LAL Site Report Michel Jouvin LAL / IN2P3

Slides:



Advertisements
Similar presentations
automated single login access to Novell storage resources
Advertisements

LAL Site Report Michel Jouvin LAL / IN2P3
Chris Brew RAL PPD HEPiX Workshop Summery Brookhaven National Laboratory October Chris Brew CCLRC.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Wofgang Thöne, Institute For Scientific Computing – EGEE-Meeting August 2004 Welcome to the User.
LAL Site Report Michel Jouvin LAL / IN2P3
1/11/2000LDAP Status Report - HEPix - JLab 2000 LDAP Status Report Michel Jouvin LAL / IN2P3
Novell Server Linux vs. windows server 2008 By: Gabe Miller.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
Web hosting services at CERN Alex Lossent – CERN IT/IS Hepix Fall 2005.
GRIF Status Michel Jouvin LAL / IN2P3
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 TRIUMF SITE REPORT Corrie Kost Update since Hepix Spring 2005.
SharePoint Portal Server 2003 JAMES WEIMHOLT WEIDER HAO JUAN TURCIOS BILL HUERTA BRANDON BROWN JAMES WEIMHOLT INTRODUCTION OVERVIEW IMPLEMENTATION CASE.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
Storage Survey and Recent Acquisition at LAL Michel Jouvin LAL / IN2P3
Design Windows Media Services Infrastructure. Module 7: Design Windows Media Services Infrastructure Design Windows Media Services for live streaming.
Database Services for Physics at CERN with Oracle 10g RAC HEPiX - April 4th 2006, Rome Luca Canali, CERN.
UCL Site Report Ben Waugh HepSysMan, 22 May 2007.
26/4/2001VMware - HEPix - LAL 2001 Windows/Linux Coexistence : VMware Approach HEPix – LAL Apr Michel Jouvin
Chapter 4 COB 204. What do you need to know about hardware? 
Installation Overview Charles (Cal) Loomis & Mohammed Airaj LAL, Univ. Paris-Sud, CNRS/IN2P October 2013.
Technology Overview. Agenda What’s New and Better in Windows Server 2003? Why Upgrade to Windows Server 2003 ?  From Windows NT 4.0  From Windows 2000.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
Microsoft Application Virtualization 5.0: Introduction Mohnish Chaturvedi & Ian Bartlett Premier Field Engineer WCL312.
David Hutchcroft on behalf of John Bland Rob Fay Steve Jones And Mike Houlden [ret.] * /.\ /..‘\ /'.‘\ /.''.'\ /.'.'.\ /'.''.'.\ ^^^[_]^^^ * /.\ /..‘\
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility HEPiX – Fall, 2005.
30/10/2000 Software Installation and Maintenance at LAL - JLab 2000 Software Installation and Maintenance at LAL Michel Jouvin LAL, Orsay
Copyright © 2006 TietoEnator Corporation Using Community Tools To Improve Team Work Magnus Einarsson.
SLAC Site Report Chuck Boeheim Assistant Director, SLAC Computing Services.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
1 The new Fabric Management Tools in Production at CERN Thorsten Kleinwort for CERN IT/FIO HEPiX Autumn 2003 Triumf Vancouver Monday, October 20, 2003.
São Paulo Regional Analysis Center SPRACE Status Report 22/Aug/2006 SPRACE Status Report 22/Aug/2006.
LAL Site Report Michel Jouvin LAL / IN2P3
LAL Site Report Michel Jouvin LAL / IN2P3
Architecture and ATLAS Western Tier 2 Wei Yang ATLAS Western Tier 2 User Forum meeting SLAC April
HEPix April 2006 NIKHEF site report What’s new at NIKHEF’s infrastructure and Ramping up the LCG tier-1 Wim Heubers / NIKHEF (+SARA)
INFSO-RI Enabling Grids for E-sciencE SCDB C. Loomis / Michel Jouvin (LAL-Orsay) Quattor Tutorial LCG T2 Workshop June 16, 2006.
Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Usage of virtualization in gLite certification Andreas Unterkircher.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
Hosted SharePoint. Part 3/3: Office Live as a WSS solution Speaker Name Microsoft Corporation Hosted.
Microsoft Management Seminar Series SMS 2003 Change Management.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
26/4/2001LAL Site Report - HEPix - LAL 2001 LAL Site Report HEPix – LAL Apr Michel Jouvin
CERN Print Manager Michel Jouvin LAL / IN2P3
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
LAL Site Report Michel Jouvin LAL / IN2P3
Doug Benjamin Duke University. 2 ESD/AOD, D 1 PD, D 2 PD - POOL based D 3 PD - flat ntuple Contents defined by physics group(s) - made in official production.
Andrea Manzi CERN On behalf of the DPM team HEPiX Fall 2014 Workshop DPM performance tuning hints for HTTP/WebDAV and Xrootd 1 16/10/2014.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Drupal at CERN Juraj Sucik Jarosław Polok.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
1Maria Dimou- cern-it-gd LCG November 2007 GDB October 2007 VOM(R)S Workshop report Grid Deployment Board.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
1/11/2000LAL Site Report - HEPix - JLab 2000 LAL Site Report HEPix – Jlab Nov Michel Jouvin
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Juraj Sucik, Michal Kwiatek, Rafal.
Scientific Computing in PPD and other odds and ends Chris Brew.
Predrag Buncic (CERN/PH-SFT) Software Packaging: Can Virtualization help?
1 Update at RAL and in the Quattor community Ian Collier - RAL Tier1 HEPiX FAll 2010, Cornell.
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
The GridPP DIRAC project DIRAC for non-LHC communities.
Quattor tutorial Introduction German Cancio, Rafael Garcia, Cal Loomis.
Status of NICE/NT at INFN Gian Piero Siroli, Physics Dept. Univ. of Bologna and INFN HEPiX-HEPNT, SLAC, Oct.99.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
II EGEE conference Den Haag November, ROC-CIC status in Italy
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
CCIN2P3 Site Report - BNL, Oct 18, CCIN2P3 Site report Wojciech A. Wojcik IN2P3 Computing Center.
Christof Hanke, HEPIX Spring Meeting 2008, CERN
DAPNIA Site report.
GRIF : an EGEE site in Paris Region
Installation/Configuration
HEPix - SLAC 99 Michel Jouvin
Presentation transcript:

