireless Ad Hoc.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
for Cabin Safety Inspectors
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
*Opinions expressed in this presentation are the authors only and not necessarily those of Banco de México. 1 Are Loan Guarantees Effective? The Case of.
FANS (Future Air Navigation System) Flight Crew Procedures
Module N° 7 – Introduction to SMS
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OHA CARE-ASAS Activity 3: ASM Autonomous Aircraft OHA.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
STATISTICAL INFERENCE ABOUT MEANS AND PROPORTIONS WITH TWO POPULATIONS
Site Safety Plans PFN ME 35B.
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
© 2010 The MITRE Corporation. All Rights Reserved. Sector Capacity Prediction for Traffic Flow Management Lixia Song April 13 th, 2010.
Slide 1 ILLINOIS - RAILROAD ENGINEERING Railroad Hazardous Materials Transportation Risk Analysis Under Uncertainty Xiang Liu, M. Rapik Saat and Christopher.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Transition Towards Free Flight: A Human Factors Evaluation of.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Designing for Safety: the Free Flight ATM concept Jacco Hoekstra.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Overview of NLR Free Flight project ‘97 - ‘99 Jacco Hoekstra
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Free Flight Deck Society of Automotive Engineers (SAE) S-7, “Flight.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
Checking & Corrective Action
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
ASAS Thematic Network Workshop #2: TAGA - Traffic Awareness for General Aviation DFS Research and Development October 2003 TAGA - Traffic Awareness for.
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
Squares and Square Root WALK. Solve each problem REVIEW:
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
Addition 1’s to 20.
25 seconds left…...
Procedure Design Considerations
Week 1.
We will resume in: 25 Minutes.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
Dantzig-Wolfe Decomposition
©2006 Prentice Hall Business Publishing, Auditing 11/e, Arens/Beasley/Elder Audit Sampling for Tests of Controls and Substantive Tests of Transactions.
Introduction to Ad-hoc & Sensor Networks Security In The Name of God ISC Student Branch in KNTU 4 th Workshop Ad-hoc & Sensor Networks.
Safety / Performance Criteria Agreeing on Assumptions 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Chapter 1 Linear Equations and Linear Functions.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OHA CARE-ASAS Activity 3: ASM Time-Based Sequencing OHA.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OSED CARE-ASAS Activity 3: ASM Time-Based Sequencing OSED.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASSTAR Oceanic Session Summary
Presentation transcript:

page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations

page 2 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Objective and tasks Objective: Getting insight into safe separations for ASAS- based operational concepts, e.g. Autonomous Aircraft Tasks: Identify hazards due to AA-OHA-identified mitigation measures and subsequent AA-OSED scenario refinement Estimate safe separations for Autonomous Aircraft application as defined in AA-OSED

page 3 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Hazards due to mitigating measures Introduction of Safety Requirements identified by AA-OHA may lead to new hazards Brainstorm: 55 (unanalysed) hazards / non-nominal situations, e.g. Crew starts solving conflict before priority is determined Everybody can listen in on VHF, even far away Aircrew unaware of loss of communication (think its just quiet) Confusion about position communicated by voice (no language to explain where you are since no waypoints in FFAS) No time to update FMS during emergency, hence no intent data is transmitted Aircrew decides not to leave FFAS in emergency (leaving may be more dangerous than continuing same flight path)

page 4 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Estimating safe separations - content Approach Results Conclusions

page 5 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Estimating safe separations - approach Accident risk assessment methodology TOPAZ Approach 1: for completely new concepts Approach 2: variations on an evaluated concept Use existing model (DCPN) for reference application that resembles target application Risk assessment based on reference DCPN model, completed by uncertainty assessment Risk assessment of target application, based on reference DCPN-based risk, and on effect of differences between target and reference operational concept

page 6 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 From reference DCPN to AA concept XFF* operational concept AA operational concept AA* operational concept XFF* DCPN model II III I

page 7 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Bias & uncertainty of steps I and II Method developed as part of TOPAZ methodology (Everdij and Blom, 2001) Assess accident risk for Operational Concept in terms of Model-based accident risk The risk bias and uncertainty due to all assumptions adopted Outline of method: Identify all assumptions adopted Assess all assumptions one by one on risk bias and risk uncertainty During assessment of each assumption, take into account all previously assessed assumptions

page 8 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Estimating safe separations - content Approach Results Conclusions

page 9 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Reference operational concept Three candidates from TOPAZ information management system are ASAS-like One of these three considers broadcast of aircraft intent information: Extended Free Flight (XFF) RNP1 (VOR/DME) ADS-B (state and intent) Flight path conformance monitoring (own and other) Conflict probe (between flight plans) Short term conflict detection and resolution No ACAS Risk assessment of XFF limited to two opposite direction parallel lanes on same flight level: XFF*

page 10 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Encounter scenario considered S S' S: Distance between lane centrelines S: Separation minimum First vary S, then S

page 11 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Reference risk-separation curve

page 12 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 I: Differences XFF*-DCPN and XFF* Numerical approximation assumptions Identification by experts in the numerical evaluation of the XFF*-DCPN (7 x) Parameter value assumptions Identification by inspection of DCPN model description (70 x) Model structure assumptions Identification by experts of the XFF*-DCPN (23 x) Non-coverage of hazards assumptions Identification by experts of the XFF*-DCPN (22 x) Sources: OHA, WP3 brainstorm, TOPAZ Information Management System

page 13 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 I: Risk effect

page 14 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 II: Differences XFF* and AA* Navigation: XFF* has VOR/DME; AA* has GPS Medium term conflicts: XFF* has CP at 5 min; AA* has priority assignment at 10 min, alert at 5 min, and uses R/T if necessary Short term conflicts: AA* has independent surveillance alert Consistency checks SA intent and state other a/c: XFF* has FPCM for other a/c and increases separation in case of alert; AA* does not have FPCM Consistency checks SA intent and state own a/c: XFF* has FPCM for own a/c; AA* does not have FPCM Use of CDTI: In XFF* crew are not required to monitor; in AA* they are Emergency procedures: In AA*, a/c are alerted in case of emergency of own and other a/c, periodically broadcast position by R/T and leave FFAS.

page 15 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 II: Risk effect

page 16 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 XFF*-DCPN, XFF* and AA* results

page 17 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 III: Differences between AA* and AA Step from fixed route structure to free routes Frequency of aircraft encounters is reduced significantly Positive effect: risk figures improve linearly with number of encounters Complexity of the traffic flow is increased significantly No problem for pilots (Hoekstra et al, 2000) Other effects Semi-circular usage: opposite flying aircraft at different flight levels

page 18 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Estimating safe separations - content Approach Results Conclusions

page 19 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Conclusions (1/2) Model-based approach: gain insight into complex matter of estimating safe separation minima Approach used followed two steps: Select existing model similar to AA, evaluate model-based risk Do a bias and uncertainty assessment that explains differences between model and AA concept Results of model-based risk assessment: XFF*-DCPN model based risk intersects target level of safety at S = 7 Nm, and S = 5 Nm Results of bias and uncertainty assessment: XFF* and AA* expected risk factor 1.6 and 3.5 higher than XFF*- DCPN model risk 95% credibility interval: factor 5 up and down

page 20 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Conclusions (2/2) Improve operational concept Combine complementary strong points of AA and XFF (e.g. FPCM, mitigating measures for key hazards) If successful then improve RNP, e.g. RNP0.5 Extend DCPN model and evaluation Develop DCPN model for XFF/AA concept Reduce level of subjectivity of bias and uncertainty judgements First, evaluate outcome of these options with others