Regional RAIM Prediction System – Progress Report

Slides:



Advertisements
Similar presentations
Role , Responsibility and achievements of SARI 145 Working Group
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
APEC GNSS Implementation Team and Outcomes of APEC GIT 16
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Briefing on APANPIRG Priorities and Targets
Regional Preparatory Workshop for the ITU WRC-2015
Presentation of the proposed Annex 19 – Safety Management
International Civil Aviation Organization
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.
49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October Presented by the International.
PBN ICAO HQ Activities Overview
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Nadia Konzali Project Coordinator, COSCAP-GS
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
Pan regional ICD for AIDC structure and status (SP/09)
African Aviation Training Organization
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
GNSS Integrity John Wilde CEO, DW International. Agenda About DW International Basic GNSS Principles Navigation System Performance – RNP RAIM on the Ground.
Thailand GNSS & PBN Implementation
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
International Civil Aviation Organization REGIONAL GNSS RELATED ACTIVITIES Secretariat ICAO APAC OFFICE GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
From RNP Divergence to Performance Based Navigation Convergence
AEROTHAI Progress of the APEC GNSS Test Bed 28 th APEC Transportation Working Group Meeting Vancouver, Canada, 4-8 September Progress of the APEC.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
APAC PBN Seminar F.LECAT (ICAO)
PBCS Workshop May 2013, Bangkok
APEC GNSS Implementation Team and Outcomes of APEC GIT 16
Performance-Based Communication and Surveillance (PBCS)
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Performance Based Navigation The Future
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
the International Civil Aviation Organization
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
John Wilde CEO, DW International
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Performance Based Navigation –Civil Aviation Authority Actions
PBN ICAO HQ Activities Overview
International Civil Aviation Organization
Presentation transcript:

Regional RAIM Prediction System – Progress Report Presented by Thailand ICAO Asia-Pacific GNSS Seminar 26 March 2012 Bangkok, Thailand 1

Regional RAIM Prediction System 2

Introduction GNSS is considered a main navigation infrastructure GNSS is now becoming a critical component of surveillance system, such as ADS-B Unpredicted outage of GNSS services can cause undesired interruptions on aircraft operations. 3 3

What is RAIM? Receiver Autonomous Integrity Monitoring (RAIM) provides integrity monitoring of GNSS satellites for aviation applications. RAIM utilizes redundancy of satellite signal measurements combined with aircraft barometric altitude equipments to detect any faulty satellite signal based on satellite geometry and probability analysis. 4

Operational Requirements - ICAO Annex 10 and ICAO PBN manual require States and Air Navigation Service Providers (ANSPs) to provide timely warnings of GNSS RAIM outages. RAIM prediction results are needed daily by pilots, flight dispatchers, air traffic controllers and airspace planners. The use of appropriate RAIM prediction services is considered a necessary part of GNSS approvals. RAIM prediction is required for en-route, terminal area, and approach operations. 5 5

Regional RAIM Prediction System A common, regional RAIM prediction services for a region can proved to be an effective solution. By harmonizing RAIM prediction information among States, we will - enhance seamless air traffic operation; - provide cost-effective investment solution; - create a forum to share knowledge and experiences. 6 6

Regional RAIM Prediction System ICAO APANPIRG tasks ICAO PBN Task Force to examine the feasibility of establishing a regional RAIM prediction system. At GIT 13 and GIT 14, the APEC GIT has expressed its willingness to work cooperatively with ICAO PBN Task Force to support the establishment a regional RAIM prediction services. 7 7

Outcome from ICAO APAC PBN TF/6 ICAO APAC PBN TF/6 Meeting - February 2010, Hong Kong The PBN TF noted that the proposal is also in line with ICAO APANPIRG Decisions 20/38 and 20/39 which tasks the ICAO PBN Task Force to examine the feasibility of establishing a regional RAIM prediction system and invite ICAO to develop guidance material on establishing common implementation rules and technical standards for GNSS reporting and prediction requirements. The PBNTF also noted that the 46th DGCA Conference encourages States to support and place priority on the ICAO Task Forces and work programmes for the Asia-Pacific. Proposals on specific mechanisms, such as a regional RAIM prediction service, could also be looked into. 8

Outcome from ICAO APAC PBN TF/6 8.2.4 The PBN TF was informed that The APEC GNSS Implementation Team (GIT), a team established under the Asia-Pacific Economic Cooperation (APEC) Transportation Working Group, during its thirteenth meeting in 2009, has expressed its willingness to work cooperatively with ICAO PBN Task Force to support the establishment of a regional RAIM prediction service. The PBNTF also noted with appreciation that Thailand through AEROTHAI is willing to serve as a project coordinator for this important regional activity. 8.2.5 The PBNTF agrees in principle to the establishment of a regional RAIM prediction system and cooperation between the ICAO PBN TF and the APEC GIT. 9

Outcome from ICAO APAC PBN TF/7 ICAO APAC PBN TF/7 Meeting, September 2010, Bangkok 7.1.5 The PBNTF agrees in principle the establishment of a regional RAIM prediction system and cooperation between the ICAO PBN TF and the APEC GIT. The PBNTF also endorses the Minimal Technical and Operational Requirements for a Regional RAIM Prediction System as followings: 7.1.6 Basic Common Denominator - Noting the differences among different RAIM algorithms on-board different aircraft, a regional RAIM prediction system provided by a service provider, such as an ANSP, should provide a “basic common denominator” RAIM prediction service for “basic” GNSS receivers, such TSO-129 (Fault Detection) and TSO-145/146 (Fault Detection and Exclusion). 10

Outcome from ICAO APAC PBN TF/7 7.1.7 Prediction Period – A regional RAIM prediction system shall provide prediction for RAIM outage and number of GNSS-satellite availability for a 72 hour period using the latest available GPS NANU. 7.1.8 Approach Operations - A regional RAIM prediction system shall support aircraft approach operations based on RNP APCH (with/without Baro-VNAV) navigation specification. The system shall calculate the predicted RAIM availability for a 72 hour period for specific Aerodromes. The algorithms shall address the RAIM requirements for GNSS receivers operating in Approach operations (±0.3NM). Both the Fault Detection (FD) and Fault Detection and Exclusion (FDE) algorithms shall be provided. The system shall calculate the predicted RAIM availability at the Aerodrome Reference Point (ARP) for baro (pressure altitude) aided and non-baro aided GNSS user equipment at 1 minute intervals or better. 11

Outcome from ICAO APAC PBN TF/8 ICAO APAC PBN TF/8 Meeting, May 2011, New Delhi ICAO PBN TF/8 was informed that AEROTHAI had approved the initial investment for the establishment of the APAC Regional RAIM Prediction System to support ABAS (Aircraft Based Augmentation System), not SBAS and GBAS. Initial operation for the Bangkok FIR is expected in June 2012. The system would be capable of providing RAIM prediction services for all participating States within the Asia/Pacific Region within 2012. 12

Outcome from ICAO APANPIRG 22 ICAO APANPIRG 22 – September 2011 Conclusion 22/24 – Endorsement of minimum Technical and Operational Requirements for a Regional RAIM Prediction System That, the States in the Asia/Pacific Region be encouraged to participate in the Regional RAIM Prediction System and the Minimum Technical and Operational Requirements for ASIA/PAC Regional RAIM Prediction System provided be adopted. 13

Regional RAIM Prediction System: Current progress AEROTHAI is finalizing the procurement. Expect initial operation for Bangkok FIR in June 2012. Under a cost-sharing arrangement, APAC ICAO Member States and APEC Economies are invited to share-used the system. 14 14

Thank you for your attention.