DFS Deutsche Flugsicherung GmbH Elmar Kallas, 05.10.1999 -1- DFS on the move to very advanced V ery A dvanced F DP O perational R equirements I mplemen.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Basic Principles of GMP
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Advanced Piloting Cruise Plot.
1 GENERALIZED LAND-USE EVALUATION AND MANAGEMENT TOOL (GLEAM): Program Evaluation William G. Brooner, Consultant Montreal, Canada November 17 – 20, 2003.
Managing Compliance Related to Human Subjects Research Review Joseph Sherwin, Ph.D. Office of Regulatory Affairs University of Pennsylvania Fourth Annual.
Chapter 6 Cost and Choice. Copyright © 2001 Addison Wesley LongmanSlide 6- 2 Figure 6.1 A Simplified Jam-Making Technology.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 09/10/02 WG12 Software Primer For RTVIS Committee September 10, 2002.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Welcome Safety Regulatory Function Handbook April 2006.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
The Implementation Structure DG AGRI, October 2005
SIP/2012/ASBU/Nairobi-WP/19
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
October SACTA/FOCUCS MTCD EXPERIENCE IN AENA Memphis FAA/EUROCONTROL R&D Ignacio Núñez.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Making the System Operational
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Configuration management
Software change management
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Effective Contract Management Planning
Testing Workflow Purpose
ABC Technology Project
Describing Complex Products as Configurations using APL Arrays.
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
Checking & Corrective Action
Squares and Square Root WALK. Solve each problem REVIEW:
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Requirements Analysis Moving to Design b521.ppt © Copyright De Montfort University 2000 All Rights Reserved INFO2005 Requirements Analysis.
Lecture 8: Testing, Verification and Validation
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
Test B, 100 Subtraction Facts
©Ian Sommerville 1995/2000 (Modified by Spiros Mancoridis 1999) Software Engineering, 6th edition. Chapters 1,3 Slide 1 Software Engineering Software Engineering.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation (Adapted) Object-Oriented Systems Analysis and Design Joey F. George, Dinesh.
PDG IMPACT, Kallas, Frers/ WIPO_IPC_8_User view.ppt PDG IMPACT IPC Reform – User‘s view PDG IMPACT Working Group IPC Forum Open Day, February.
Project Methodology May 2, System Development Life Cycle Overview.
Presentation transcript:

DFS Deutsche Flugsicherung GmbH Elmar Kallas, DFS on the move to very advanced V ery A dvanced F DP O perational R equirements I mplemen T ation Development Process

DFS Deutsche Flugsicherung GmbH Elmar Kallas, VAFORIT scope schedule evolutionary prototyping verification & validation development and simulation environment adaptation of P1 ATCAS, operational environment functional aspects to be delt with in second part of presentation by Mr. Willenbockel Contents

DFS Deutsche Flugsicherung GmbH Elmar Kallas, VAFORIT EVA FDPSFDPS P1-V Overview

DFS Deutsche Flugsicherung GmbH Elmar Kallas, VAFORIT FDPS Functionality

DFS Deutsche Flugsicherung GmbH Elmar Kallas, VAFORIT Schedule

DFS Deutsche Flugsicherung GmbH Elmar Kallas, Results: Requirements shall be implemented in steps according to operational priorities; Prototype, that complies with the VAFOR Requirements, ready for operational use Minimisation of risks by means of: Transparency in the realisation process Implementation of necessary amendments and corrections of system specifications Early validation of compliance to operational concepts Target date: Ready for site implementation about 2003 Evolutionary Prototyping

DFS Deutsche Flugsicherung GmbH Elmar Kallas, ) Verification of Build 1 ( FAT ) 2) Validation of Build 1 3) Verification of Build 2 (FAT) 4) Validation of Build 2 5) Technical and operational Evaluation of VAFORIT FDP and HMI in P1 Environment AFS Environment Evaluation Phases Of The Prototype oper. Environment

DFS Deutsche Flugsicherung GmbH Elmar Kallas, DRF-VPV (1) DAT FAT Configuration Development / FAT Environment

