ADS-B in APAC and ADS-B Benefits The Global Voice of ATM

Slides:



Advertisements
Similar presentations
Global ATM Operational Concept
Advertisements

Regional RAIM Prediction System – Progress Report
Federal Aviation Administration GOLD Introduction By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar GOLD.
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
The global voice of ATM The Global Voice of ATM ANSP- INVESTMENTS FOR SAFETY IMPROVEMENTS IN INFRASTRUCTURE AND CAPACITY BUILDING.
The global voice of ATM The Global Voice of ATM The Need for Modernisation of ANSPs.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Basics of ADS-B Sharing Ho Wee Sin Principal Engineer (Surveillance) SEA/BOB ADS-B WG/8 – SP/11.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
Information Management The ICAO Perspective
Enabling air transport growth in the Asia Pacific region Oct 2014 Air Traffic Controllers’ Guild (India) Seminar, New Delhi.
Continuous Climb Operations (CCO) Saulo Da Silva
States’ Action Plans and Assistance to States
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
ATM Implementation Support by ICAO APAC RSO
B.PRADHAN,IAS CVO,AAI. Structure of Presentation  Background  Why need Next Gen ATS  What is Next Gen ATS  Benefits of Next Gen Systems  Conclusion.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
ACAC Seminar - Civil Military Coordination Rabat, September 2005 Jehad Faqir Director, Safety, Operations & Infrastructure AVIATION FUEL CRISIS Mitigating.
CANSO Role in ATFM/CDM in APAC
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
CANSO PBN Support Phil Rakena CANSO PBN SG co-Chair Regional PBN Champion [Airways New Zealand]
ASIA PACIFIC Air Traffic Flow Management
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE Agenda Item : Financial Matters Agenda Item : Financial Matters 3:
EUROCONTROL European Organisation for the Safety of Air Navigation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
EMISSIONS OPERATIONAL-MEASURES WORKING GROUP CAEP WG-4 REDUCING FUEL BURN THROUGH IMPROVED OPERATIONAL MEASURES Colloquium on Environmental Aspects of.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
The Global Voice of ATM Building ATM Capacity in the Middle East.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B in APAC and ADS-B Benefits The Global Voice of ATM
Workshop on preparations for ANConf/12 − ASBU methodology
ATM Implementation Support by ICAO APAC RSO
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making Module 5 “The Collaborative Environment”
Users’ Perspective of PBN Achieving Improvements
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Presented by United Arab Emirates
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE
Rome November 2008 Johan Martensson, CASCADE
Workshop on preparations for ANConf/12 − ASBU methodology
World-Wide CNS/ATM Systems Implementation Conference
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
The Need for Modernisation of ANSPs
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
Presentation transcript:

ADS-B in APAC and ADS-B Benefits The Global Voice of ATM

Background In July 2008, CANSO agreed to conduct a Cost Benefit Analysis for the ADS-B project over the South China Sea involving Indonesia, Vietnam and Singapore. The study was conducted with the support of IATA and CANSO members (FAA and CAAS) and completed in 2009. The global voice of ATM

Objectives To determine the benefits & costs of ADS-B implementation for the project As an example of good governance in developing a business case for the project To promote regional collaboration and harmonisation among ANSPs and users The global voice of ATM

Project Scope The global voice of ATM

Project Scope The global voice of ATM

Project Scope The global voice of ATM

Study Assumptions ADS-B data sharing across FIRs Provision of VHF communications to adjacent ANSPs when required Provision of radar-like separation in restricted airspace Analysis based on extrapolation of CAAS traffic data and IATA’s demand projections Estimated infrastructure cost The global voice of ATM

Traffic Demand Forecast Given the recent economic downturn and the volatility of projections, we conducted a sensitivity analysis based on the following scenarios: Low: 3% growth Medium: 5% growth High: 7% growth Note: The medium and most probable growth rate for air traffic is set at 5% based on IATA’s Forecast AAGR (2007-2011) for APAC which is 5.9% for pax and 5.4% for freight. The global voice of ATM

Aircraft Equipage Information presented at SEA ADS-B WG/1 in 2007 showed that about 60% of aircraft in the area were transmitting ADS-B data although this does not take into account the certification or accuracy of the data. A review of flights operating in the area from Jul- Oct 2008 reinforced this point, where 61.9% were assessed to be ADS-B capable. 25% of the remaining were assessed as retrofit ready (during scheduled maintenance) The global voice of ATM

Aircraft Equipage New aircraft delivered are all ADS-B capable Fleet retirements due to economic climate will enhance capabilities Retrofit timelines would be encouraged by an effective mandate With an effective mandate, more than 85% of aircraft would be ADS-B (Out) capable The global voice of ATM

Benefits - Optimum Flight Altitudes Examine fuel savings for flights that currently do not receive optimum altitude Examine flights that are currently delayed before receiving optimum altitude. ANSP A ANSP B ANSP C    DATA DATA DATA Optimum (Requested) Flight Level (FL) BENEFIT BENEFIT Assumed FL In FIR A Actual FL In FIR B Assumed FL In FIR C Destination Departure Estimated Elapsed Time The global voice of ATM

