Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 09/10/02 WG12 Software Primer For RTVIS Committee September 10, 2002.

Similar presentations


Presentation on theme: "1 09/10/02 WG12 Software Primer For RTVIS Committee September 10, 2002."— Presentation transcript:

1 1 09/10/02 WG12 Software Primer For RTVIS Committee September 10, 2002

2 2 09/10/02 Software Development Cycle

3 3 09/10/02 Issues Duplicate information contained in multiple standards –IEEE 730 Quality Assurance –IEEE 830 Requirements Specification –IEEE1016 Design Description Conflicting customer requirements such as references to these standards in the same specification: –ATA 102 Software Manual –IEEE J-Std-016 Software User Manual

4 4 09/10/02 Issues Duplicate standards –EIA/IEEE J-Std-016 –EIA/IEEE 12207 These documents contain similar requirements that are listed in different sections. Some differences between these standards 12207 finally superceded J-Std-016

5 5 09/10/02 Issues IEEE 12207 combined many requirements into one document but other documents still exist or are under active review. Withdrawn documents –1074.1Life Cycles (see 12207) –1348CASE Tools

6 6 09/10/02 Issues Active Working Groups –610Terminology –730.1Quality Assurance (SQAP) –828Configuration Management (SCMP) –829Test Procedures (STPr) –830 Requirements Specification (SRS) –1012Verification & Validation (SVVP/SVVR) –1016Design Description (SDD) –1058.1Project Management Plan (SPMP)

7 7 09/10/02 Issues 1063 Software User Documents (SUD) issued in 2001 CMM implementation – How do you satisfy the process needs against the documentation needs System complexity – separation of hardware and software End user needs – from planning, through development and maintenance

8 8 09/10/02 Issues Project size – stand alone processors to large systems using multiple processors Project implementation –Processors that are treated separately (vehicle systems) –Multiple processors treated as one (control systems)

9 9 09/10/02 Actions Taken Froze the input as of January 1, 2002 Accepted 12207 as the general guideline Confirmed that documents required are needed to comply with CMM requirements System functional requirements - not addressed only address software process

10 10 09/10/02 Standard Contents Life cycle model Document submittals Documents required Hard copy format

11 11 09/10/02 Life Cycle

12 12 09/10/02 Document Submittal (based on end user needs) Type 1 – Install and use Type 2 – Planning Type 3 – Requirements and interfaces Type 4 – Testing Type 5 – Complete documents

13 13 09/10/02 Document Submittal

14 14 09/10/02 Documents Required Project planning and oversight Elements – design and testing Release Documents required for all projects regardless of end user needs

15 15 09/10/02 Project Planning and Oversight Software Project Management Plan (SPMP) Software Quality Assurance Plan (SQAP) Software Configuration Management Plan (SCMP) Software Verification and Validation Plan (SVVP) Software Verification and Validation Report (SVVR)

16 16 09/10/02 Software Elements Software Requirements Specification (SRS) Interface Control Document (ICD) - optional Software Design Description (SDD) Database Design Description (DBDD) - optional Software Requirements Traceability Matrix (SRTM)

17 17 09/10/02 Software Elements Software Test Plan (STP) Software Test Procedure (STPr) Software Test Report (STR)

18 18 09/10/02 Software Release Software Version Description (SVD) Software User Manual (SUM)

19 19 09/10/02 Document Outline Tabular Form Column Listing –Section number –Change from reference standard –Content list –Applicability –Comments

20 20 09/10/02 Column Meaning Section - same for each document Change – identified if additional, modified or not required from reference standard Content – section title Applicability – mandatory or recommended (optional) Comment – provides additional information on usage or source

21 21 09/10/02 Sample Table - SQAP

22 22 09/10/02 Sample Table – STP

23 23 09/10/02 Hard Copy Format Title sheet – project name, document name, number and revision Inside title – revision history 1.0 Purpose Purpose, scope, objectives, software item covered, standards and maintenance

24 24 09/10/02 Hard Copy Format 2.0 References Documents, abbreviations and definitions 3.0 and higher Per the requirements for each document

25 25 09/10/02 Conclusions Document submittals – customer specified Documents required – all needed to support understanding, control and maintenance Hard copy format – if delivered in that media CMM – supports the process


Download ppt "1 09/10/02 WG12 Software Primer For RTVIS Committee September 10, 2002."

Similar presentations


Ads by Google