DFS Deutsche Flugsicherung GmbH Elmar Kallas, test of the system with special attention to the needs and expectations of the user use of the DFS Advanced Function Simulator (AFS) in Langen, responsibility by DFS additional simulation independent of INDRA simulation stepwise performed for Build 1 and 2 improvements & optimizations implemented in the software and regression tested Validation

DFS Deutsche Flugsicherung GmbH Elmar Kallas, FDPS HMI P1 P1 Additions P1-V EVA VAFORIT SSS C.X+1 SSS C.5 P1/ATCASP1/VAFORIT SSS C.X SSS: System Segment Specification P1 Integration

DFS Deutsche Flugsicherung GmbH Elmar Kallas, P1 Integration Process

DFS Deutsche Flugsicherung GmbH Elmar Kallas, first site yet to be defined infrastructure at our sites allow installation of the VAFORIT system in parallel to running system shadowing operation in order to gain credibility intensive training due to changing procedures controllers that were involved from the beginning will function as trainer Some transition aspects

DFS Deutsche Flugsicherung GmbH Elmar Kallas, Major Milestones P1-V Contract AwardI /2000 EVA Contract AwardII/2000 FDPS Design readyIV/2000 FDPS Build 1 FATIII/2001 FDPS Build 1 SATIV/2001 P1-V FATIV/2001 EVA Build 1 validatedIV/2002 FDPS Build 2 SATIV/2002 EVA Build 2 validatedIV/2003 Integration of FDPS/EVA/P1-VIV/2003

DFS Deutsche Flugsicherung GmbH Elmar Kallas, BACK-UP Folien

DFS Deutsche Flugsicherung GmbH Elmar Kallas, Stepwise implementation and Installation of a future Flight Data Processing System (FDPS) according the requirements defined in the VAFOR document. Definition and Realisation of a future HMI for strip-less operations. Integration with the ATS System P1. Realisation of P1-V (Adaptation of P1 in VAFORIT) PBR 3 February 1998 Steering Group July 99 VAFORIT Goals

DFS Deutsche Flugsicherung GmbH Elmar Kallas, D Trajectory Prediction Automatic System Co-ordination (OLDI 2.2) Flight Progress Monitoring Medium Term Conflict Detection Identification by Mode S-Data (Elementary Surveillance) Support of the DFS Sector Concept Flexible use of airspace Support strip-less operations more open architecture (NOS-CORBA Gateway) Focus is going to move to planning tasks Highlights of VAFORIT FDPS Step 1

DFS Deutsche Flugsicherung GmbH Elmar Kallas, Major Milestones (Build 1)

DFS Deutsche Flugsicherung GmbH Elmar Kallas, Major Milestones (Build 2)

DFS Deutsche Flugsicherung GmbH Elmar Kallas, D Trajectory Prediction; System supported co-ordination level 1 (OLDI 2.2); Flight progress monitoring; Medium Term Conflict Detection; Flight identification based on Mode S data (Elementary Surveillance). Support new DFS sector concept; Support flexible use of airspace; Support of stripless operations. Major Fuctions In Step 1

DFS Deutsche Flugsicherung GmbH Elmar Kallas, objective: technical and operational requirements responsibility: contractor (INDRA) stepwise performed for Build 1 and 2 use of the test environment of INDRA acceptance by FAT Verification

DFS Deutsche Flugsicherung GmbH Elmar Kallas, ) RadarData Processing System, 2) Database Management System, 3) Control and MonitoringDisplay 4) SystemMonitoring and Control, 5) Data Recording Facility, 6) Flight Data Processing, 7) Flight Data Display 8) Flight Data Assistant, 9) SituationData Display, 10) Eurodisplay Very Advanced P1 Components which have to be changed: - RDPS 1), DMS 2),CMD 3) & SMC 4),DRF 5) The VAFORIT system will substitute the following P1 components: - FDP 6) ( VAFORIT), FDD 7) ( FDA 8) ), SDD 9) ( EVA 10) ) Development parallel to other P1/ATCAS Releases Development in 2 releases –release 1 = Integration with FDPS and EVA; –release 2 = Incorporating further developments of the P1/ATCAS release-developments) Scope Of P1-V

DFS Deutsche Flugsicherung GmbH Elmar Kallas, P1 Integration Process

DFS Deutsche Flugsicherung GmbH Elmar Kallas, P1 Integration - Process