PLANNING FOR A GLOBAL ATM SYSTEM

Slides:



Advertisements
Similar presentations
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
By: Michael A. Cirillo, Vice President, Air Traffic Organization, System Operations Services Date:March 27, 2007 Federal Aviation Administration Performance.
Regional RAIM Prediction System – Progress Report
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.
Introduction to Navigation Specifications
System of Systems (DRAFT) To be approved by the ICAO Council
Module N° 6 – SMS regulation
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Overview of the PBN Airspace Implementation Processes
Global Air Navigation System ~ Planning Mechanisms ~ H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation.
H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.
Global Air Navigation Plan
Mission Trajectory Step 1 From planning to deployment.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Workshop on preparations for ANConf/12 − ASBU methodology
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Essential Cell Biology
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
1 Phase III: Planning Action Developing Improvement Plans.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
PSSA Preparation.
Information Management The ICAO Perspective
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Performance Framework for Efficiency H. Sudarshan SIP/ASBU/2012 -WP/5 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
PBN Airspace Concept Process
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Performance Framework for Efficiency H. Sudarshan
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Global Air Navigation System ~ Planning Mechanisms ~
Performance Framework for Efficiency H. Sudarshan
SIP/2012/ASBU/Nairobi-WP/7
Global ATM Operational Concept
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
ANConf/12 – Agenda H. Sudarshan
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
ANConf/12 – Agenda H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Air Navigation Bureau
Presentation transcript:

PLANNING FOR A GLOBAL ATM SYSTEM ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt

Presentation Outline Historical Successes Global Air Traffic Management What is it How do we get there Eleventh Air Navigation Conference Partnering with Industry Global Plan (Initiatives) Achieving a global ATM system Regional Integration Measuring success

Historical: path toward Global ATM 2010 and beyond

Successes Standards and Guidance Material Air Traffic Management ATM system requirements Transition strategies Performance framework PANS-ATM amendment for to allow use of systems other than radar for ATS PANS-ATM amendment for use of GNSS for longitudinal separation Comparative assessment between ADS-B and radar RNP approach procedures

Successes Standards and Guidance Material Communications Draft SARPs and Manual on Universal Access Transceiver (UAT) Significant amendment to AMSS SARPs Introduction of elements of Internet protocol suite (IPS) in the ATN Navigation New SARPs and manual on the concept of performance based navigation SARPs for GRAS and criteria for approach procedures with vertical guidance SARPs for new GNSS signals (GALILEO-GLONASS, new GPS) Surveillance SARPs for Mode S and extended squitter

Global Air Traffic Management What is it, how do we get there INTEROPERABILITY SEAMLESS SAFETY

IT IS A Worldwide system that achieves interoperability and seamlessness based on: Physical interconnectedness Homogeneous ATM areas and Major Traffic flows Common requirements, Standards and procedures Integration (TMAs, aerodromes) Performance based equipment carriage requirements Seamless safety across all regions For all users during all phases of flight Provides for optimum economic operations Environmentally……. Meets security……..

Physical Interconnectedness Major traffic flows-ATM Homogeneous ATM areas

Interoperability-Seamlessness, Equipment carriage Procedures, Integration, ATS-ATFM-ASM, Safety ATM operational concept Industry Roadmap (drive) Global Air Navigation Plan Initiatives Regional Air Navigation Plans (based on) Global Plan Initiatives Performance objectives Global Air Navigation Safety Plan Safety Management Systems Safety Oversight Audits Transparency

Eleventh Air Navigation Conference How we get there Endorsed the global ATM operational concept Requested ICAO to: develop ATM system requirements address interoperability and seamlessness define requirements for global AIM publish the operational concept amend the Global Plan harmonize interregional AN systems establish an ICAO air navigation database develop a performance framework

Eleventh Air Navigation Conference (AN-Conf/11) — Outcome That States and PIRGs consider the Global Air Navigation Plan for CNS/ATM Systems as a catalyst for change, providing a global safety and interoperability framework while allowing regional or local adaptation to efficiently meet regional and local needs

Partnering with Industry ANC Industry Meeting – Conclusions That those industry partners in a position to do so, work together toward the development of a common roadmap/global action plan, aimed at attaining operational benefits in the near to medium term for inclusion in the ICAO Global Air Navigation Plan

Partnering with Industry To ensure that the capabilities and capacities offered through existing aircraft equipage, ATM infrastructure and ATC systems is utilized to the maximum extent possible To deliver transitional benefits while we continue our evolution

Global Plan as a transition roadmap Revised Global Plan developed on the basis of Recommendations of AN-Conf/11 Global ATM Operational Concept, which provides the target system Industry Roadmap, which provides the near and medium industry requirements Global Plan provides guidance on environment, business case, costs, human resources, etc.

Transition Strategy

Global Plan Initiatives (GPI) Options for ATM improvements Relate to ATM objectives in current version of Global Plan Result in direct performance enhancements Meet performance objectives Based on Industry Roadmaps and current regional activities Bring near- and medium-term benefits to aircraft operators

What is new in the revised Global Plan? No Current version New version 1 Covers only CNS and ATM elements; known as Global ANP for CNS/ATM systems Expands to related elements such as AIS/AGA/MET thus known as Global ANP 2 ICAO developed with indirect participation from industry and States ICAO developed with direct participation from industry and States

What is new in the revised Global Plan? No Current version New version 3 Extends to near-mid-long- term Restricted to near-and mid-term, with long-term to be addressed through ATM operational concept 4 Focuses on objectives & systems Relates to Performance 5 P (paper)–based E (electronic)–based

What is new in the revised Global Plan? No Current version New version 6 Provided passive harmonization Ensures active harmonization 7 Implementation based on 45 objectives and systems 45 objectives have been refined and aligned to performance based 23 Global Plan Initiatives 8 Does not support planning tools for its implementation Number of planning tools (software, web-based, project mgt, etc.) available

