VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004.

Slides:



Advertisements
Similar presentations
1 The North West European Market Parties Platform Eric van Vliet, Stephan Krieger, Hans ten Berge Mini Forum of the Central West Electricity Regional Energy.
Advertisements

1 CDM Study October 19, 2011 Stan But Manager, Economics & Load Forecasting.
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
1 of 16 Evaluating an Information Project Building Consensus © FAO 2005 IMARK Investing in Information for Development Evaluating an Information Project.
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT ORGANISATION DE COOPÉRATION ET DE DEVELOPMENT ÉCONOMIQUES OECDOCDE 1 Agenda item 6b Revision of.
Status of Channel Models IEEE WG Session #7 March 15-19, 2004 Qiang Guo Editor, Channel Modeling Correspondence Group C /30.
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Plenary Meeting Portland, Oregon, USA July 12-16, 2004.
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Interim Meeting Berlin, Germany September 12-17, 2004.
1 Simplification & Harmonization: CPAP & AWP S and H Roll Out Countries Nairobi 25 – 27 June 2003.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
1 Cohesion Policy Evaluation Network Meeting: Brussels, October 2010 Ex post evaluation of cohesion policy interventions financed.
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
ACP / WG-N meeting July 2006, Brussels Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris.
First ICAO Global Symposium on TEM and NOSS Luxembourg November TEM & NOSS The EUROCONTROL Perspective Alexander Skoniezki Head of Business.
Joint FAA/Eurocontrol Future Communications Study (FCS)
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Outcome of Phase II Activities Presented at ICAO ACP.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
ACP WG B Work Program Frequency Planning Criteria
LINK2000+ Status Søren Dissing
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
Nav, Spectrum & Surveillance RPG for WRC-2007, ACP WGs B&F and NSP SSG, Bangkok Feb 2005 International Civil Aviation Organization Regional Preparatory.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
1 Proposal for methodology to estimate spectrum requirements for AMS(R)S satellite systems under AI 1.7 (WRC-11) Presentation at the ACP/WGF 19 th meeting.
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
FMG/5 september 2001 International Civil Aviation Organization 17th Meeting of Aeronautical Communications Panel Working Group B (ACP WG-B) Montreal, Canada.
VDL Mode 3 Cosite Interference Testing Summary WP-WGB1701A Attachment A International Civil Aviation Organization 17th Meeting of Aeronautical Communications.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
VDL 2 capacity simulations Conclusions on the capacity per VDL 2 channel Presentation by P. Delhaise.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
CARE Innovative ATM Research Workshop March, 2001 Vu Duong EUROCONTROL Experimental Centre.
Future Communications Roadmap
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Whole Airspace ATM System Safety Case - Preliminary Study
Population Change: 2005 versus 2004 More than 2% 1% to 2% 0% to 1% Less than 0% US: 0.94%
Wireless Communications with Channel Feedback
Marketing Planning Overview
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
International Civil Aviation Organization
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
Kpmg 1 Industry Consultative Group 14 July 2000 Broadband Fixed Wireless Access 40GHz BFWACG(00)36 Market and financial modelling Preliminary Findings.
Setting Next Year’s Standard Cost David Jones. ` Budget Year N Std Cost Year N -ve variance vs.Std cost +ve variance vs.Std cost €10 €8 Budget Year N+1.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
MODA-TEL An IST project on Model Driven Architectures for Telecommunications System Development and Operation.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
1 15/03/2016 VDL Mode 4 Co-Site Investigations Part I Co-Site Interference Scenarios Bertrand DESPERIER ISA TELECOMS.
1 June 23, 2010 Q Project Review OPERATIONAL APPLICATION, STC/TC & DATA COLLECTION PROJECT Project Review March 6, 2011.
Additional aviation spectrum allocation for AM®S
VDL 2 capacity simulations
International Civil Aviation Organization
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
Communications Operating Concept & Requirements (COCR)
VDL Mode 4 Cosite Investigations
VDL 2 capacity simulations
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Joint FAA/Eurocontrol Future Communications Study (FCS)
Item 5.1 of the agenda Preliminary results of LUCAS 2009 Part III
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Presentation transcript:

VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004

13-14/10/04COMT31 Cosite Investigations Plan Developed with the contribution of several parties at a meeting hosted by EUROCONTROL Identifies the required activities to complete the investigations Lays out a strategy for the test cases to be investigated

13-14/10/04COMT31 EUROCONTROL Work Plan Cosite Investigations work organised in three phases Phase 1: development of cosite interference testing scenarios and detailed testing plans (focus of current work); Phase 2: actual testing using the scenarios and tests defined in Phase 1; Phase 3: evaluation of test results

13-14/10/04COMT31 Scheduling of work Q Completion of Phase 1 Initiation of test campaign (Phase 2) Q Completion of Phase 2 Q3/Q Completion of Phase 3

13-14/10/04COMT31 Other related activities voice transmissions profile statistical analysis considering both ATC & AOC current usage of VHF voice radio based on data obtained from a major European airline proposes voice usage profile as input to cosite investigations voice receptions profile preliminary analysis considering signal levels only analytical-based and derives assumptions based on current airspace regimes

13-14/10/04COMT31 Current Work: Phase 1 Current Status development of detailed testing scenarios and testing plans Contract with ISA Telecoms to carry out Phase 1 Details will be presented by ISA TELECOMS