Seite 0 11,80 7,40 5,40 0 FRMS - Experience within FTLs Implementing and maintaining a performance driven FRMS FRMS Forum MontrealCpt. Kristjof Tritschler.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

Impact Assessment in the policy cycle at the European Commission
A 2030 framework for climate and energy policies Marten Westrup
Planning Reports and Proposals
Human Factors in Flight Operations A CAA Perspective
1. International Module – 503 Noise: Measurement & Its Effects Day 5.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 16 Unemployment: Search and Efficiency Wages.
Copyright © 2002 Pearson Education, Inc. Slide 1.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Module N° 4 – ICAO SSP framework
1 Welcome Safety Regulatory Function Handbook April 2006.
1 Regulation. 2 Organisational separation 3 Functional Separation.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
The Safety Analysis Methodology EHEST Conference 13 October 2008 Cascais, Portugal.
EASA and the EU Regulatory Framework
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
Gender Equality and Diversity Planning at workplaces Introduction to the European project Gender Equality and Diversity Planning at workplaces
Foreign Air Operator Validation & Surveillance Course
Greg Down 2 nd ICAO Global TEM & NOSS Symposium FAA – Washington, DC Normal Operations Safety Surveys The NAV CANADA Experience.
Experiences on the road to Fatigue Risk Management Regulation
Cláudia Cabaço Flight Safety Assistant Manager FRMS Challenges of an On-demand Operator 1 st September 2011.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
FRMP and FRMS Overview.
1 ICAO TRAINING INSTITUTE (Kyiv, Ukraine) The ICAO Training Institute had been established at the National Aviation University in 2003 to provide high.
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
ICAO State Safety Programme (SSP) Implementation Course
ICAO Safety Management Systems (SMS) Course
Prescription / Performance
Module N° 6 – SMS regulation
K Jones – ICAO FRMS Symposium 2011 Can Regulators be Confident that an FRMS Provides an Acceptable Level of Safety? ICAO FRMS Symposium August 2011.
Module N° 10 – Phased approach to SSP and SMS implementation
Module N° 7 – Introduction to SMS
Date The National Airlines Council of Canada: Challenges to the Implementation of FRMS September 02, 2011.
1 NEXTOR Monitoring and Modeling NAS Performance at the Daily Level Mark Hansen Performance Metrics TIM May 2002.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
LLM 2010/11 EU Environmental Law I The EU on the International Stage.
Flight Time Limitations for Business Aviation A Snapshot of EBAA Activity Andrea Němec Manager Safety and Rulemaking BBGA Annual Conference 12 March 2013.
EMS Checklist (ISO model)
Presentation of the proposed Annex 19 – Safety Management
ICAO Harmonized Safety Management Requirements – The Safety Concern ICAO Harmonized Safety Management Requirements – The Safety Concern Captain Daniel.
1 Practical and Business Implications of Basel 2 for UK Mortgage Lenders. Bruce T Porteous 29 April 2004.
Subsidy Contract Lead Partner seminar October 2008, Riga Arina Andreičika Managing Authority
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
Evaluation of an intervention to increase online filing of individuals’ tax returns Peter Lumb September 2009.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Chapter 5 Test Review Sections 5-1 through 5-4.
Addition 1’s to 20.
25 seconds left…...
European Helicopter Safety Team (EHEST) July 2014 Prepared by Michel MASSON, EASA, EHEST Secretary.
Week 1.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
We will resume in: 25 Minutes.
Safety / Performance Criteria Agreeing on Assumptions 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Why may Fatigue be a safety concern? Associated with performance declines –Less vigilant –Increasingly variable, overall slower reaction times –Forgetfulness.
CONFIDENTIAL Validation of Fatigue Models through Operational Research Lydia Hambour FRMS Safety Manager easyJet & Dr Arnab Majumdar, LRET TRMC Imperial.
SMS, Human Factors and FRMS – A Perspective Capt. Dan Maurino RAeS HF Group Conference on Building Fatigue into Safety Systems Crawley, 30 October 2012.
FATIGUE RISK MANAGEMENT SYSTEMS (FRMS) A PILOT’S PERSPECTIVE
Flight and Duty Time Limitations and Rest Requirements Fatigue Risk Management Virgilijus Valentukevicius, EASA.
Presentation transcript:

Seite 0 11,80 7,40 5,40 0 FRMS - Experience within FTLs Implementing and maintaining a performance driven FRMS FRMS Forum MontrealCpt. Kristjof Tritschler Manager FRMS 01. September 2011MSc Air Safety Management

Seite 1 11,80 7,40 5,40 1 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 2 11,80 7,40 5,40 2 Germanwings Based in Germany, operation under European law (EU OPS SubpartQ) Low Cost Carrier (LCC principle: maximum aircraft & crew utilization) Schedule is compressed, short turn around times of 25min Mainly short haul, minimum flight duration 40min, maximum 4:00h Flight operations is around the clock 24/7 Aircraft and crew return to home base after each duty Unionized from the start (Labor Agreements) Germanwings offers a bidding system to its crews Its the first German Airline managing fatigue trough an FRMS.