Approach to implementation The approach to implementation of GPIs builds on: progress already achieved experience gained by PIRGs in the previous cycle of CNS/ATM systems implementation process existing capabilities of the air navigation systems; and successful regional implementation

Global Plan Initiatives (GPI-5) Area Navigation (RNAV) and Required Navigation Performance (RNP) Scope: The incorporation of advanced aircraft navigation capabilities into the air navigation system infrastructure. Related ATM objectives: Application of required navigation performance; Application of required surveillance performance; Reduced longitudinal separation; Reduced lateral separation

Example of GPI RNAV and RNP Area of Application Nav accuracy Designation of navigation standard: Current situation Designation of navigation specification: PBN concept (new) Oceanic/ Remote 10 RNP 10 4 RNP 4 EnRoute- Continental 5 RNP 5 Basic RNAV RNAV 5 En Route - Continental and Terminal 2 USRNAV type A RNAV 2 RNP 2 Terminal 1 USRNAV type B and P-RNAV RNAV 1 RNP 1 Simplification, reduced costs for operators and ANSPs

RNAV and RNP Seamlessness

Global Plan Initiatives (GPI-4) Alignment of upper airspace classifications Scope: The harmonization of upper airspace and associated traffic handling through application of a common ICAO ATS Airspace Class above an agreed division level. Related ATM objectives: nil

Global Plan Initiatives (GPI-1) Flexible use of airspace Scope: The optimization and equitable balance in the use of airspace between civil and military users, facilitated through both strategic coordination and dynamic interaction. Related ATM objectives: Airspace desegregation/flexible use of airspace

Global Plan Initiatives (GPI-9) Situational awareness Scope: Operational implementation of data link-based surveillance. The implementation of equipment to allow traffic information to be displayed in aircraft supporting implementation of conflict prediction and collaboration between flight crew and the ATM system. Improve situational awareness in the cockpit by making available electronic terrain and obstacle data of required quality. Related ATM objectives: application of data link; Functional integration of ground systems with airborne ; ADS; ADS-B; SSR Mode S

Global Plan Initiatives (GPI-10) Terminal area design and management Scope: The optimization of the terminal control area (TMA) through improved design and management techniques. Related ATM objectives: Application of RNP; Functional integration of ground systems with airborne systems; Independent IFR approaches to closely spaced runways; Curved and segmented approaches; Application of data link; WGS-84

Global Plan Initiatives (GPI-17) Implementation of data link applications Scope: Increase the use of data link applications. Related ATM objectives: Application of data link; Functional integration of ground systems; with airborne systems; ATS inter-facility data communication (AIDC)

Global Plan Initiatives (GPI-18) aeronautical Information Scope: To make available in real-time, quality assured electronic information (aeronautical, terrain and obstacle). Related ATM objectives: Functional integration of ground systems with airborne systems; ATS-inter-facility (AIDC) communications

Global Plan Initiatives (GPI-23) Aeronautical Radio Spectrum Scope: Timely and continuing availability of adequate radio spectrum, on a global basis, to provide viable air navigation services (communication, navigation and surveillance).

Global Planning Methodology

Work Programme (iterative process) Identification of “gaps” in performance GPIs evaluated against these gaps to identify those that would most appropriately provide the operational improvements necessary to meet performance objective(s) development of scenarios for implementation of initiatives, cost-benefit analyses of the various scenarios and preliminary development of infrastructure support requirements Additional steps: development of implementation plans and funding profiles, further review of human resource requirements to support the identified initiatives, followed by further cost-benefit analyses National and regional implementation plans developed or amended based on the selected initiatives Planning tools will assist planners in carrying out the above steps

Business Planning and work programme

Business Planning and work programme

Focus for NAM/CAR-GREPECAS Optimize ATS route structure in both terminal and en-route airspace GPI 4 Alignment of upper airspace classifications GPI 5 RNP and RNAV implementation (RNAV 5) GPI 7 Dynamic and flexible ATS route management GPI 8 Collaborative airspace design and management GPI 10 Terminal area design and management GPI 11 RNP and RNAV SIDs and STARs GPI 12 FMS based arrival procedures Improve demand and capacity balancing GPI 6 Air traffic flow management Enhance civil/military coordination and cooperation GPI 1 Flexible use of airspace Align upper airspace classification GPI 4 Alignment of upper airspace classification Implement RNP approaches

Measuring success Success of ICAO Business Plan and timelines Success of the Global air navigation system capacity efficiency environment flexibility interoperability safety

Expectations

Current Global Plan Baseline The current Global Plan provides a static representation of the ATM Enhancement timeline The regions have incorporated this format into their CNS/ATM implementation plans Although this static format was useful to provide a survey and planning framework it does not provide adequate visibility of current implementation status.

Global Plan Transition A stated objective of the updated Global Plan is the transition to a living document A dynamic reporting system will allow management visibility into the current status of program activities A common reporting format will allow ICAO to a establish measurable progress at both global and regional levels.

Efficiency Objective: Implementation of a seamless, global air traffic management system that will enable aircraft operators to meet their planned times of departure and arrival and adhere to their preferred flight profiles with minimum constraints and without compromising agreed levels of safety. Supported by Global Plan Initiatives that: Maintain Operational Safety Improve System Operational Performance Harmonize Global Interoperability Minimize Costs Enable Transition Security Environment Ensure Separation Physical Capacity Delay Access Flexibility Efficiency Predictability Time value Infrastructure Communications Noise Security of benefit Information Equipage Scalability Navigation Emissions Security Cost benefit Transition Surveillance equity O & M Databases Data exchange Performance Based Regulation Efficiency Metric Elements

Thank you for your attention !!!