LAL Site Report Michel Jouvin LAL / IN2P3

12/10/2005LAL Site Report - HEPix - SLAC 2005 General News LAL has a new director : Guy Wormser LAL has a new director : Guy Wormser Strong support to GRID effort Strong support to GRID effort GRID group officially « blessed » GRID group officially « blessed » Leader : Cal Loomis (permanent position) Leader : Cal Loomis (permanent position) Formerly G. Wormser Formerly G. Wormser Coordination of LAL grid related efforts Coordination of LAL grid related efforts Not EGEE/LCG only : XtremWeb (collabarotion with CS) Not EGEE/LCG only : XtremWeb (collabarotion with CS) Computing engineers AND experiments members Computing engineers AND experiments members Involved in GRIF project Involved in GRIF project

12/10/2005LAL Site Report - HEPix - SLAC 2005 Main Resources NFS SMB Appletalk www Mail Print LSF Cluster Gb Ethernet DS20 PC (300)Mac (100) Linux Experiments (60 CPUs) DS20e 10 Mb Alpha Experiments (8 CPUs) Electronic CAD (20 Sun CPUs) 100 Mb 100 Go Xterm HDS TB FC GRID Fram (50 CPUs) HDS TB

12/10/2005LAL Site Report - HEPix - SLAC 2005 Main HW Changes 20 dual Opteron 2,2Ghz installed 20 dual Opteron 2,2Ghz installed 1/3 for GRIF T2 1/3 for GRIF T2 6TB installed, 9TB on order 6TB installed, 9TB on order ½ for GRIF T2 ½ for GRIF T2 2 Linux machines connected to SAN (QL2340) 2 Linux machines connected to SAN (QL2340) Single attachment, plan to look for path failover later Single attachment, plan to look for path failover later SRM based SE using LCG DPM (2 disk servers) SRM based SE using LCG DPM (2 disk servers) SATA extension to HDS 9570V SATA extension to HDS 9570V Acceptable cost : 12 k€ for 4,5 TB (Raid5) Acceptable cost : 12 k€ for 4,5 TB (Raid5) Very easy and flexible integration in current LAL infrastructure Very easy and flexible integration in current LAL infrastructure

12/10/2005LAL Site Report - HEPix - SLAC 2005 OS Updates Scientific Linux everywhere (3.0.5) Scientific Linux everywhere (3.0.5) Currently installed on all new machines (i386 or amd64, 32 bits) Currently installed on all new machines (i386 or amd64, 32 bits) Upgrade of RH 7.2/9 machines (25) by the end of year Upgrade of RH 7.2/9 machines (25) by the end of year Will be done with Quattor (fresh installation) Will be done with Quattor (fresh installation) Deploying LCG UI on all LAL physics servers (20) Deploying LCG UI on all LAL physics servers (20) Done with Quattor : easy to install and maintain Done with Quattor : easy to install and maintain VOMS with local VOs for non LHC users VOMS with local VOs for non LHC users