Seite 3 11,80 7,40 5,40 3 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 4 11,80 7,40 5,40 4 Chronology: From tired flight crews to a performance driven FRMS Oct 2002Start of Flight Operations Germanwings Oct 2005 CRM recurrent training topic: Fatigue & Vigilance Aug 2006 First fatigue survey Dec 2006Report databank analysis identified fatigue as a problem Jan 2007 Proposal: Alertness Management Program Mar 2007 Decision by senior management to implement FRMS, Policy signed May 2007 Initial meeting FSAG Jan 2008 Official application of scientific (additional) roster rules Sep 2008 Scientific study of Workload & Fatigue by DLR Dec 2008 Fatigue software introduced for performance monitoring Feb 2009 First Fatigue Management Training for crew schedulers May 2010 New senior management, new FRMS policy signed Mar 2011Fatigue model-based optimizing of rosters Aug 2011First predictive performance indicators.

Seite 5 11,80 7,40 5,40 5 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 6 11,80 7,40 5,40 6 Roster Design Lifestyle &Sleep Workload Fatigue Management Framework Some say, fatigue is all about sleep Others say, its the roster that makes people tired Is FRMS the solution to cope with increasing demands? Increasing cost pressure requires less people to take more work

Seite 7 11,80 7,40 5,40 7 Roster Design Lifestyle &Sleep Workload Management Duties Fatigue Management Framework Companys Responsibility Individual Responsibility

Seite 8 11,80 7,40 5,40 8 Roster Design Lifestyle &Sleep Workload Management Duties Fatigue Management Framework We need both sides!

Seite 9 11,80 7,40 5,40 9 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 10 11,80 7,40 5,40 10 The Fatigue Safety Action Group (FSAG) FSAG Flight Safety Network Development Flight Ops Fleet RosteringOCCUnion Independence, methodologies, science, risk ass. Airline-schedule destinations airport slots Resources: pilots/crew Assign schedule to crews Adjust schedule (and duties) to real demand The crew on duty: actually perform the flights

Seite 11 11,80 7,40 5,40 11 Fatigue Safety Action Group (FSAG) FSAG Principles: All recommendations must be - relevant for specific operations based on scientific data consistent with companys business objectives The FSAG provides recommendations only- Decissions are up to the Safety Review Board, according risk assessment and effectiveness of recommendations. All participants of the FSAG are non decision makers (!)

Seite 12 11,80 7,40 5,40 12 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 13 11,80 7,40 5,40 13 Multilayered Defenses to Control Fatigue Risk (SIRA) Fatigue / 24h Ops FTLFTL Fatigue RulesFatigue Rules Fatigue ModelFatigue Model Terminate DutyTerminate Duty Bad Decission / Accident Frequency exposure Tired Crew on Duty PreventRecover Undesired State Conse- quence Unfit to Fly Unfit to Fly On Job StrategyOn Job Strategy Prev StrategyPrev Strategy Fatigue Investigation Fatigue Reporting Fatigue Performance Labor AgreementLabor Agreement

Seite 14 11,80 7,40 5,40 14 Multilayered Defenses to Control Fatigue Risk (SIRA) Fatigue RulesFatigue Rules Fatigue ModelFatigue Model PreventRecover On Job StrategyOn Job Strategy Prev StrategyPrev Strategy Fatigue Investigation Fatigue Reporting Fatigue Performance Fatigue / 24h Ops FTLFTL Terminate DutyTerminate Duty Bad Decission / Accident Frequency Tired Crew on Duty Undesired State Conse- quence Unfit to Fly Unfit to Fly Labor AgreementLabor Agreement Measurable Improvement Less high sev. reports Less incidents with fatigue SIRA: 10 -9

Seite 15 11,80 7,40 5,40 15 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 16 11,80 7,40 5,40 16 If we want to manage it – we need to measure it: SPIs Several Safety Performance Indicators (SPIs) are defined One is explained here – It is based on software results according scientific alghorithms It is an example – no competition !!!

Seite 17 11,80 7,40 5,40 17 FRMS – Experience within FTLs 5Fatigue Performance3 Fatigue Safety Action Group FSAG2Fatigue Management Framework1Chronology4 Multilayered Defenses6Conclusions0Germanwings

Seite 18 11,80 7,40 5,40 18 Conclusions after 5 years of managing fatigue through FRMS Managing fatigue is a shared responsibility – dont forget the other side The FSAG is a benefit itself Principles for FSAG are indispensable (specific, scientific, economic) Fatigue Software beneficial for performance monitoring & assessment The main conclusion concerning rostering in fatigue management: It is not the single duty which causes high levels of fatigue! It is the sequence of duties and how humans can adopt to it! This results in manageable rosters without loss in productivity.

Seite 19 11,80 7,40 5,40 19 Last Slide: Implementation of a FRMS is beneficial even within FTLs and labor agreements We can demonstrate a reduction of fatigue risk with high(er) crew productivity at the same time Today we consider a performance driven FRMS the best way to manage fatigue.

Thank you for your attention!

Seite 21 11,80 7,40 5,40 21 Why introducing FRMS within existing FTLs? Operational experience showed fatigue evidence Fatigue risk mitigation was obviously inefficient through compliance to prescriptive FTLs and labor agreements Maximum crew productivity not fully achieved before No off the shelf solution available to manage fatigue risk EU-OPS Q: transfers responsibility to manage fatigue to the operator and individual crew members ICAO Annex 6: SMS requires operators to keep all hazards at or below an acceptable level of risk.