Benefits - Capacity Increase Examine delays due to limited capacity vs. the demand forecast. Examine hourly demand vs. hourly capacity and run a queuing model to estimate delay difference between baseline capacity and new ADS-B enabled capacity Monetize delay savings benefit in terms of reduced Aircraft Direct Operating Costs and Passenger Value of Time Example of Hourly Demand The global voice of ATM

Costs - Infrastructure ADS-B stations VHF radio & communications circuits ATM system upgrades where applicable Project management & training Recurrent costs e.g. maintenance and spares Supporting infrastructure if needed The global voice of ATM

Economic Analysis Net Present Value (NPV) [> 0] Business Case Net Present Value (NPV) [> 0] Benefit to Cost Ratio (B/C ratio) [> 1] Internal Rate of Return (IRR) [> Cost of Capital] Payback Year Example of outputs The global voice of ATM

Results of Cost Benefit Study (For a 5% medium traffic growth scenario) Annual savings of nearly 3 million lbs of fuel burn Annual reduction of 10 million lbs of CO2 emissions Total Economic savings of over US $ 4m annually IRR of 22% The global voice of ATM

Other Benefits Improved safety – enhanced tracking of aircraft, weather deviations etc Improved surveillance facilitates Search and Rescue efforts Environmental benefits – greater operational efficiency leading to lower carbon emissions Improved flight data collection for analysis and planning The global voice of ATM

Recommendation of SEA/BOB ADS-B WG/7 “ADS-B Out” based surveillance applications as modules be included in the Aviation System Block Upgrade Document. These modules should include: - Improved air traffic operations through provision of surveillance (using ADS-B or radar); - Improved access to optimum flight levels through climb/descent & cruise using ADS-B or radar; and Improved safety, efficiency and seamlessness using shared surveillance services across FIR boundaries. Post Meeting: ICAO Headquarters accepted this and agreed that an amended ASBU B0-85 Module would be developed to take this into account.

Cost Benefit Study for South China Sea project Completed and published in May 2009. Available to download from: www.canso.org/asiapacific

Project milestones for initial phase of ADS-B implementation over the South China Sea A Installation of ADS-B ground stations Natunas and Matak - completed Singapore - completed Con Son - 2H 2012   B Installation of VHF stations and links  Natunas and Matak - 1H2012 Conson - 2H2012 C Signing of ADS-B data and VHF radio facility sharing agreement i) Between Indonesia and Singapore - 2H2010 completed ii) Between Vietnam and Singapore - 2H2011 completed D Signing of LOA between Ho Chi Minh and Singapore ACCs - 1H2012 E Issue AIC on aircraft equipage mandate - 2H 2010 completed  F Technical Monitoring of ADS-B operations - 1H 2012 G Operational trial and implementaion - 2H 2012/implementation 2H2013 H Exclusive ADS-B operations for L642 and M771 above FL290 - 2H2013

CIVIL AVIATION AUTHORITY CANSO ADS-B SEMINAR FOR CIVIL AVIATION AUTHORITY OF THE PHILIPPINES 11 August 2010, MANILA

Proposed ADS-B coverage for additional high density routes over the South China Sea Manila N884 M771 L642 Quezon Pahlawan Con Son M767 Brunei Natuna Matak Singapore Routes benefitting from the additional coverage Operational Trials on L642 and M771 Current ADS-B Project Coverage Proposed ADS-B Coverage

Automatic Dependent Surveillance – Broadcast (ADS-B) Seminar for Department of Civil Aviation, Myanmar Civil Aviation Training Institute, Yangon 22 February 2011

Myanmar ADS-B Implementation Plan Radar ADS-B Lashio Airport Manday International Airport Kyaing Tone Airport 5 ADS-B stations proposed Sittwe Airport 3 SSR radar for En-route 1 PSR for Terminal Yangon International Airport Pathein Airport Coo co island Airport Myeik Airport

Potential ADS-B coverage for high density routes over Bay of Bengal Calcutta Bubaneshwar Sittwe Vishakhapatnam Mahanadi Basin Pathien Coco Island Bangkok Krishna-Godavari Basin Chennai Andaman Nicobar Basin Port Blair Trincomalee Car Nicobar Phuket Aceh High Density Routes over Bay of Bengal Potential ADS-B coverage from sites on land Potential ADS-B coverage from offshore sites

48th DGCA CONFERENCE Action Item 48/4:   Recognising that the full benefits of ADS-B would only be achieved through harmonized implementation, the Conference urges States and Administrations to expedite ADS-B implementation and share with ICAO Regional Office their implementation plans.

Regional Collaboration The global voice of ATM

In 2009 intra-Asia Pacific travel eclipsed North America In 2009 intra-Asia Pacific travel eclipsed North America as the world’s largest aviation market. The global voice of ATM 31

The Global Voice of ATM The global voice of ATM CANSO Headquarters Transpolis Schiphol Airport Polaris Avenue 85e 2132 JH Hoofddorp the Netherlands tel: +31 (0)23 568 5380 fax: +31 (0)23 568 5389 email: info@canso.org The global voice of ATM