12/10/2005LAL Site Report - HEPix - SLAC 2005 Quattor In production for GRID and non GRID machines In production for GRID and non GRID machines Easy and flexible sharing of configuration information, removing duplication Easy and flexible sharing of configuration information, removing duplication Upgrade SL  done with Quattor Upgrade SL  done with Quattor Currently reinstalling all pre-Quattor machines Currently reinstalling all pre-Quattor machines Original CDB not used, replaced by SVN + http Original CDB not used, replaced by SVN + http Starting multi-sites usage for GRIF Starting multi-sites usage for GRIF 1 day Quattor tutorial held Sept. 30th 1 day Quattor tutorial held Sept. 30th DAPNIA : ½ day to setup specific configuration and install 2 test nodes DAPNIA : ½ day to setup specific configuration and install 2 test nodes Common configuration database, 1 Quattor server/node Common configuration database, 1 Quattor server/node

12/10/2005LAL Site Report - HEPix - SLAC 2005 Collaborative Tools : SPIP Web collaborative edition : SPIP Web collaborative edition : SPIP A « Content Management » solution A « Content Management » solution Collaborative/concurrent edition of Web pages Collaborative/concurrent edition of Web pages Individual authentication and privileges Individual authentication and privileges Basic workflow Basic workflow Easy site structure/navigation (re)organization Easy site structure/navigation (re)organization URLs independant of site structure URLs independant of site structure Forums Forums Look and feel customized through CSS Look and feel customized through CSS LAL implemented a Plone-like ( and a CNRS-like ( look and feel LAL implemented a Plone-like ( and a CNRS-like ( look and feelhttp://grif.frhttp:// Used by several LAL groups Used by several LAL groups Main LAL Web site, GRIF Web site, LAL support Main LAL Web site, GRIF Web site, LAL support

12/10/2005LAL Site Report - HEPix - SLAC 2005 Collaborative Tools : Trac Tools for project management integrating Tools for project management integrating A WiKi (based on MoinMoin) : A WiKi (based on MoinMoin) : An issue tracker (trouble ticket system) An issue tracker (trouble ticket system) Ticket submission through Web or Ticket submission through Web or A roadmap manager based on milestones A roadmap manager based on milestones A SVN browser A SVN browser Very clean plug-in API (0.9+) : all main features are plug-ins Very clean plug-in API (0.9+) : all main features are plug-ins Same model as Eclipse : Trac core is just a plug-in manager Same model as Eclipse : Trac core is just a plug-in manager Cross reference between all types of information Cross reference between all types of information Very attractive when you need documentation + action follow-up Very attractive when you need documentation + action follow-up SW development, computing operations, GRIF… SW development, computing operations, GRIF…

12/10/2005LAL Site Report - HEPix - SLAC 2005 Collaborative Tools : Agenda At the very beginning At the very beginning LAL director wants to publish its agenda… LAL director wants to publish its agenda… Web-based agenda sharing Web-based agenda sharing Currently using phpICalendar Currently using phpICalendar WebDAV upload/download of ICS files WebDAV upload/download of ICS files Compatible with a lot of clients : Mac, Sunbird, Mulberry… Compatible with a lot of clients : Mac, Sunbird, Mulberry… Interoperable with CERN CDS Agenda and (InDiCo) Interoperable with CERN CDS Agenda and (InDiCo) Difficult sharing between multiple writers (file granularity) Difficult sharing between multiple writers (file granularity)

12/10/2005LAL Site Report - HEPix - SLAC 2005 Windows Infrastructure IN2P3 forest still very successfull IN2P3 forest still very successfull 12 labs in production 12 labs in production Move of LAL AD domain to IN2P3 forest still delayed : lack of manpower Move of LAL AD domain to IN2P3 forest still delayed : lack of manpower Running well, management cost very low… Running well, management cost very low… New machines installed with WXP SP2 New machines installed with WXP SP2 No migration plan for WXP SP1 No migration plan for WXP SP1 Can be done on demand with SMS Can be done on demand with SMS Antivirus : successful move to McAfee Antivirus : successful move to McAfee + : MSI deployment + : MSI deployment